Details

    • Customer:
      OMAN-Tel

      Description

      Dear @Bassem Sabbagh,

      Seeking for your kind support to assign AI Dev resource to check why below 5G nodes are coming in XML under “npsranbss” which should not come.

      Require dump is attached here and also shared on mail.

      1. 10-02-2025_RE_ 5G technology Missing in XML for Huawei in OT __ OMAN-6913 __.msg
        1.48 MB
        Indrasan Yadav
      2. AIM_BTS59005G_NM00030.xml
        28 kB
        Indrasan Yadav
      3. AIM_BTS59005G_NM01270.xml
        30 kB
        Indrasan Yadav
      4. AIM_BTS59005G_NM05820.xml
        200 kB
        Indrasan Yadav
      5. AIM_BTS59005G_NM10000.xml
        259 kB
        Indrasan Yadav
      6. AIM_BTS59005G_NM10001.xml
        458 kB
        Indrasan Yadav
      7. Report On .180 & Production.rar
        3.65 MB
        Indrasan Yadav
      8. WHY 5G NODES ARE PARSING IN XML __ OMAN-6913 __.msg
        1.15 MB
        Indrasan Yadav
      1. 5G Standalone node appearing under board.png
        84 kB
      2. 5G Standalone node appearing under cabinet.png
        47 kB
      3. 5G Standalone node appearing under shelf.png
        68 kB
      4. Now Standalone 5G Node Parsing Under SRAN With Technology.png
        47 kB
      5. Standalone 5G node is parsing in XML .png
        46 kB

        Activity

        Hide
        Indrasan Yadav added a comment -

        Hi Sandya,

        In last JIRA OMAN-6816, already raised the issue regarding 5G nodes which is coming in XML which should not come.

        Please check & fix the issue.

        Show
        Indrasan Yadav added a comment - Hi Sandya, In last JIRA OMAN-6816, already raised the issue regarding 5G nodes which is coming in XML which should not come. Please check & fix the issue.
        Hide
        Bassem Sabbagh added a comment -

        Assigned to Sandya to define the WL

        Show
        Bassem Sabbagh added a comment - Assigned to Sandya to define the WL
        Hide
        Bassem Sabbagh added a comment -

        WL = 1 mday

        Show
        Bassem Sabbagh added a comment - WL = 1 mday
        Hide
        Bassem Sabbagh added a comment -

        to be delivered on 1-8-2024

        Show
        Bassem Sabbagh added a comment - to be delivered on 1-8-2024
        Hide
        Sandya Sharma added a comment -

        commit done.

        Show
        Sandya Sharma added a comment - commit done.
        Hide
        Indrasan Yadav added a comment -

        Asked to release patch to @Hasan & @Khaleed.

        Show
        Indrasan Yadav added a comment - Asked to release patch to @Hasan & @Khaleed.
        Hide
        Indrasan Yadav added a comment -

        Patch has been released and asked to @Integration to apply on prod.

        Show
        Indrasan Yadav added a comment - Patch has been released and asked to @Integration to apply on prod.
        Hide
        Indrasan Yadav added a comment -

        As confirmed by @Integration, patch has been applied on prod.

        So, will see in next XML generation that now 5G nodes are coming or not ?

        Show
        Indrasan Yadav added a comment - As confirmed by @Integration, patch has been applied on prod. So, will see in next XML generation that now 5G nodes are coming or not ?
        Hide
        Indrasan Yadav added a comment -

        Will check in next xml import.

        Show
        Indrasan Yadav added a comment - Will check in next xml import.
        Hide
        Indrasan Yadav added a comment -

        Requested to Integration to generate XML.

        Once the Integration team provides the XML and .csv file, I will review them and proceed accordingly.

        Show
        Indrasan Yadav added a comment - Requested to Integration to generate XML. Once the Integration team provides the XML and .csv file, I will review them and proceed accordingly.
        Hide
        Indrasan Yadav added a comment -

        The XML review has been completed, and I identified that the 5G nodes are no longer appearing in the XML. Therefore, we can proceed to close this JIRA.

        Show
        Indrasan Yadav added a comment - The XML review has been completed, and I identified that the 5G nodes are no longer appearing in the XML. Therefore, we can proceed to close this JIRA.
        Hide
        Indrasan Yadav added a comment -

        The XML review has been completed, and I identified that the 5G nodes are no longer appearing in the XML. Therefore, we can proceed to close this JIRA.

