Details

    • Customer:
      Airtel India
    • Classification:
      Query

      Description

      MW nodes with node types IP-20C, IP-20G, and IP-20GX are present in the XML but are not parsing into NEP.
      Sample node 10.64.85.20_BR, no error for this node in error report .

        Activity

        Priyasha Tiwari made changes -
        Field Original Value New Value
        Gantt Options Milestone (set to milestone: having a due date but zero effort)
        Planned Start 2025-12-19 24:00 (milestone: set planned start date to due date)
        Planned End 2025-12-19 24:00 (milestone: set planned end date to due date)
        Priyasha Tiwari logged work - 17/Dec/25 12:00 AM - edited
        • Time Spent:
          2 hours
           

          validation on prod

        Priyasha Tiwari made changes -
        Remaining Estimate 0 minutes [ 0 ]
        Time Spent 2 hours [ 7200 ]
        Worklog Id 286609 [ 286609 ]
        Priyasha Tiwari made changes -
        Baseline Start 2025-12-19 24:00 (set baseline based of initial work logging)
        Baseline End 2025-12-19 24:00 (set baseline based of initial work logging)
        Priyasha Tiwari made changes -
        Worklog Id 286609 [ 286609 ]
        Priyasha Tiwari logged work - 06/Jan/26 12:00 AM
        • Time Spent:
          4 hours
           

          bug analysis, internal call with team for understand the bug and screensharing session with customer

        Priyasha Tiwari made changes -
        Labels NEP_D
        Priyasha Tiwari made changes -
        Description MW nodes with node types IP-20C, IP-20G, and IP-20GX are present in the XML but are not parsing into NEP.
        Sample node 10.64.85.20_BR, no error for this node in error report .
        Priyasha Tiwari made changes -
        Attachment MW NODE ERROR SS.png [ 125505 ]
        Priyasha Tiwari made changes -
        Attachment MW NODE NEP IDU REPORT.png [ 125506 ]
        Attachment MW NODE XML SNAPSHOT.png [ 125507 ]
        Priyasha Tiwari made changes -
        Assignee Ankit Bhardwaj [ abhardwaj ] Khaled Khalil [ kkhalil ]
        Priyasha Tiwari made changes -
        Project Airtel_Support [ 13603 ] L3 Support [ 14300 ]
        Key ATS-10851 LS-867
        Marwan Kanaan made changes -
        Component/s NEP [ 16200 ]
        Khaled Khalil made changes -
        Assignee Khaled Khalil [ kkhalil ] Srishti Kashyap [ skashyap ]
        Srishti Kashyap logged work - 08/Jan/26 12:00 AM
        • Time Spent:
          2 hours, 30 minutes
           

          checked the problem checked the prod xml checked in the code requested for xml of sample case not parsing due mismatch of neid between networkelemnts map and fetching after regex.

        Basant Kumar logged work - 08/Jan/26 12:00 AM
        • Time Spent:
          1 hour, 30 minutes
           

          i have generated XML for OSS IP - 172.27.75.85, Nokia/CM Dump form BR circle on .37 test server and shared on mail .

        Priyasha Tiwari logged work - 08/Jan/26 12:00 AM
        • Time Spent:
          4 hours
           

          WORKING TO PROVIDE A SMALL XML TO L3 ,CORDINATING WITH L2 TOOK MUCH TIME

        Priyasha Tiwari made changes -
        Time Spent 2 hours [ 7200 ] 6 hours [ 21600 ]
        Worklog Id 288415 [ 288415 ]
        Hide
        Priyasha Tiwari added a comment -

        requested L2 to share the XML with l3 team

        Show
        Priyasha Tiwari added a comment - requested L2 to share the XML with l3 team
        Srishti Kashyap logged work - 09/Jan/26 12:00 AM
        • Time Spent:
          1 hour
           

          downloaded xml put logs imported xml no issue found, xml doesnt contain sample case which issue persist informed telco rerequested xml file.

