Details

    • Customer:
      Ooreedo Tunisia

      Description

      Dear @Jharna Thakur,

      As I requested to @Basant Kumar yesterday to generate the XML for Huawei RAN and upload the CSV output on staging DB (IMPORTERID='20251015115622_2025-10-15-11.56.22'), after upload done I checked the data on staging DB.

      Could you please review the following points identified during data validation in the staging database for Huawei RAN:

      1. Counts Verified (OK):

      The data count is correct for the following tables:
      Cabinet, Shelf, Slot, BSC, eNodeB, SRAN, RNC, Site, Role2G, Role3G.

      2. Counts Not OK (Incomplete Data Uploaded):

      The data count is incomplete for the following tables:
      Boards, Error Alarms, Network Elements Dump, AddInfos.

      3. No Data Uploaded:

      The following tables currently have no data uploaded:
      eNodeB Bandwidths, GSM Cell MAIO, IP Data, Loopback Interface, 4G Cell, Net Status, 2G Cell, 3G Cell, TRX, Radio Antenna, Sub Interfaces, 3G Carrier, TRX ARFCN, Virtual Interfaces, Cell Radio Bandwidths, Cell Tracking Area.

      4. Extra Data Observed:

      Extra/unexpected data is appearing in the following table:
      Node Interfaces.

      5. Importer Connector:

      The importer connector is still not appearing as per given in FRS as mentioned in OT-83. You may coordinate with @Sandya Sharma to resolve this issue.

      6. Remaining Validation Points:

      The remaining common points for confirmation have already been raised under OT-84 (being handled by Sandya).

      Thank you,
      Indrasan

        Activity

        Indrasan Yadav made changes -
        Field Original Value New Value
        Gantt Options Milestone (set to milestone: having a due date but zero effort)
        Planned Start 2025-11-30 24:00 (milestone: set planned start date to due date)
        Planned End 2025-11-30 24:00 (milestone: set planned end date to due date)
        Indrasan Yadav made changes -
        Assignee Indrasan Yadav [ iyadav ]
        Indrasan Yadav logged work - 15/Oct/25 12:00 AM
        • Time Spent:
          4 hours
           

          (Requested to Basant to generate the Huawei RAN XML on server & upload the CSV output on staging-DB).
          Then started the data validated on staging DB for the same.

        Indrasan Yadav made changes -
        Remaining Estimate 0 minutes [ 0 ]
        Time Spent 4 hours [ 14400 ]
        Worklog Id 280483 [ 280483 ]
        Indrasan Yadav made changes -
        Baseline Start 2025-11-30 24:00 (set baseline based of initial work logging)
        Baseline End 2025-11-30 24:00 (set baseline based of initial work logging)
        Indrasan Yadav logged work - 16/Oct/25 12:00 AM
        • Time Spent:
          4 hours
           

          Validate the data on staging -DB for Huawei RAN & shared feedback to @Jharna.

        Indrasan Yadav made changes -
        Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
        Indrasan Yadav made changes -
        Description Dear @Jharna Thakur,

        As I requested to @Basant Kumar yesterday to generate the XML for Huawei RAN and upload the CSV output on staging DB (IMPORTERID='20251015115622_2025-10-15-11.56.22'), after upload done I checked the data on staging DB.

        Could you please review the following points identified during data validation in the staging database for Huawei RAN:

        1. Counts Verified (OK):

        The data count is correct for the following tables:
        Cabinet, Shelf, Slot, BSC, eNodeB, SRAN, RNC, Site, Role2G, Role3G.

        2. Counts Not OK (Incomplete Data Uploaded):

        The data count is incomplete for the following tables:
        Boards, Error Alarms, Network Elements Dump, AddInfos.

        3. No Data Uploaded:

        The following tables currently have no data uploaded:
        eNodeB Bandwidths, GSM Cell MAIO, IP Data, Loopback Interface, 4G Cell, Net Status, 2G Cell, 3G Cell, TRX, Radio Antenna, Sub Interfaces, 3G Carrier, TRX ARFCN, Virtual Interfaces, Cell Radio Bandwidths, Cell Tracking Area.

        4. Extra Data Observed:

        Extra/unexpected data is appearing in the following table:
        Node Interfaces.

        5. Importer Connector:

        The importer connector is still not appearing as per given in FRS as mentioned in OT-83. You may coordinate with @Sandya Sharma to resolve this issue.

        6. Remaining Validation Points:

        The remaining common points for confirmation have already been raised under OT-84 (being handled by Sandya).



        Thank you,
        Indrasan

        Indrasan Yadav made changes -
        Time Spent 4 hours [ 14400 ] 1 day [ 28800 ]
        Worklog Id 280672 [ 280672 ]
        Jharna Thakur logged work - 17/Oct/25 12:00 AM
        • Time Spent:
          3 hours, 30 minutes
           

          checking the Csvs count in my local and in local db as well. there were alot of data thus uploading it in db was taking time

        Hide
        Bassem Sabbagh added a comment -

        Integration has to generate anew xml and validate the data in SD ... no work from AI dev so far

        Show
        Bassem Sabbagh added a comment - Integration has to generate anew xml and validate the data in SD ... no work from AI dev so far
        Indrasan Yadav logged work - 22/Oct/25 12:00 AM
        • Time Spent:
          1 hour, 30 minutes
           

          As per received email from Basant that updated csv output is uploaded on staging-DB but there are 2 Importer ID on date of 21-10 so I checked with Integration and they confirmed me I need to consider latest one, but again he suggested me to wait for upload the latest one of today date so discussed with integration that still updated csv output is generated & uploaded or not? and taken the followed up.

        Basant Kumar logged work - 22/Oct/25 12:00 AM
        • Time Spent:
          1 hour
           

          I have regenerated the Huawei RAN XML and uploaded the corresponding CSV into the database. Upon checking, I noticed that data in some tables is not reflecting correctly. Please find below the table names along with the row counts from CSV and SD for your reference.