        Show
        Indrasan Yadav added a comment - The XML review has been completed, and I identified that the 5G nodes are no longer appearing in the XML. Therefore, we can proceed to close this JIRA.
        Hide
        Indrasan Yadav added a comment -

        As discussed between Me, You & Aurovinda, I am opening this JIRA to revert the implemented rule as per your suggestion.

        We will now parse all standalone 5G nodes under SRAN, including related physical components, except for mentioning technology supported (5G) under the CSV of SRAN.

        Show
        Indrasan Yadav added a comment - As discussed between Me, You & Aurovinda, I am opening this JIRA to revert the implemented rule as per your suggestion. We will now parse all standalone 5G nodes under SRAN, including related physical components, except for mentioning technology supported (5G) under the CSV of SRAN.
        Hide
        Bassem Sabbagh added a comment -

        Assigned to Sandya

        Show
        Bassem Sabbagh added a comment - Assigned to Sandya
        Hide
        Bassem Sabbagh added a comment -

        dumps to be shared for validation. to be delivered by 5-2-25

        Show
        Bassem Sabbagh added a comment - dumps to be shared for validation. to be delivered by 5-2-25
        Hide
        Sandya Sharma added a comment -

        code reverted back , but need dumps to validate.

        Show
        Sandya Sharma added a comment - code reverted back , but need dumps to validate.
        Hide
        Sandya Sharma added a comment -

        hi , xml shared with you on teams kindly check and confirm.

        Show
        Sandya Sharma added a comment - hi , xml shared with you on teams kindly check and confirm.
        Hide
        Indrasan Yadav added a comment - - edited

        As discussed with @Bassem, @Aurovinda, and myself, all standalone 5G nodes are now successfully parsing under SRAN with technology 5G, including inventory data. (Require snaps is attaching here)

        Since the implementation is completed as per the agreed approach, we will close this JIRA, once codecommit done by @Sandya. (Sandya please commit code for same)

        Best regards,
        Indrasan

        Show
        Indrasan Yadav added a comment - - edited As discussed with @Bassem, @Aurovinda, and myself, all standalone 5G nodes are now successfully parsing under SRAN with technology 5G, including inventory data. (Require snaps is attaching here) Since the implementation is completed as per the agreed approach, we will close this JIRA, once codecommit done by @Sandya. (Sandya please commit code for same) Best regards, Indrasan
        Hide
        Sandya Sharma added a comment -

        commit done.

        Show
        Sandya Sharma added a comment - commit done.
        Hide
        Indrasan Yadav added a comment - - edited

        we will close this JIRA once data validation done on .180. which is in progress

        Show
        Indrasan Yadav added a comment - - edited we will close this JIRA once data validation done on .180. which is in progress
        Hide
        Indrasan Yadav added a comment -

        Imported the XML on .180 two times (1st time XML: XML File: 2025-02-06-01.36.57_OmanTel) and (2nd time XML: 2025-02-07-03.58.34_OmanTel) both time it is stuck while saving the data, server logs shared by @Integration team in attached mail with start subject line 10-02-2025........

        Show
        Indrasan Yadav added a comment - Imported the XML on .180 two times (1st time XML: XML File: 2025-02-06-01.36.57_OmanTel) and (2nd time XML: 2025-02-07-03.58.34_OmanTel) both time it is stuck while saving the data, server logs shared by @Integration team in attached mail with start subject line 10-02-2025........
        Hide
        Indrasan Yadav added a comment -

        Dear @Khaled Khalil,

        I hope you're doing well. Could you please provide an update on the matter below?

        For your reference, I initiated the same XML (2025-02-07-03.58.34_OmanTel) on .180 yesterday to check and confirm the latest status. However, the issue persists.

        Thank you for your attention to this.

        Thank you
        Indrasan

        Show
        Indrasan Yadav added a comment - Dear @Khaled Khalil, I hope you're doing well. Could you please provide an update on the matter below? For your reference, I initiated the same XML (2025-02-07-03.58.34_OmanTel) on .180 yesterday to check and confirm the latest status. However, the issue persists. Thank you for your attention to this. Thank you Indrasan
        Hide
        Indrasan Yadav added a comment -

        Now, I checked on test .180 & production platform where 5G nodes are coming under SRAN report with technology 5G and related physical data are also importing under inventory report.

        All require report is attaching here for reference.

        Show
        Indrasan Yadav added a comment - Now, I checked on test .180 & production platform where 5G nodes are coming under SRAN report with technology 5G and related physical data are also importing under inventory report. All require report is attaching here for reference.

          People

          • Assignee:
            Bassem Sabbagh
            Reporter:
            Indrasan Yadav
          • Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 day, 7 hours
              1d 7h

                Drag and Drop