Details

    • Customer:
      OMAN-Tel
    • Complexity:
      Medium
    • Severity:
      Major
    • Product:
      NEP
    • REQUESTER:
      INTERNAL

      Description

      It is found that the Logical Interfaces are not created for Ericsson BSCs in NEP. The XMl contains the details and the Error report doesn't show anything related to this.
      I have added the SS and the XML imported on 180 "Ericsson 2G BSC" version

      1. 2025-10-27-11.50.37_OmanTel.xml
        8.07 MB
        Aurobinda Panda
      1. SRAN BS report_NEP.jpg
        77 kB
      2. RAN Logical Interface missing in NEP for BSC.jpg
        42 kB
      3. RAN Logical Interface Error.jpg
        104 kB
      4. Network Import Report_NEP.jpg
        87 kB
      5. IP Data_NEP.jpg
        153 kB
      6. image (8).png
        101 kB
      7. image (7).png
        273 kB

        Activity

        Aurobinda Panda made changes -
        Field Original Value New Value
        Gantt Options Milestone (set to milestone: having a due date but zero effort)
        Planned Start 2025-10-31 24:00 (milestone: set planned start date to due date)
        Planned End 2025-10-31 24:00 (milestone: set planned end date to due date)
        Aurobinda Panda made changes -
        Link This issue blocks OMAN-7266 [ OMAN-7266 ]
        Aurobinda Panda made changes -
        Summary RAN Logical Interfaces are not created for Ericsson BSC in NEP OT | RAN Logical Interfaces are not created for Ericsson BSC in NEP
        Aurobinda Panda made changes -
        Description It is found that the Logical Interfaces are not created for Ericsson BSCs in NEP. It is found that the Logical Interfaces are not created for Ericsson BSCs in NEP. The XMl contains the details and the Error report doesn't show anything related to this.
        I have added the SS and the XML imported on 180 "Ericsson 2G BSC" version
        Aurobinda Panda made changes -
        Attachment Network Import Report_NEP.jpg [ 120804 ]
        Attachment RAN Logical Interface Error.jpg [ 120805 ]
        Attachment IP Data_NEP.jpg [ 120806 ]
        Attachment SRAN BS report_NEP.jpg [ 120807 ]
        Attachment RAN Logical Interface missing in NEP for BSC.jpg [ 120808 ]
        Khaled Khalil made changes -
        Assignee Khaled Khalil [ kkhalil ] Mustapha Al-Hage [ malhage ]
        Khaled Khalil made changes -
        Status Open Bug [ 10108 ] Dev Scheduled [ 10014 ]
        Khaled Khalil made changes -
        Status Dev Scheduled [ 10014 ] Implementation in progress [ 10016 ]
        Assignee Mustapha Al-Hage [ malhage ] Khaled Khalil [ kkhalil ]
        Khaled Khalil made changes -
        Assignee Khaled Khalil [ kkhalil ] Mustapha Al-Hage [ malhage ]
        Aurobinda Panda made changes -
        Remaining Estimate 0 minutes [ 0 ]
        Time Spent 1 hour [ 3600 ]
        Worklog Id 282191 [ 282191 ]
        Aurobinda Panda made changes -
        Baseline Start 2025-10-31 24:00 (set baseline based of initial work logging)
        Baseline End 2025-10-31 24:00 (set baseline based of initial work logging)
        Mustapha Al-Hage made changes -
        Status Implementation in progress [ 10016 ] Dev Paused [ 10017 ]
        Aurobinda Panda made changes -
        Time Spent 1 hour [ 3600 ] 1 hour, 15 minutes [ 4500 ]
        Worklog Id 282934 [ 282934 ]
        Mustapha Al-Hage made changes -
        Status Dev Paused [ 10017 ] Implementation in progress [ 10016 ]
        Mustapha Al-Hage made changes -
        Status Implementation in progress [ 10016 ] Rejected [ 10100 ]
        Assignee Mustapha Al-Hage [ malhage ] Aurobinda Panda [ apanda ]
        Resolution Incomplete [ 4 ]
        Mustapha Al-Hage made changes -
        Attachment image (8).png [ 121802 ]
        Attachment image (7).png [ 121803 ]
        Aurobinda Panda made changes -
        Time Spent 1 hour, 15 minutes [ 4500 ] 1 hour, 45 minutes [ 6300 ]
        Worklog Id 283360 [ 283360 ]

          People

          • Assignee:
            Aurobinda Panda
            Reporter:
            Aurobinda Panda
            Rejected By:
            Mustapha Al-Hage
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 hour, 45 minutes
              1h 45m

                Drag and Drop