        Indrasan Yadav made changes -
        Time Spent 1 day [ 28800 ] 1 day, 1 hour, 30 minutes [ 34200 ]
        Worklog Id 281145 [ 281145 ]
        Basant Kumar made changes -
        Time Spent 1 day, 1 hour, 30 minutes [ 34200 ] 1 day, 2 hours, 30 minutes [ 37800 ]
        Worklog Id 281161 [ 281161 ]
        Indrasan Yadav logged work - 24/Oct/25 12:00 AM
        • Time Spent:
          1 hour
           

          Take the count on staging-DB for Huawei RAN as latest CSV Output uploaded by @Basant.
          _________________________________________
          Dear @Jharna Thakur,

          As discussed during the call with @Bassem Sabbagh, please review the count details in the attached sheet. It clearly shows that the data appearing in the CSV output matches the data uploaded to the staging database.

          However, the issue is that the complete data is not being parsed into the CSV output generated by @Basant Kumar on the server. There is a count mismatch between the CSV file generated on the server and the one shared by you. (Further details are available in the first email of this thread.)

          Thank you
          Indrasan

        Basant Kumar logged work - 24/Oct/25 12:00 AM
        • Time Spent:
          1 hour
           

          shared huweai ran, site,static dumps from Ooredeoo requested by jharna .

        Jharna Thakur logged work - 24/Oct/25 12:00 AM
        • Time Spent:
          1 hour
           

          generating csv output in local and checking if the count is correct in each csv

        Indrasan Yadav made changes -
        Time Spent 1 day, 2 hours, 30 minutes [ 37800 ] 1 day, 3 hours, 30 minutes [ 41400 ]
        Worklog Id 281428 [ 281428 ]
        Basant Kumar made changes -
        Time Spent 1 day, 3 hours, 30 minutes [ 41400 ] 1 day, 4 hours, 30 minutes [ 45000 ]
        Worklog Id 281520 [ 281520 ]
        Sanju Yadav logged work - 27/Oct/25 12:00 AM
        • Time Spent:
          10 minutes
           

          Shared Ooredoo-propertiesFile.properties from the server with the AI team for validation.

        Sanju Yadav logged work - 27/Oct/25 12:00 AM
        • Time Spent:
          2 hours
           

          Update Ooredoo properties file, generate CSV, and save data in SD

        Basant Kumar logged work - 27/Oct/25 12:00 AM - edited
        • Time Spent:
          2 hours
           

          discussed with sanju sir via team call for Huawei RAN_Data Validation_Staging DB after that we generated huweai ran xml and check csv count on server and DB .

        Jharna Thakur logged work - 27/Oct/25 12:00 AM
        • Time Spent:
          3 hours
           

          checking the dumps shared as well as property file also generating the csv output and checking the count for each csv

        Jharna Thakur made changes -
        Time Spent 1 day, 4 hours, 30 minutes [ 45000 ] 1 day, 5 hours, 30 minutes [ 48600 ]
        Worklog Id 281614 [ 281614 ]
        Sanju Yadav made changes -
        Time Spent 1 day, 5 hours, 30 minutes [ 48600 ] 1 day, 5 hours, 40 minutes [ 49200 ]
        Worklog Id 281621 [ 281621 ]
        Hide
        Bassem Sabbagh added a comment - - edited

        there is one property missing in the conf file and shared by Jharna ... integration to add the missing property and regenerate the XML and upload the CSVs

        Show
        Bassem Sabbagh added a comment - - edited there is one property missing in the conf file and shared by Jharna ... integration to add the missing property and regenerate the XML and upload the CSVs
        Bassem Sabbagh made changes -
        Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
        Sanju Yadav made changes -
        Time Spent 1 day, 5 hours, 40 minutes [ 49200 ] 1 day, 7 hours, 40 minutes [ 56400 ]
        Worklog Id 281651 [ 281651 ]
        Indrasan Yadav logged work - 28/Oct/25 12:00 AM - edited
        • Time Spent:
          4 hours, 30 minutes
           

          Take the only count of table data on staging-DB after CSV uploaded by integration and shared feedback to Jharna. including checked that previous raised has been fixed or not?
          ___________________________________________

          Prepare the querry on staging DB to show the count

        Basant Kumar made changes -
        Time Spent 1 day, 7 hours, 40 minutes [ 56400 ] 2 days, 1 hour, 40 minutes [ 63600 ]
        Worklog Id 281805 [ 281805 ]
        Basant Kumar made changes -
        Worklog Id 281805 [ 281805 ]
        Indrasan Yadav made changes -
        Time Spent 2 days, 1 hour, 40 minutes [ 63600 ] 2 days, 4 hours, 10 minutes [ 72600 ]
        Worklog Id 281898 [ 281898 ]
        Hide
        Indrasan Yadav added a comment -

        Dear @Jharna Thakur,

        Please the count validation comments on the staging DB related to the initial issues.

        Importer ID: 20251027105108_2025-10-27-10.51.08

        Note: Detailed validation feedback for each table will be shared once the review is completed.

        1. Counts Verified (OK):

        The data count is correct for the following tables:

        Except highlighted one remains are fixed.

        Cabinet, Shelf, Slot, BSC, eNodeB, SRAN (NOK-No data updated), RNC (NOK-No data updated), Site, Role2G, Role3G.

        2. Counts Not OK (Incomplete Data Uploaded):

        The data count is incomplete for the following tables:

        Except highlighted one remains are fixed.

        Boards (NOK-count seems higher), Error Alarms (NOK-No data updated), Network Elements Dump, AddInfos.

        3. No Data Uploaded:

        Except highlighted one remains are fixed.

        The following tables currently have no data uploaded:
        eNodeB Bandwidths, GSM Cell MAIO, IP Data (NOK-No data updated), Loopback Interface (NOK-No data updated), 4G Cell, Net Status (NOK-No data updated), 2G Cell, 3G Cell, TRX, Radio Antenna, Sub Interfaces, 3G Carrier, TRX ARFCN, Virtual Interfaces, Cell Radio Bandwidths, Cell Tracking Area.

        4. Extra Data Observed:

        Extra/unexpected data is appearing in the following table:
        Node Interfaces (OK).