        Priyasha Tiwari logged work - 09/Jan/26 12:00 AM
        • Time Spent:
          2 hours
           

          CORDINATING WITH BASANT FOR XML

        Srishti Kashyap made changes -
        Time Spent 6 hours [ 21600 ] 1 day, 30 minutes [ 30600 ]
        Worklog Id 288529 [ 288529 ]
        Srishti Kashyap made changes -
        Time Spent 1 day, 30 minutes [ 30600 ] 1 day, 1 hour, 30 minutes [ 34200 ]
        Worklog Id 288533 [ 288533 ]
        Hide
        Srishti Kashyap added a comment -

        received sample xml doesnt have sample node consist RJ node. Please reshare correct one

        Show
        Srishti Kashyap added a comment - received sample xml doesnt have sample node consist RJ node. Please reshare correct one
        Srishti Kashyap made changes -
        Status Open Bug [ 10108 ] Dev Scheduled [ 10014 ]
        Due Date 19/Dec/25 12/Jan/26
        Planned Start 19/Dec/25 12:00 AM 08/Jan/26 12:00 AM
        Planned End 19/Dec/25 12:00 AM 09/Jan/26 12:00 AM
        Srishti Kashyap made changes -
        Planned End 2026-01-09 24:00 2026-01-12 24:00 (auto-generated by shift of due date)
        Priyasha Tiwari logged work - 12/Jan/26 12:00 AM
        • Time Spent:
          2 hours
           

          CALL WITH L3, CUSTOMER AND BUG ANALYSIS .

        Srishti Kashyap logged work - 12/Jan/26 12:00 AM
        • Time Spent:
          7 hours
           

          checked the code got sample xml by putting logs found the code is in error alarms of xml related to ai part, imported the xml..found error..catalogue missing for sample node..creating the catalogue wrt to PROD

        Basant Kumar made changes -
        Time Spent 1 day, 1 hour, 30 minutes [ 34200 ] 1 day, 3 hours [ 39600 ]
        Worklog Id 288624 [ 288624 ]
        Srishti Kashyap logged work - 13/Jan/26 12:00 AM
        • Time Spent:
          7 hours, 30 minutes
           

          imported xml again in clean version xml imported correctly nodes reflecting in idu checking for error in error report no error found requesting db permission again checking in error report in db no error found for sample not in idu..discussed with marwan checked in db idu is availabale for version but in autocreation category..discussed same with telco to provide info which idu need to be removed from autocreated..discussed the autocreationscenerio with bessem nodes by xml import by importer are not considered as autocreated ..asked telecom if any process is done for autocreation or static sheet imported.

        Hide
        Srishti Kashyap added a comment -

        Dear Priyasha,
        Upon investigation, it was found that the IDUs are being imported into NEP and are reflecting in the Autocreated IDU Report. Please find the attached screenshot for sample node reference.
        As discussed, kindly provide the list of IDUs along with their model types from the Autocreated IDU Report that are expected to reflect in the IDU Report.

        Show
        Srishti Kashyap added a comment - Dear Priyasha, Upon investigation, it was found that the IDUs are being imported into NEP and are reflecting in the Autocreated IDU Report. Please find the attached screenshot for sample node reference. As discussed, kindly provide the list of IDUs along with their model types from the Autocreated IDU Report that are expected to reflect in the IDU Report.
        Srishti Kashyap made changes -
        Attachment Screenshot 2026-01-13 174901.png [ 126011 ]
        Srishti Kashyap logged work - 14/Jan/26 12:00 AM
        • Time Spent:
          2 hours, 30 minutes
           

          checked the reports and db discussion with marwan script made shared to integration

