Details

    • Customer:
      Ooreedo Tunisia

      Description

      This JIRA is for reference to validation of data in NEP. which is coming as per XML or not?

        Activity

        Hide
        Indrasan Yadav added a comment -

        Yesterday, imported an Huawei Sample XML for one node of node type eNodeB (2025-06-04-11.48.54_Ooredoo_Tunisia) on test server .102 to validate the data in NEP.

        but there was an error which raised in JIRA (LS-425).

        Show
        Indrasan Yadav added a comment - Yesterday, imported an Huawei Sample XML for one node of node type eNodeB (2025-06-04-11.48.54_Ooredoo_Tunisia) on test server .102 to validate the data in NEP. but there was an error which raised in JIRA ( LS-425 ).
        Hide
        Bassem Sabbagh added a comment -

        NEP Data validation to be completed today

        Show
        Bassem Sabbagh added a comment - NEP Data validation to be completed today
        Hide
        Bassem Sabbagh added a comment -

        to be finalized on 13-6

        Show
        Bassem Sabbagh added a comment - to be finalized on 13-6
        Hide
        Indrasan Yadav added a comment -

        NEP data validation completed for sample XML (Final result will be conclude once full dump received and all require static sheet will be available) and below JIRA created to NEP DEV team:

        1- LS-438
        2- LS-439

        Show
        Indrasan Yadav added a comment - NEP data validation completed for sample XML (Final result will be conclude once full dump received and all require static sheet will be available) and below JIRA created to NEP DEV team: 1- LS-438 2- LS-439
        Hide
        Bassem Sabbagh added a comment -

        Data Validation is completed based on Dump sample (only above 2 tickets to be considered)

        Show
        Bassem Sabbagh added a comment - Data Validation is completed based on Dump sample (only above 2 tickets to be considered)
        Hide
        Indrasan Yadav added a comment -

        Validated the data in NEP based on full xml for all physical & few logical nodes. and again validated after reimport the xml after fixing the issues regarding catalogues.

        Show
        Indrasan Yadav added a comment - Validated the data in NEP based on full xml for all physical & few logical nodes. and again validated after reimport the xml after fixing the issues regarding catalogues.
        Hide
        Indrasan Yadav added a comment -

        All data has now been validated based on the current dump, and this JIRA is being closed. If any new requirements arise, the data will be validated under the corresponding JIRA.

        Show
        Indrasan Yadav added a comment - All data has now been validated based on the current dump, and this JIRA is being closed. If any new requirements arise, the data will be validated under the corresponding JIRA.

          People

          • Assignee:
            Indrasan Yadav
            Reporter:
            Indrasan Yadav
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Actual End:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 3 days, 3 hours, 30 minutes
              3d 3h 30m