        5. Importer Connector: (As discussed @Jharna Thakur, It will be taking care by @Sandya Sharma)

        Thank you
        Indrasan

        Show
        Indrasan Yadav added a comment - Dear @Jharna Thakur, Please the count validation comments on the staging DB related to the initial issues. Importer ID: 20251027105108_2025-10-27-10.51.08 Note: Detailed validation feedback for each table will be shared once the review is completed. 1. Counts Verified (OK): The data count is correct for the following tables: Except highlighted one remains are fixed. Cabinet, Shelf, Slot, BSC, eNodeB, SRAN (NOK-No data updated), RNC (NOK-No data updated), Site, Role2G, Role3G. 2. Counts Not OK (Incomplete Data Uploaded): The data count is incomplete for the following tables: Except highlighted one remains are fixed. Boards (NOK-count seems higher), Error Alarms (NOK-No data updated), Network Elements Dump, AddInfos. 3. No Data Uploaded: Except highlighted one remains are fixed. The following tables currently have no data uploaded: eNodeB Bandwidths, GSM Cell MAIO, IP Data (NOK-No data updated), Loopback Interface (NOK-No data updated), 4G Cell, Net Status (NOK-No data updated), 2G Cell, 3G Cell, TRX, Radio Antenna, Sub Interfaces, 3G Carrier, TRX ARFCN, Virtual Interfaces, Cell Radio Bandwidths, Cell Tracking Area. 4. Extra Data Observed: Extra/unexpected data is appearing in the following table: Node Interfaces (OK). 5. Importer Connector: (As discussed @Jharna Thakur, It will be taking care by @Sandya Sharma) Thank you Indrasan
        Indrasan Yadav made changes -
        Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
        Jharna Thakur made changes -
        Time Spent 2 days, 4 hours, 10 minutes [ 72600 ] 2 days, 7 hours, 10 minutes [ 83400 ]
        Worklog Id 281909 [ 281909 ]
        Indrasan Yadav made changes -
        Worklog Id 281898 [ 281898 ]
        Indrasan Yadav made changes -
        Time Spent 2 days, 7 hours, 10 minutes [ 83400 ] 3 days, 10 minutes [ 87000 ]
        Worklog Id 281898 [ 281898 ]
        Indrasan Yadav made changes -
        Worklog Id 281898 [ 281898 ]
        Indrasan Yadav made changes -
        Time Spent 3 days, 10 minutes [ 87000 ] 3 days, 1 hour, 10 minutes [ 90600 ]
        Worklog Id 281898 [ 281898 ]
        Indrasan Yadav logged work - 29/Oct/25 12:00 AM
        • Time Spent:
          1 hour, 30 minutes
           

          Update the quarry & add the quarry to show the count. and update the sheet of attribute count and share to @Bassem.

        Jharna Thakur logged work - 29/Oct/25 12:00 AM
        • Time Spent:
          2 hours
           

          generating the csv output and loading it in local database and checking the count of each csv in db

        Indrasan Yadav made changes -
        Time Spent 3 days, 1 hour, 10 minutes [ 90600 ] 3 days, 2 hours, 40 minutes [ 96000 ]
        Worklog Id 282022 [ 282022 ]
        Jharna Thakur made changes -
        Time Spent 3 days, 2 hours, 40 minutes [ 96000 ] 3 days, 4 hours, 40 minutes [ 103200 ]
        Worklog Id 282119 [ 282119 ]
        Jharna Thakur made changes -
        Time Spent 3 days, 4 hours, 40 minutes [ 103200 ] 4 days, 10 minutes [ 115800 ]
        Worklog Id 282437 [ 282437 ]
        Basant Kumar logged work - 04/Nov/25 12:00 AM
        • Time Spent:
          1 hour
           

          i have uploaded Huawei RAN_Data Validation_Staging DB.

        Basant Kumar made changes -
        Time Spent 4 days, 10 minutes [ 115800 ] 4 days, 1 hour, 10 minutes [ 119400 ]
        Worklog Id 282562 [ 282562 ]
        Basant Kumar logged work - 05/Nov/25 12:00 AM
        • Time Spent:
          1 hour
           

          I have uploaded the Huawei RAN CSVs in SD. I verified that the data count before and after the upload matches for all tables

        Jharna Thakur logged work - 05/Nov/25 12:00 AM
        • Time Spent:
          3 hours, 30 minutes
           

          working on csv comparison

        Bassem Sabbagh made changes -
        Status Opened [ 1 ] In Progress [ 3 ]
        Assignee Jharna Thakur [ jthakur ] Bassem Sabbagh [ bsabbagh ]
        Bassem Sabbagh made changes -
        Assignee Bassem Sabbagh [ bsabbagh ] Jharna Thakur [ jthakur ]
        Hide
        Jharna Thakur added a comment -

        I have verified and found no differences between my locally generated CSVs and the ones shared from the server. thus, I've mailed to integration to upload the CSVs in Db

        Show
        Jharna Thakur added a comment - I have verified and found no differences between my locally generated CSVs and the ones shared from the server. thus, I've mailed to integration to upload the CSVs in Db
        Jharna Thakur made changes -
        Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
        Basant Kumar made changes -
        Time Spent 4 days, 1 hour, 10 minutes [ 119400 ] 4 days, 2 hours, 10 minutes [ 123000 ]
        Worklog Id 282640 [ 282640 ]
        Jharna Thakur logged work - 06/Nov/25 12:00 AM
        • Time Spent:
          1 hour, 30 minutes
           

          checking the feedback and working on it

        Indrasan Yadav logged work - 06/Nov/25 12:00 AM - edited
        • Time Spent:
          5 hours, 30 minutes
           

          Huawei RAN tables data validation on staging-DB.

        Jharna Thakur made changes -
        Time Spent 4 days, 2 hours, 10 minutes [ 123000 ] 4 days, 5 hours, 40 minutes [ 135600 ]
        Worklog Id 282710 [ 282710 ]
        Hide
        Indrasan Yadav added a comment -

        Hi @Jharna Thakur,

        Please find below the data validation summary on the Staging DB, based on the latest CSV upload shared by @Basant Kumar.