        Priyasha Tiwari made changes -
        Time Spent 1 day, 3 hours [ 39600 ] 1 day, 5 hours [ 46800 ]
        Worklog Id 288838 [ 288838 ]
        Priyasha Tiwari made changes -
        Time Spent 1 day, 5 hours [ 46800 ] 2 days, 1 hour [ 61200 ]
        Worklog Id 288841 [ 288841 ]
        Priyasha Tiwari made changes -
        Time Spent 2 days, 1 hour [ 61200 ] 2 days, 3 hours [ 68400 ]
        Worklog Id 288842 [ 288842 ]
        Srishti Kashyap logged work - 15/Jan/26 12:00 AM
        • Time Spent:
          30 minutes
           

          reissue thequery for mw-models to shift into autocreated

        Basant Kumar logged work - 15/Jan/26 12:00 AM
        • Time Spent:
          2 hours
           

          i have executed the deletion script on BR circle and that i have restated the server .

        made changes -
        Srishti Kashyap made changes -
        Status Dev Scheduled [ 10014 ] Implementation in progress [ 10016 ]
        Srishti Kashyap made changes -
        Status Implementation in progress [ 10016 ] To Be Released [ 10400 ]
        Dev Verification Done Static Analysis,Unit Testing,Code Review [ 10700, 10701, 10702 ]
        Classification Query [ 13700 ]
        Srishti Kashyap made changes -
        Time Spent 2 days, 3 hours [ 68400 ] 2 days, 5 hours, 30 minutes [ 77400 ]
        Worklog Id 288916 [ 288916 ]
        Srishti Kashyap made changes -
        Time Spent 2 days, 5 hours, 30 minutes [ 77400 ] 3 days, 4 hours, 30 minutes [ 102600 ]
        Worklog Id 288920 [ 288920 ]
        Srishti Kashyap made changes -
        Time Spent 3 days, 4 hours, 30 minutes [ 102600 ] 4 days, 4 hours [ 129600 ]
        Worklog Id 288922 [ 288922 ]
        Khaled Khalil made changes -
        Status To Be Released [ 10400 ] Ready for QA [ 10023 ]
        Assignee Srishti Kashyap [ skashyap ] Priyasha Tiwari [ ptiwari ]
        Priyasha Tiwari logged work - 19/Jan/26 12:00 AM
        • Time Spent:
          2 hours
           

          testing and validation the static sheet for this bug, and call with L3 team

        Srishti Kashyap made changes -
        Time Spent 4 days, 4 hours [ 129600 ] 4 days, 4 hours, 30 minutes [ 131400 ]
        Worklog Id 289103 [ 289103 ]
        Basant Kumar made changes -
        Time Spent 4 days, 4 hours, 30 minutes [ 131400 ] 4 days, 6 hours, 30 minutes [ 138600 ]
        Worklog Id 289111 [ 289111 ]
        Priyasha Tiwari made changes -
        Time Spent 4 days, 6 hours, 30 minutes [ 138600 ] 1 week, 30 minutes [ 145800 ]
        Worklog Id 289389 [ 289389 ]
        Srishti Kashyap logged work - 22/Jan/26 12:00 AM
        • Time Spent:
          3 hours, 30 minutes
           

          checking issue configuration report db

        Priyasha Tiwari logged work - 22/Jan/26 12:00 AM
        • Time Spent:
          3 hours
           

          static sheet analysis and import after patch applied and validation

        Basant Kumar logged work - 23/Jan/26 12:00 AM
        • Time Spent:
          1 hour, 30 minutes
           

          i have copied BR dumps to .177 then generated xml and shared on mail .

        Srishti Kashyap made changes -
        Time Spent 1 week, 30 minutes [ 145800 ] 1 week, 4 hours [ 158400 ]
        Worklog Id 289511 [ 289511 ]
        Srishti Kashyap logged work - 27/Jan/26 12:00 AM - edited
        • Time Spent:
          5 hours
           

          checked the sample cases again for releated configuration and links and in code for autocreation atrribute adding logs finally and releasing it to track

        Hide
        Srishti Kashyap added a comment -

        build 3.7.71.553 is released with added logs to track autocreation of nodes

        Show
        Srishti Kashyap added a comment - build 3.7.71.553 is released with added logs to track autocreation of nodes
        Priyasha Tiwari made changes -
        Time Spent 1 week, 4 hours [ 158400 ] 1 week, 7 hours [ 169200 ]
        Worklog Id 289827 [ 289827 ]
        Hide
        Srishti Kashyap added a comment -

        Please share the logs of 28-01-2026 from BR circle.

