Details
-
Type:
Bug
-
Status:
Rejected
(View Workflow)
-
Priority:
Normal
-
Resolution: Done
-
Component/s: NEP
-
Labels:
-
Customer:Ooreedo Tunisia
Description
Dear @Khaled Khalil,
Kindly assign an NEP DEV resource to address the issue described below:
1. We need to remove all existing ports from the boards listed below. However, the system is preventing removal and displaying a pop-up message indicating that these boards are currently in use within the physical configuration while these ports are no longer required.
Snippet-1 Attached
Snippet-2 Attached
Huawei Boards List (All existing ports need to be removed):
• WD2E6FAN
• PSU
• WD2M01PMU11A
• WD2MUPEUe
• WP11SCUb
Attachments
Activity
| Field | Original Value | New Value |
|---|---|---|
| Gantt Options | Milestone (set to milestone: having a due date but zero effort) | |
| Planned Start | 2026-03-31 24:00 (milestone: set planned start date to due date) | |
| Planned End | 2026-03-31 24:00 (milestone: set planned end date to due date) |
| Attachment | Snippet-1.png [ 130813 ] | |
| Attachment | Snippet-2.png [ 130814 ] |
| Description |
Dear @Khaled Khalil,
Kindly assign an NEP DEV resource to address the issue described below: 1. We need to remove all existing ports from the boards listed below. However, the system is preventing removal and displaying a pop-up message indicating that these boards are currently in use within the physical configuration while these ports are no longer required. Snippet-1 Attached Snippet-2 Attached Huawei Boards List (All existing ports need to be removed): • WD2E6FAN • PSU • WD2M01PMU11A • WD2MUPEUe • WP11SCUb |
| Attachment | Snippet-6 (WP11SCUb)2nd.png [ 130815 ] | |
| Attachment | Snippet-6 (WP11SCUb)1st.png [ 130816 ] | |
| Attachment | Snippet-5 (WD2MUPEUe).png [ 130817 ] | |
| Attachment | Snippet-4 (WD2M01PMU11A).png [ 130818 ] | |
| Attachment | Snippet-3 (PSU).png [ 130819 ] |
| Component/s | NEP [ 16200 ] |
| Assignee | Khaled Khalil [ kkhalil ] | Marwan Kanaan [ mkanaan ] |
| Status | Open Bug [ 10108 ] | Dev Scheduled [ 10014 ] |
| Status | Dev Scheduled [ 10014 ] | Implementation in progress [ 10016 ] |
| Status | Implementation in progress [ 10016 ] | Dev Paused [ 10017 ] |
| Status | Dev Paused [ 10017 ] | Implementation in progress [ 10016 ] |
| Status | Implementation in progress [ 10016 ] | Rejected [ 10100 ] |
| Assignee | Marwan Kanaan [ mkanaan ] | Indrasan Yadav [ iyadav ] |
| Resolution | Done [ 10000 ] |
| Remaining Estimate | 0 minutes [ 0 ] | |
| Time Spent | 2 hours [ 7200 ] | |
| Worklog Id | 295099 [ 295099 ] |
| Baseline Start | 2026-03-31 24:00 (set baseline based of initial work logging) | |
| Baseline End | 2026-03-31 24:00 (set baseline based of initial work logging) |
| Remaining Estimate | 0 minutes [ 0 ] | 1 hour [ 3600 ] |
| Time Spent | 2 hours [ 7200 ] | 1 hour [ 3600 ] |
| Worklog Id | 295099 [ 295099 ] |