        1. Counts OK in the below tables:
        (I) BSC
        (II) RNC
        (III) BTS
        (IV) NodeB
        (V) eNodeB
        (VI) SRAN
        (VII) Role2G
        (VIII) Role3G
        (IX) Role4G
        (X) Cabinet
        (XI) Shelf
        (XII) Radio Antenna
        (XIII) 2G Cell
        (XIV) 3G Cell
        (XV) 4G Cell
        (XVI) IP

        2. Counts Not OK in the below tables:

        (I) Board – 18,170 boards are getting parsed extra, while their parent Node / Cabinet / Shelf are not parsed
        (II) Sites – Showing 6388, whereas expected as per static sheet is 6527

        3. No data updated in below table:

        (I) Loopback Interface

        4. Tables where some header fields have blank values which should be parsed:

        Table Name Missing / Blank Fields
        Role3G: Operator / Parent RNC
        Role2G: BTS / Operator (Header missing)
        IP Data: Node ID / Dumps Path (blank at some places)
        Radio Antenna: Supplier
        4G Cell: MCC / MNC / Supplier
        ENodeB: MCC / MNC / Operator
        RNC: MCC / MNC / Operator
        BSC: MCC / MNC / Operator
        Node Cabinet: Node Type
        Node Shelf: Cabinet Index / Node ID
        Node Board: Dumps missing somewhere / Node ID
        Node Slot: Dumps Path missing in few entries / Node ID / Node Type

        Thank you
        Indrasan

        Show
        Indrasan Yadav added a comment - Hi @Jharna Thakur, Please find below the data validation summary on the Staging DB, based on the latest CSV upload shared by @Basant Kumar. 1. Counts OK in the below tables: (I) BSC (II) RNC (III) BTS (IV) NodeB (V) eNodeB (VI) SRAN (VII) Role2G (VIII) Role3G (IX) Role4G (X) Cabinet (XI) Shelf (XII) Radio Antenna (XIII) 2G Cell (XIV) 3G Cell (XV) 4G Cell (XVI) IP 2. Counts Not OK in the below tables: (I) Board – 18,170 boards are getting parsed extra, while their parent Node / Cabinet / Shelf are not parsed (II) Sites – Showing 6388, whereas expected as per static sheet is 6527 3. No data updated in below table: (I) Loopback Interface 4. Tables where some header fields have blank values which should be parsed: Table Name Missing / Blank Fields Role3G: Operator / Parent RNC Role2G: BTS / Operator (Header missing) IP Data: Node ID / Dumps Path (blank at some places) Radio Antenna: Supplier 4G Cell: MCC / MNC / Supplier ENodeB: MCC / MNC / Operator RNC: MCC / MNC / Operator BSC: MCC / MNC / Operator Node Cabinet: Node Type Node Shelf: Cabinet Index / Node ID Node Board: Dumps missing somewhere / Node ID Node Slot: Dumps Path missing in few entries / Node ID / Node Type Thank you Indrasan
        Indrasan Yadav made changes -
        Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
        Jharna Thakur logged work - 07/Nov/25 12:00 AM
        • Time Spent:
          5 hours, 30 minutes
           

          working on feedback

        Indrasan Yadav logged work - 07/Nov/25 12:00 AM
        • Time Spent:
          30 minutes
           

          Attended a teams call with Jharna to discuss and explain the highlighted issue.

        Hide
        Jharna Thakur added a comment -

        WL- 1.5 Days

        Show
        Jharna Thakur added a comment - WL- 1.5 Days
        Hide
        Bassem Sabbagh added a comment - - edited

        WIP and to be delivered by 10-11 the first half

        Show
        Bassem Sabbagh added a comment - - edited WIP and to be delivered by 10-11 the first half
        Jharna Thakur made changes -
        Time Spent 4 days, 5 hours, 40 minutes [ 135600 ] 4 days, 7 hours, 10 minutes [ 141000 ]
        Worklog Id 282816 [ 282816 ]
        Jharna Thakur made changes -
        Time Spent 4 days, 7 hours, 10 minutes [ 141000 ] 1 week, 4 hours, 40 minutes [ 160800 ]
        Worklog Id 282820 [ 282820 ]
        Indrasan Yadav made changes -
        Time Spent 1 week, 4 hours, 40 minutes [ 160800 ] 1 week, 1 day, 1 hour, 10 minutes [ 177000 ]
        Worklog Id 282839 [ 282839 ]
        Indrasan Yadav made changes -
        Time Spent 1 week, 1 day, 1 hour, 10 minutes [ 177000 ] 1 week, 1 day, 2 hours, 10 minutes [ 180600 ]
        Worklog Id 282839 [ 282839 ]
        Indrasan Yadav made changes -
        Time Spent 1 week, 1 day, 2 hours, 10 minutes [ 180600 ] 1 week, 1 day, 2 hours, 40 minutes [ 182400 ]
        Worklog Id 282841 [ 282841 ]
        Basant Kumar logged work - 10/Nov/25 12:00 AM
        • Time Spent:
          1 hour
           

          I have uploaded the CSV file provided by jharna and verified the record counts before and after uploading it in SD. The counts are matching correctly in all tables.

        Jharna Thakur logged work - 10/Nov/25 12:00 AM
        • Time Spent:
          3 hours
           

          working on feedback

        Hide
        Bassem Sabbagh added a comment -

        CSVS to be shared with integration to load them in SD by today

        Show
        Bassem Sabbagh added a comment - CSVS to be shared with integration to load them in SD by today
        Hide
        Jharna Thakur added a comment -

        CSVs are shared with integration

        Show
        Jharna Thakur added a comment - CSVs are shared with integration
        Jharna Thakur made changes -
        Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
        Indrasan Yadav logged work - 12/Nov/25 12:00 AM
        • Time Spent:
          4 hours
           

          Validated the data in Staging-DB for Huawei RAN and shared feedback to Jharna.