        Show
        Srishti Kashyap added a comment - Please share the logs of 28-01-2026 from BR circle.
        Srishti Kashyap made changes -
        Time Spent 1 week, 7 hours [ 169200 ] 1 week, 1 day, 4 hours [ 187200 ]
        Worklog Id 290329 [ 290329 ]
        Srishti Kashyap made changes -
        Worklog Id 290329 [ 290329 ]
        Srishti Kashyap logged work - 02/Feb/26 12:00 AM
        • Time Spent:
          6 hours, 30 minutes
           

          requested the logs..checked logs..checked code..checked data on prod platform..xml too large bot opnening in application requested xml from integration checked xml slots boards missing need to discuss with priyasha and bessem

        Basant Kumar logged work - 02/Feb/26 12:00 AM
        • Time Spent:
          1 hour
           

          i have shared server log from BR circle

        Basant Kumar logged work - 02/Feb/26 12:00 AM
        • Time Spent:
          1 hour
           

          i have shared xml from bihar circle with dev team.

        Basant Kumar made changes -
        Time Spent 1 week, 1 day, 4 hours [ 187200 ] 1 week, 1 day, 5 hours, 30 minutes [ 192600 ]
        Worklog Id 290412 [ 290412 ]
        Srishti Kashyap logged work - 03/Feb/26 12:00 AM
        • Time Spent:
          2 hours, 30 minutes
           

          discussed with bessem the findingdings..explained same to priyasha the nodes going in autocreation because they dont have slots and boards in xml hence code using defaulttemplate during physical configuration and assigning idu nodes as auto created..mailed and updated on jira

        Hide
        added a comment -

        Hi Dear,
        As observed, the IDU nodes are being configured as auto-created because, during the import process, the slot and board details are missing in the XML. As per the current implementation, when this information is absent, the system applies the default physical configuration, due to which the IDU node is marked as auto-created.
        This behaviour was verified for the sample case BHSOZ01-1, which was imported on 28-01-2026. The corresponding XML used for this import is dated 27-01-2026.
        Please let us know if further clarification is required.

        Show
        added a comment - Hi Dear, As observed, the IDU nodes are being configured as auto-created because, during the import process, the slot and board details are missing in the XML. As per the current implementation, when this information is absent, the system applies the default physical configuration, due to which the IDU node is marked as auto-created. This behaviour was verified for the sample case BHSOZ01-1, which was imported on 28-01-2026. The corresponding XML used for this import is dated 27-01-2026. Please let us know if further clarification is required.
        Srishti Kashyap made changes -
        Time Spent 1 week, 1 day, 5 hours, 30 minutes [ 192600 ] 1 week, 2 days, 4 hours [ 216000 ]
        Worklog Id 290509 [ 290509 ]
        Hide
        Priyasha Tiwari added a comment -

        checking the input shared by L3 team, will update asap

        Show
        Priyasha Tiwari added a comment - checking the input shared by L3 team, will update asap
        Basant Kumar made changes -
        Time Spent 1 week, 2 days, 4 hours [ 216000 ] 1 week, 2 days, 5 hours [ 219600 ]
        Worklog Id 290726 [ 290726 ]
        Basant Kumar made changes -
        Time Spent 1 week, 2 days, 5 hours [ 219600 ] 1 week, 2 days, 6 hours [ 223200 ]
        Worklog Id 290728 [ 290728 ]
        Srishti Kashyap made changes -
        Time Spent 1 week, 2 days, 6 hours [ 223200 ] 1 week, 3 days, 30 minutes [ 232200 ]
        Worklog Id 290740 [ 290740 ]
        Priyasha Tiwari made changes -
        Status Ready for QA [ 10023 ] QA In Progress [ 10015 ]
        Priyasha Tiwari made changes -
        Comment [ undertesting ]
        Hide
        Priyasha Tiwari added a comment - - edited

        snapshot of sample node attached where its shows that the node was present in slot and board xml still was imported to auto created report please check and share the input.. also let us know how can these ceragon node can be removed from the auto created report , we have already executed the script multiple times. 10.48.171.45_BR sample node

