Details

    • Customer:
      OMAN-Tel
    • Complexity:
      High
    • Severity:
      Major

      Description

      Currently there are issues in NEP route builder algorithm when encountering a tunnel path in the route path. To solve this issue the below algorithm is proposed.

      1. When encountering a routing table information withe a tunnel path the interpretation of the routing table info should be as follows.

      • To reach to the specified destination network - > go to this next hop router - > Via the tunnel specified.
      • Attached the routing table info for route of 4G node LM17130 in the router routing table.
        2. The tunnel path can be determined from the tunnel path configuration information. By going thorough each next hop step by step using the routing table information. Attached the routing table info for the tunnel configuration information on a router in the path of node LM17130.
        3. Corresponding NEP screenshots of the information's also attached.

        Activity

        Salem Dannawi logged work - 18/Aug/25 12:00 AM
        • Time Spent:
          2 hours, 30 minutes
           

          analyze the issue from XML side

        Salem Dannawi logged work - 14/Aug/25 12:00 AM
        • Time Spent:
          2 hours
           

          validate the missing IP NEs and IP data in NEP side, with the shared sheet

        Aurobinda Panda logged work - 29/Jul/25 12:00 AM
        • Time Spent:
          2 hours
           

          Data checked & shared with Internal team for Ips missing in NEP.

        Aurobinda Panda logged work - 02/Jul/25 12:00 AM
        • Time Spent:
          4 hours
           

          Internal discussion & data check in NEP.

        Aurobinda Panda logged work - 01/Jul/25 12:00 AM
        • Time Spent:
          2 hours
           

          Data checked & discussions done with Internal team.

        Aurobinda Panda logged work - 30/Jun/25 12:00 AM
        • Time Spent:
          2 hours
           

          Discussion with L3 & Phy connectivity checked.

        Aurobinda Panda logged work - 27/Jun/25 12:00 AM
        • Time Spent:
          3 hours
           

          Data check & Ip related issues & routing issues checked.

        Aurobinda Panda logged work - 25/Jun/25 12:00 AM
        • Time Spent:
          3 hours
           

          testing done & discussion with L3

        Aurobinda Panda logged work - 24/Jun/25 12:00 AM
        • Time Spent:
          1 hour
           

          Data check with L3.

        Aurobinda Panda logged work - 23/Jun/25 12:00 AM
        • Time Spent:
          4 hours
           

          Data check & discussion with team.

        Aurobinda Panda logged work - 18/Jun/25 12:00 AM
        • Time Spent:
          1 hour, 30 minutes
           

          NGN routing checked post XML import.

        Aurobinda Panda logged work - 17/Jun/25 12:00 AM
        • Time Spent:
          1 hour
           

          Routing issue checked & discussed with Team.

        Aurobinda Panda logged work - 13/Jun/25 12:00 AM - edited
        • Time Spent:
          1 hour
           

          Issue checked related to NGN Routing

        Aurobinda Panda logged work - 12/Jun/25 12:00 AM
        • Time Spent:
          1 hour
           

          NGN routing issue checked.

        Aurobinda Panda logged work - 10/Jun/25 12:00 AM
        • Time Spent:
          3 hours
           

          Tunnel issue checked & discussed with team.

        Aurobinda Panda logged work - 23/May/25 12:00 AM
        • Time Spent:
          1 hour
           

          Discussion & follow up for the issue.

        Aurobinda Panda logged work - 20/May/25 12:00 AM
        • Time Spent:
          1 hour
           

          Discussion with l2 & L3 for issue found during import.

        Aurobinda Panda logged work - 19/May/25 12:00 AM
        • Time Spent:
          1 hour
           

          Routing issue checked post XML import.

        Aurobinda Panda logged work - 16/May/25 12:00 AM
        • Time Spent:
          1 hour, 30 minutes
           

          Issue discussed & data checked.

        Aurobinda Panda logged work - 18/Apr/25 12:00 AM
        • Time Spent:
          30 minutes
           

          Data checked in Route builder report as requested by L3.

          People

          • Assignee:
            Aurobinda Panda
            Reporter:
            Eyob Tatek
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 4 days, 6 hours
              4d 6h

                Drag and Drop