        Jharna Thakur logged work - 12/Nov/25 12:00 AM
        • Time Spent:
          4 hours, 30 minutes
           

          working on feedback and separating the connector

        Basant Kumar made changes -
        Time Spent 1 week, 1 day, 2 hours, 40 minutes [ 182400 ] 1 week, 1 day, 3 hours, 40 minutes [ 186000 ]
        Worklog Id 283100 [ 283100 ]
        Jharna Thakur made changes -
        Time Spent 1 week, 1 day, 3 hours, 40 minutes [ 186000 ] 1 week, 1 day, 6 hours, 40 minutes [ 196800 ]
        Worklog Id 283106 [ 283106 ]
        Hide
        Indrasan Yadav added a comment -

        Hi @Jharna Thakur,

        Please find below validation remarks for latest CSV uploaded by @Basant Kumar against previous raised issue,

        Consider Importer ID: 20251110014851_2025-11-10-01.48.51

        Table Name Missing / Blank Fields
        Role3G: Operator 12-11: Still same / Parent RNC
        Role2G: BTS 12-11: Fixed / Operator (Header missing) 12-11: Still same

        Note: As we discussed this will be fix once you will fix the issue for OT-110

        Regarding Importer Connector where still issue persist and it should be fix once the issue related to OT-110 will be fix:

        CSV-Output Table Name
        ElementCellRadioBandWidth
        ElementTrx
        GSMCell MAIO
        NetworkElementDump

        Regards,
        Indrasan

        Show
        Indrasan Yadav added a comment - Hi @Jharna Thakur, Please find below validation remarks for latest CSV uploaded by @Basant Kumar against previous raised issue, Consider Importer ID: 20251110014851_2025-11-10-01.48.51 Table Name Missing / Blank Fields Role3G: Operator 12-11: Still same / Parent RNC Role2G: BTS 12-11: Fixed / Operator (Header missing) 12-11: Still same Note: As we discussed this will be fix once you will fix the issue for OT-110 Regarding Importer Connector where still issue persist and it should be fix once the issue related to OT-110 will be fix: CSV-Output Table Name ElementCellRadioBandWidth ElementTrx GSMCell MAIO NetworkElementDump Regards, Indrasan
        Indrasan Yadav made changes -
        Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
        Indrasan Yadav made changes -
        Time Spent 1 week, 1 day, 6 hours, 40 minutes [ 196800 ] 1 week, 2 days, 3 hours, 40 minutes [ 214800 ]
        Worklog Id 283160 [ 283160 ]
        Indrasan Yadav made changes -
        Time Spent 1 week, 2 days, 3 hours, 40 minutes [ 214800 ] 1 week, 2 days, 7 hours, 40 minutes [ 229200 ]
        Worklog Id 283162 [ 283162 ]
        Indrasan Yadav made changes -
        Remaining Estimate 0 minutes [ 0 ] 5 hours [ 18000 ]
        Time Spent 1 week, 2 days, 7 hours, 40 minutes [ 229200 ] 1 week, 2 days, 2 hours, 40 minutes [ 211200 ]
        Worklog Id 283160 [ 283160 ]
        Worklog Time Spent 5 hours [ 18000 ]
        Sanju Yadav logged work - 13/Nov/25 12:00 AM
        • Time Spent:
          15 minutes
           

          All the tables below have been dropped from SD

          DROP TABLE BATCH_ELEMENT_CORE_ELEMENT;
          DROP TABLE BATCH_ELEMENT_HSS;
          DROP TABLE BATCH_ELEMENT_MGW;
          DROP TABLE BATCH_ELEMENT_MSC;
          DROP TABLE BATCH_ELEMENT_MSS;

        Basant Kumar logged work - 13/Nov/25 12:00 AM
        • Time Spent:
          1 hour
           

          i have applied AI 4.0.0.41 patch on Ooredeoo 102 .

        Jharna Thakur logged work - 13/Nov/25 12:00 AM
        • Time Spent:
          5 hours
           

          separating the connector

        Hide
        Jharna Thakur added a comment -

        Dear Indrasan Yadav, As discussed, the columns operator and importerConnector are not available in the DB because they are not defined in the model class on the server side. Although these columns appear in the CSV output, the issue should be resolved once the updated code is deployed on the server.

        Show
        Jharna Thakur added a comment - Dear Indrasan Yadav , As discussed, the columns operator and importerConnector are not available in the DB because they are not defined in the model class on the server side. Although these columns appear in the CSV output, the issue should be resolved once the updated code is deployed on the server.
        Hide
        Bassem Sabbagh added a comment -

        Patch should be released and deployed ... Indrasan to validate

        Show
        Bassem Sabbagh added a comment - Patch should be released and deployed ... Indrasan to validate
        Bassem Sabbagh made changes -
        Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
        Sanju Yadav made changes -
        Remaining Estimate 5 hours [ 18000 ] 4 hours, 45 minutes [ 17100 ]
        Time Spent 1 week, 2 days, 2 hours, 40 minutes [ 211200 ] 1 week, 2 days, 2 hours, 55 minutes [ 212100 ]
        Worklog Id 283213 [ 283213 ]
        Basant Kumar made changes -
        Remaining Estimate 4 hours, 45 minutes [ 17100 ] 3 hours, 45 minutes [ 13500 ]
        Time Spent 1 week, 2 days, 2 hours, 55 minutes [ 212100 ] 1 week, 2 days, 3 hours, 55 minutes [ 215700 ]
        Worklog Id 283240 [ 283240 ]
        Indrasan Yadav logged work - 14/Nov/25 12:00 AM
        • Time Spent:
          1 hour
           

          Discussed with Jharna for related issue & regarding pending patch which to be deployed by Integration after released by Dr. Khaled & followed for the same.

        Indrasan Yadav made changes -
        Remaining Estimate 3 hours, 45 minutes [ 13500 ] 2 hours, 45 minutes [ 9900 ]
        Time Spent 1 week, 2 days, 3 hours, 55 minutes [ 215700 ] 1 week, 2 days, 4 hours, 55 minutes [ 219300 ]
        Worklog Id 283350 [ 283350 ]
        Basant Kumar logged work - 17/Nov/25 12:00 AM
        • Time Spent:
          2 hours
           

          I have generated the Huawei RAN XML on .102 and upload the CSV output after that I have verified the counts in all tables are correctly .

