Details

    • Customer:
      Ooreedo Tunisia

      Description

      Need to analyse the one sample dump of eNodeB (Physical & Logical) which is shared by Ooredoo Tunisia.

      Sample dump received on:

      20-03-2025: No need to analyse as dump structure is different.
      15-04-2025: To be analyse as dump structure is same as existing Huawei connector.

        Activity

        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Opened Opened In Progress In Progress
        6h 20m 2 Indrasan Yadav 05/May/25 6:02 AM
        In Progress In Progress Resolved Resolved
        2m 33s 1 Bassem Sabbagh 05/May/25 6:04 AM
        Reopened Reopened Closed Closed
        20h 23m 1 Bassem Sabbagh 06/May/25 6:10 AM
        Closed Closed Reopened Reopened
        8d 3h 39m 2 Bassem Sabbagh 14/May/25 6:08 AM
        Reopened Reopened In Progress In Progress
        64d 5h 40m 1 Indrasan Yadav 17/Jul/25 11:48 AM
        In Progress In Progress Opened Opened
        172d 18h 15m 2 Indrasan Yadav 31/Dec/25 10:34 AM
        Opened Opened Resolved Resolved
        14s 1 Indrasan Yadav 31/Dec/25 10:34 AM
        Resolved Resolved Closed Closed
        50s 2 Indrasan Yadav 31/Dec/25 10:34 AM

          People

          • Assignee:
            Indrasan Yadav
            Reporter:
            Indrasan Yadav
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Actual End:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 4 days, 4 hours
              4d 4h