Details

    • Type: Task Task
    • Status: To Do To Do (View Workflow)
    • Priority: Normal Normal
    • Resolution: Unresolved
    • Affects Version/s: None
    • Fix Version/s: None
    • Component/s: UCMDB
    • Labels:
    • Customer:
      Mobinets

      Description

      During testing of the RB functionality on the local platform, a sample route generated by RB is required for validation.

      We request assistance in providing a small XML sample for a RAN node that includes all the necessary data to allow route construction. The XML should contain at least the following information:

      • Source RAN node
      • Site information
      • Physical configuration
      • Core node
      • Site information
      • Physical configuration
      • Additional informaton data required to build the RAN logical interface
      • Nodes related to the MW (microwave) part, including any relevant configuration required for the route generation

      The objective is to use this XML sample to simulate and verify the RB-generated route within the local testing environment.

        Activity

        Subversion JIRA

        Links Hierarchy

         Documentation

        Invalid license: EXPIRED

        Aurobinda Panda made changes -
        Time Spent 1 hour, 30 minutes [ 5400 ] 2 hours, 30 minutes [ 9000 ]
        Worklog Id 295643 [ 295643 ]
        Aurobinda Panda logged work - 27/Mar/26 12:00 AM
        • Time Spent:
          1 hour
           

          Discussion with Bessem for the details.

        Aurobinda Panda made changes -
        Baseline Start 2026-03-12 24:00 (set baseline based of initial work logging)
        Baseline End 2026-03-12 24:00 (set baseline based of initial work logging)
        Aurobinda Panda made changes -
        Remaining Estimate 0 minutes [ 0 ]
        Time Spent 1 hour, 30 minutes [ 5400 ]
        Worklog Id 294137 [ 294137 ]
        Hide
        Aurobinda Panda added a comment -

        Asked L2 to generate XML with the required dumps.

        Show
        Aurobinda Panda added a comment - Asked L2 to generate XML with the required dumps.
        Aurobinda Panda made changes -
        Assignee Aurobinda Panda [ apanda ] Mohan Singh Rathor [ mrathor ]
        Aurobinda Panda logged work - 13/Mar/26 12:00 AM
        • Time Spent:
          1 hour, 30 minutes
           

          Dumps for the related NEs used for the the routed Node checked and discussed with L2.

        Bessem Manita made changes -
        Description During testing of the RB functionality on the local platform, a sample route generated by RB is required for validation.

        We request assistance in providing a small XML sample for a RAN node that includes all the necessary data to allow route construction. The XML should contain at least the following information:

        Source RAN node

        Site information

        Physical configuration

        Core node

        Site information

        Complete physical configuration

        Additional data required to build the RAN logical interface

        Nodes related to the MW (microwave) part, including any relevant configuration required for the route generation

        The objective is to use this XML sample to simulate and verify the RB-generated route within the local testing environment.
        During testing of the RB functionality on the local platform, a sample route generated by RB is required for validation.

        We request assistance in providing a small XML sample for a RAN node that includes all the necessary data to allow route construction. The XML should contain at least the following information:

        * Source RAN node

        * Site information

        * Physical configuration

        * Core node

        * Site information

        * Physical configuration

        * Additional informaton data required to build the RAN logical interface

        * Nodes related to the MW (microwave) part, including any relevant configuration required for the route generation

        The objective is to use this XML sample to simulate and verify the RB-generated route within the local testing environment.
        Bessem Manita made changes -
        Field Original Value New Value
        Gantt Options Milestone (set to milestone: having a due date but zero effort)
        Planned Start 2026-03-12 24:00 (milestone: set planned start date to due date)
        Planned End 2026-03-12 24:00 (milestone: set planned end date to due date)

          People

          • Assignee:
            Mohan Singh Rathor
            Reporter:
            Bessem Manita
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 2 hours, 30 minutes
              2h 30m

                Drag and Drop