        Jharna Thakur made changes -
        Remaining Estimate 2 hours, 45 minutes [ 9900 ] 0 minutes [ 0 ]
        Time Spent 1 week, 2 days, 4 hours, 55 minutes [ 219300 ] 1 week, 3 days, 1 hour, 25 minutes [ 235500 ]
        Worklog Id 283500 [ 283500 ]
        Jharna Thakur made changes -
        Time Spent 1 week, 3 days, 1 hour, 25 minutes [ 235500 ] 1 week, 3 days, 6 hours, 25 minutes [ 253500 ]
        Worklog Id 283503 [ 283503 ]
        Hide
        Indrasan Yadav added a comment -

        Dear @Basant Kumar,

        Please generate Huawei RAN XML on .102 and upload the CSV output for same on S-DB.

        Regards,
        Indrasan

        Show
        Indrasan Yadav added a comment - Dear @Basant Kumar, Please generate Huawei RAN XML on .102 and upload the CSV output for same on S-DB. Regards, Indrasan
        Basant Kumar made changes -
        Time Spent 1 week, 3 days, 6 hours, 25 minutes [ 253500 ] 1 week, 4 days, 25 minutes [ 260700 ]
        Worklog Id 283733 [ 283733 ]
        Jharna Thakur logged work - 20/Nov/25 12:00 AM - edited
        • Time Spent:
          4 hours
           

          checking the Static Files used in each connector that I've worked on and why were these file were used

        Jharna Thakur made changes -
        Time Spent 1 week, 4 days, 25 minutes [ 260700 ] 1 week, 4 days, 3 hours, 55 minutes [ 273300 ]
        Worklog Id 283925 [ 283925 ]
        Jharna Thakur made changes -
        Time Spent 1 week, 4 days, 3 hours, 55 minutes [ 273300 ] 1 week, 4 days, 4 hours, 25 minutes [ 275100 ]
        Worklog Id 283925 [ 283925 ]
        Jharna Thakur logged work - 21/Nov/25 12:00 AM
        • Time Spent:
          2 hours
           

          checking all the rules and static sheet uses and how it was use , and give the explanation to telco

        Jharna Thakur logged work - 25/Nov/25 12:00 AM
        • Time Spent:
          2 hours, 15 minutes
           

          checking the use of static sheet and call with telco

        Jharna Thakur made changes -
        Time Spent 1 week, 4 days, 4 hours, 25 minutes [ 275100 ] 1 week, 4 days, 6 hours, 25 minutes [ 282300 ]
        Worklog Id 284234 [ 284234 ]
        Jharna Thakur made changes -
        Time Spent 1 week, 4 days, 6 hours, 25 minutes [ 282300 ] 2 weeks, 40 minutes [ 290400 ]
        Worklog Id 284906 [ 284906 ]
        Indrasan Yadav made changes -
        Status In Progress [ 3 ] Opened [ 1 ]
        Indrasan Yadav logged work - 26/Dec/25 12:00 AM
        • Time Spent:
          2 hours
           

          Check & validate the data in staging-DB for same connector.

        Hide
        Indrasan Yadav added a comment - - edited

        1- All data are available in staging DB correct except the table count "Node interface" where count seem very high (Count is same in CSV output & S-DB, it means issue is in generation) which to be check by Jharna Thakur.

        2- Importer connector is missing some where in table "sub interface"
        3- Importer connector is available in table "Radio antenna" but in query it is not finding due to spelling wrong of "ImporterConnector" it is "importorconnector" in radio antenna. (Last O should be replaced with E in word importer)

        Show
        Indrasan Yadav added a comment - - edited 1- All data are available in staging DB correct except the table count "Node interface" where count seem very high (Count is same in CSV output & S-DB, it means issue is in generation) which to be check by Jharna Thakur . 2- Importer connector is missing some where in table "sub interface" 3- Importer connector is available in table "Radio antenna" but in query it is not finding due to spelling wrong of "ImporterConnector" it is "importorconnector" in radio antenna. (Last O should be replaced with E in word importer)
        Hide
        Indrasan Yadav added a comment -

        All the above points have been fixed in the CSV output received on 26-12-2025 for the micro site issue (JIRA: OT-45).

        Once the file is uploaded to S-DB, I will verify the changes.
        The upload to S-DB is currently pending due to the latest AI patch release, which is awaiting confirmation from Dr. Khaled. Once the patch is released, I will request the integration team to deploy it on .102, after which I will ask Jharna to share the same CSV output with the integration team for uploading to S-DB.

        Show
        Indrasan Yadav added a comment - All the above points have been fixed in the CSV output received on 26-12-2025 for the micro site issue (JIRA: OT-45 ). Once the file is uploaded to S-DB, I will verify the changes. The upload to S-DB is currently pending due to the latest AI patch release, which is awaiting confirmation from Dr. Khaled. Once the patch is released, I will request the integration team to deploy it on .102, after which I will ask Jharna to share the same CSV output with the integration team for uploading to S-DB.
        Indrasan Yadav logged work - 30/Dec/25 12:00 AM
        • Time Spent:
          1 hour, 30 minutes
           

          Validate data on s-DB.

        Hide
        Indrasan Yadav added a comment -

        Latest AI patch has been deployed on .120 & requested to Basant to generate XML & CSV on server and share to me for validation and I validated for same, now issue has been fixed for point 3 but not fixed for point 1 & 2 due to code not committed for same. (Locally it is fixed we will commit the code & to be check on server for same)

        Jharna Thakur, please commit the code for point 1 & 2.

        Show
        Indrasan Yadav added a comment - Latest AI patch has been deployed on .120 & requested to Basant to generate XML & CSV on server and share to me for validation and I validated for same, now issue has been fixed for point 3 but not fixed for point 1 & 2 due to code not committed for same. (Locally it is fixed we will commit the code & to be check on server for same) Jharna Thakur , please commit the code for point 1 & 2.
        Indrasan Yadav made changes -
        Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
        Hide
        Jharna Thakur added a comment -

        code committed

        Show
        Jharna Thakur added a comment - code committed
        Jharna Thakur made changes -
        Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
        Indrasan Yadav made changes -
        Time Spent 2 weeks, 40 minutes [ 290400 ] 2 weeks, 2 hours, 40 minutes [ 297600 ]
        Worklog Id 287518 [ 287518 ]
        Indrasan Yadav logged work - 31/Dec/25 12:00 AM
        • Time Spent:
          1 hour
           

          Taken the followed up with Dr. Khaled to release latest AI patch after compile code committed by @Jharna and requested to deploy the latest AI patch on server and generate the XML and upload csv output on staging-DB.

