    • Customer:
      Ooreedo Tunisia

      Description

      Dear @Khaled Khalil,

      Kindly assign an NEP DEV resource to address the issue described below:

      1. We need to remove all existing ports from the boards listed below. However, the system is preventing removal and displaying a pop-up message indicating that these boards are currently in use within the physical configuration while these ports are no longer required.

      Snippet-1 Attached
      Snippet-2 Attached

      Huawei Boards List (All existing ports need to be removed):

      • WD2E6FAN
      • PSU
      • WD2M01PMU11A
      • WD2MUPEUe
      • WP11SCUb

      1. Snippet-1.png
        86 kB
      2. Snippet-2.png
        155 kB
      3. Snippet-3 (PSU).png
        173 kB
      4. Snippet-4 (WD2M01PMU11A).png
        164 kB
      5. Snippet-5 (WD2MUPEUe).png
        162 kB
      6. Snippet-6 (WP11SCUb)1st.png
        182 kB
      7. Snippet-6 (WP11SCUb)2nd.png
        183 kB

        Activity

        Indrasan Yadav made changes -
        Field Original Value New Value
        Gantt Options Milestone (set to milestone: having a due date but zero effort)
        Planned Start 2026-03-31 24:00 (milestone: set planned start date to due date)
        Planned End 2026-03-31 24:00 (milestone: set planned end date to due date)
        Indrasan Yadav made changes -
        Attachment Snippet-1.png [ 130813 ]
        Attachment Snippet-2.png [ 130814 ]
        Indrasan Yadav made changes -
        Description Dear @Khaled Khalil,

        Kindly assign an NEP DEV resource to address the issue described below:

        1. We need to remove all existing ports from the boards listed below. However, the system is preventing removal and displaying a pop-up message indicating that these boards are currently in use within the physical configuration while these ports are no longer required.

        Snippet-1 Attached
        Snippet-2 Attached

        Huawei Boards List (All existing ports need to be removed):

        • WD2E6FAN
        • PSU
        • WD2M01PMU11A
        • WD2MUPEUe
        • WP11SCUb
        Indrasan Yadav made changes -
        Attachment Snippet-6 (WP11SCUb)2nd.png [ 130815 ]
        Attachment Snippet-6 (WP11SCUb)1st.png [ 130816 ]
        Attachment Snippet-5 (WD2MUPEUe).png [ 130817 ]
        Attachment Snippet-4 (WD2M01PMU11A).png [ 130818 ]
        Attachment Snippet-3 (PSU).png [ 130819 ]
        Marwan Kanaan made changes -
        Component/s NEP [ 16200 ]
        Marwan Kanaan made changes -
        Assignee Khaled Khalil [ kkhalil ] Marwan Kanaan [ mkanaan ]
        Marwan Kanaan made changes -
        Status Open Bug [ 10108 ] Dev Scheduled [ 10014 ]
        Marwan Kanaan made changes -
        Status Dev Scheduled [ 10014 ] Implementation in progress [ 10016 ]
        Marwan Kanaan made changes -
        Status Implementation in progress [ 10016 ] Dev Paused [ 10017 ]
        Marwan Kanaan made changes -
        Status Dev Paused [ 10017 ] Implementation in progress [ 10016 ]
        Marwan Kanaan made changes -
        Status Implementation in progress [ 10016 ] Rejected [ 10100 ]
        Assignee Marwan Kanaan [ mkanaan ] Indrasan Yadav [ iyadav ]
        Resolution Done [ 10000 ]
        Marwan Kanaan made changes -
        Remaining Estimate 0 minutes [ 0 ]
        Time Spent 2 hours [ 7200 ]
        Worklog Id 295099 [ 295099 ]
        Marwan Kanaan made changes -
        Baseline Start 2026-03-31 24:00 (set baseline based of initial work logging)
        Baseline End 2026-03-31 24:00 (set baseline based of initial work logging)
        Marwan Kanaan made changes -
        Remaining Estimate 0 minutes [ 0 ] 1 hour [ 3600 ]
        Time Spent 2 hours [ 7200 ] 1 hour [ 3600 ]
        Worklog Id 295099 [ 295099 ]

          People

          • Assignee:
            Indrasan Yadav
            Reporter:
            Indrasan Yadav
            Rejected By:
            Marwan Kanaan
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Time Spent - 1 hour Remaining Estimate - 1 hour
              1h
              Logged:
              Time Spent - 1 hour Remaining Estimate - 1 hour
              1h

                Drag and Drop