        Show
        Priyasha Tiwari added a comment - - edited snapshot of sample node attached where its shows that the node was present in slot and board xml still was imported to auto created report please check and share the input.. also let us know how can these ceragon node can be removed from the auto created report , we have already executed the script multiple times. 10.48.171.45_BR sample node
        Priyasha Tiwari made changes -
        Status QA In Progress [ 10015 ] Reopened [ 4 ]
        Assignee Priyasha Tiwari [ ptiwari ] Khaled Khalil [ kkhalil ]
        Resolution Not Fixed [ 10200 ]
        Attachment LS-867 REPORT.png [ 127800 ]
        Priyasha Tiwari made changes -
        Attachment XML SS LS-867.png [ 127801 ]
        Hide
        Priyasha Tiwari added a comment -

        ALSO DO SHARE THE SCRIPT DETAILS HERE IN JIRA FOR FUTURE REFERNECE .

        Show
        Priyasha Tiwari added a comment - ALSO DO SHARE THE SCRIPT DETAILS HERE IN JIRA FOR FUTURE REFERNECE .
        Priyasha Tiwari made changes -
        Assignee Khaled Khalil [ kkhalil ] Srishti Kashyap [ skashyap ]
        Hide
        Priyasha Tiwari added a comment -

        CLOSED

        Show
        Priyasha Tiwari added a comment - CLOSED
        Priyasha Tiwari made changes -
        Status Reopened [ 4 ] Closed [ 6 ]
        Resolution Not Fixed [ 10200 ] Fixed [ 1 ]
        Priyasha Tiwari logged work - 02/Mar/26 12:00 AM
        • Time Spent:
          2 hours
           

          validation on prod and call with L3 and L2 for script

        Basant Kumar logged work - 03/Mar/26 12:00 AM
        • Time Spent:
          2 hours
           

          i have executed deletion script on BR circle then restart the services

        Basant Kumar made changes -
        Time Spent 1 week, 3 days, 30 minutes [ 232200 ] 1 week, 3 days, 2 hours, 30 minutes [ 239400 ]
        Worklog Id 293250 [ 293250 ]
        Priyasha Tiwari made changes -
        Time Spent 1 week, 3 days, 2 hours, 30 minutes [ 239400 ] 1 week, 3 days, 4 hours, 30 minutes [ 246600 ]
        Worklog Id 293733 [ 293733 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Open Bug Open Bug Dev Scheduled Dev Scheduled
        24d 5h 23m 1 Srishti Kashyap 09/Jan/26 9:55 AM
        Dev Scheduled Dev Scheduled Implementation in progress Implementation in progress
        5d 22h 4m 1 Srishti Kashyap 15/Jan/26 7:59 AM
        Implementation in progress Implementation in progress To Be Released To Be Released
        30s 1 Srishti Kashyap 15/Jan/26 8:00 AM
        To Be Released To Be Released Ready for QA Ready for QA
        5h 27m 1 Khaled Khalil 15/Jan/26 1:27 PM
        Ready for QA Ready for QA QA In Progress QA In Progress
        21d 21h 44m 1 Priyasha Tiwari 06/Feb/26 11:12 AM
        QA In Progress QA In Progress Reopened Reopened
        2d 19h 7m 1 Priyasha Tiwari 09/Feb/26 6:19 AM
        Reopened Reopened Closed Closed
        18d 2h 9m 1 Priyasha Tiwari 27/Feb/26 8:28 AM
        Subversion JIRA

        Links Hierarchy

         Documentation

        Invalid license: EXPIRED

          People

          • Assignee:
            Srishti Kashyap
            Reporter:
            Priyasha Tiwari
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 week, 3 days, 4 hours, 30 minutes
              1w 3d 4h 30m