        Indrasan Yadav made changes -
        Time Spent 2 weeks, 2 hours, 40 minutes [ 297600 ] 2 weeks, 4 hours, 10 minutes [ 303000 ]
        Worklog Id 287832 [ 287832 ]
        Indrasan Yadav made changes -
        Time Spent 2 weeks, 4 hours, 10 minutes [ 303000 ] 2 weeks, 5 hours, 10 minutes [ 306600 ]
        Worklog Id 287839 [ 287839 ]
        Indrasan Yadav made changes -
        Status Opened [ 1 ] In Progress [ 3 ]
        Hide
        Indrasan Yadav added a comment - - edited

        Hi Jharna,

        Earlier, the issue was only with the Node Interface table, where the count was mismatched. That issue is now resolved, and the count for the Node Interface table looks correct.

        However, the following issues have now appeared, which were previously fixed:
        Importer ID: "20251231015405_2025-12-31-01.54.05"

        Below are the current issues identified during validation:

        1- Boards count mismatch – Currently showing 129,061, whereas it should be 110,351.
        2- Importer connector issue – I have reverted the related changes in OT-83.
        3- Dump path missing in some records under the IP Data / Board table.
        4- Node ID is missing in the Cabinet / Shelf / Board tables.
        5- Start RU “-1” is appearing again in the Shelf table, which was already fixed in the previous cycle.
        6- Supplier information is missing in Radio Antenna / 4G Cell tables.
        7- MCC–MNC is parsing incorrectly (showing value 0) in 4G Cell / eNodeB / RNC / BSC tables.
        8-Technology is not parsing for all nodes in SRAN, which was fixed last week but has reappeared.
        9- Operator field is missing in eNodeB / Role3G / Role2G / RNC / BSC tables.
        10- Also to be check the header "elementNodeId" in table "radioantenna" which is available in CSV output but missing in XML.

        Show
        Indrasan Yadav added a comment - - edited Hi Jharna, Earlier, the issue was only with the Node Interface table, where the count was mismatched. That issue is now resolved, and the count for the Node Interface table looks correct. However, the following issues have now appeared, which were previously fixed: Importer ID: "20251231015405_2025-12-31-01.54.05" Below are the current issues identified during validation: 1- Boards count mismatch – Currently showing 129,061, whereas it should be 110,351. 2- Importer connector issue – I have reverted the related changes in OT-83 . 3- Dump path missing in some records under the IP Data / Board table. 4- Node ID is missing in the Cabinet / Shelf / Board tables. 5- Start RU “-1” is appearing again in the Shelf table, which was already fixed in the previous cycle. 6- Supplier information is missing in Radio Antenna / 4G Cell tables. 7- MCC–MNC is parsing incorrectly (showing value 0) in 4G Cell / eNodeB / RNC / BSC tables. 8-Technology is not parsing for all nodes in SRAN, which was fixed last week but has reappeared. 9- Operator field is missing in eNodeB / Role3G / Role2G / RNC / BSC tables. 10- Also to be check the header "elementNodeId" in table "radioantenna" which is available in CSV output but missing in XML.
        Indrasan Yadav made changes -
        Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
        Basant Kumar logged work - 06/Jan/26 12:00 AM
        • Time Spent:
          1 hour
           

          I have generated the CSV output for Huawei RAN Ooredoo using the huaweiM2000V2Connector . and csv-output has been uploaded in SD

        Jharna Thakur logged work - 06/Jan/26 12:00 AM
        • Time Spent:
          1 hour, 30 minutes
           

          checking the issue in local for further confirmation

        Hide
        Bassem Sabbagh added a comment -

        XML and CSVs are generated with no issues on local laptop of Jharna ... it could be integration issue ... L2 to generate again the XML and share it for validation ...

        Show
        Bassem Sabbagh added a comment - XML and CSVs are generated with no issues on local laptop of Jharna ... it could be integration issue ... L2 to generate again the XML and share it for validation ...
        Indrasan Yadav logged work - 07/Jan/26 12:00 AM - edited
        • Time Spent:
          4 hours, 30 minutes
           

          All highlighted issues have now been fixed as I validated the data on staging-DB, except point no. 10, which will be addressed under OT-45 as confirmed by Jharna.

        Basant Kumar logged work - 07/Jan/26 12:00 AM
        • Time Spent:
          1 hour
           

          I have generated the CSV output for Huawei RAN Ooredoo using the huaweiM2000V2Connector . and csv-output has been uploaded in SD.

        Jharna Thakur logged work - 07/Jan/26 12:00 AM - edited
        • Time Spent:
          2 hours, 30 minutes
           

          checking in staging db and CSV output

        Jharna Thakur made changes -
        Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
        Jharna Thakur made changes -
        Comment [ I have checked the staging database and issues have now been resolved.
        Previously, the Omantel connector was executed instead of the Ooredoo Huawei RAN connector, which caused the discrepancy. This has been corrected. ]
        Hide
        Jharna Thakur added a comment -

        I have checked the staging database and the issues have now been resolved.
        Previously, the Omantel connector was executed instead of the Ooredoo Huawei RAN connector, which caused the discrepancy. This has been corrected.

        Show
        Jharna Thakur added a comment - I have checked the staging database and the issues have now been resolved. Previously, the Omantel connector was executed instead of the Ooredoo Huawei RAN connector, which caused the discrepancy. This has been corrected.
        Basant Kumar made changes -
        Time Spent 2 weeks, 5 hours, 10 minutes [ 306600 ] 2 weeks, 6 hours, 10 minutes [ 310200 ]
        Worklog Id 288320 [ 288320 ]
        Hide
        Indrasan Yadav added a comment - - edited

        All highlighted issues have now been fixed as I validated the data on staging-DB, except point no. 10, which will be addressed under OT-45 as confirmed by Jharna.

        Show
        Indrasan Yadav added a comment - - edited All highlighted issues have now been fixed as I validated the data on staging-DB, except point no. 10, which will be addressed under OT-45 as confirmed by Jharna.
        Indrasan Yadav made changes -
        Status In Progress [ 3 ] Opened [ 1 ]
        Indrasan Yadav made changes -
        Status Opened [ 1 ] Resolved [ 5 ]
        Resolution Fixed [ 1 ]
        Indrasan Yadav made changes -
        Status Resolved [ 5 ] Closed [ 6 ]
        Indrasan Yadav made changes -
        Resolution Fixed [ 1 ]
        Status Closed [ 6 ] Reopened [ 4 ]
        Indrasan Yadav made changes -
        Status Reopened [ 4 ] Resolved [ 5 ]
        Resolution Fixed [ 1 ]
        Indrasan Yadav made changes -
        Time Spent 2 weeks, 6 hours, 10 minutes [ 310200 ] 2 weeks, 1 day, 2 hours, 40 minutes [ 326400 ]
        Worklog Id 288343 [ 288343 ]
        Indrasan Yadav made changes -
        Worklog Id 288343 [ 288343 ]
        Basant Kumar made changes -
        Time Spent 2 weeks, 1 day, 2 hours, 40 minutes [ 326400 ] 2 weeks, 1 day, 3 hours, 40 minutes [ 330000 ]
        Worklog Id 288354 [ 288354 ]
        Jharna Thakur made changes -
        Time Spent 2 weeks, 1 day, 3 hours, 40 minutes [ 330000 ] 2 weeks, 1 day, 5 hours, 40 minutes [ 337200 ]
        Worklog Id 288402 [ 288402 ]
        Jharna Thakur made changes -
        Time Spent 2 weeks, 1 day, 5 hours, 40 minutes [ 337200 ] 2 weeks, 1 day, 7 hours, 10 minutes [ 342600 ]
        Worklog Id 288403 [ 288403 ]
        Jharna Thakur made changes -
        Time Spent 2 weeks, 1 day, 7 hours, 10 minutes [ 342600 ] 2 weeks, 1 day, 7 hours, 40 minutes [ 344400 ]
        Worklog Id 288402 [ 288402 ]
        Indrasan Yadav logged work - 09/Jan/26 12:00 AM
        • Time Spent:
          3 hours, 30 minutes
           

          Validation for missing "elementnodeid" header missing in "radioantenna" in table & xml now issue is fixed, brief validation for all at node level & connector name. requested to commit the code for same.

        Hide
        Indrasan Yadav added a comment -

        The missing header elementNodeId is now available in the radio antenna table.

        Jharna Thakur, please proceed with committing the code for the same.

        Show
        Indrasan Yadav added a comment - The missing header elementNodeId is now available in the radio antenna table. Jharna Thakur , please proceed with committing the code for the same.
        Indrasan Yadav made changes -
        Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
        Indrasan Yadav made changes -
        Time Spent 2 weeks, 1 day, 7 hours, 40 minutes [ 344400 ] 2 weeks, 2 days, 3 hours, 10 minutes [ 357000 ]
        Worklog Id 288551 [ 288551 ]
        Hide
        Jharna Thakur added a comment -

        code committed

        Show
        Jharna Thakur added a comment - code committed
        Bassem Sabbagh made changes -
        Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
        Indrasan Yadav logged work - 13/Jan/26 12:00 AM - edited
        • Time Spent:
          2 hours, 30 minutes
           

          Validated the all Huawei RAN data on server after deployed latest AI patch & using updated static sheet.

        Hide
        Indrasan Yadav added a comment -

        Latest patch deployed on server, to be check data on staging-DB.

        Show
        Indrasan Yadav added a comment - Latest patch deployed on server, to be check data on staging-DB.
        Hide
        Indrasan Yadav added a comment -

        Now, all issue has been fixed.

        Show
        Indrasan Yadav added a comment - Now, all issue has been fixed.
        Indrasan Yadav made changes -
        Status Resolved [ 5 ] Closed [ 6 ]
        Indrasan Yadav made changes -
        Resolution Fixed [ 1 ]
        Status Closed [ 6 ] Reopened [ 4 ]
        Indrasan Yadav made changes -
        Time Spent 2 weeks, 2 days, 3 hours, 10 minutes [ 357000 ] 2 weeks, 2 days, 6 hours, 10 minutes [ 367800 ]
        Worklog Id 288723 [ 288723 ]
        Indrasan Yadav made changes -
        Remaining Estimate 0 minutes [ 0 ] 30 minutes [ 1800 ]
        Time Spent 2 weeks, 2 days, 6 hours, 10 minutes [ 367800 ] 2 weeks, 2 days, 5 hours, 40 minutes [ 366000 ]
        Worklog Id 288723 [ 288723 ]
        Indrasan Yadav made changes -
        Status Reopened [ 4 ] Resolved [ 5 ]
        Resolution Fixed [ 1 ]
        Indrasan Yadav made changes -
        Status Resolved [ 5 ] Closed [ 6 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Opened Opened In Progress In Progress
        59d 13m 2 Indrasan Yadav 31/Dec/25 10:39 AM
        In Progress In Progress Opened Opened
        40d 23h 32m 2 Indrasan Yadav 07/Jan/26 10:25 AM
        Opened Opened Resolved Resolved
        13s 1 Indrasan Yadav 07/Jan/26 10:25 AM
        Closed Closed Reopened Reopened
        1h 18m 2 Indrasan Yadav 13/Jan/26 12:02 PM
        Reopened Reopened Resolved Resolved
        4m 46s 2 Indrasan Yadav 13/Jan/26 12:06 PM
        Resolved Resolved Closed Closed
        6d 18m 3 Indrasan Yadav 13/Jan/26 12:07 PM
        Subversion JIRA

        Links Hierarchy

         Documentation

        Invalid license: EXPIRED

          People

          • Assignee:
            Indrasan Yadav
            Reporter:
            Indrasan Yadav
          • Votes:
            1 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Actual End:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Time Spent - 2 weeks, 2 days, 5 hours, 40 minutes Remaining Estimate - 30 minutes
              30m
              Logged:
              Time Spent - 2 weeks, 2 days, 5 hours, 40 minutes Remaining Estimate - 30 minutes