Details

    • Customer:
      Zain KSA 3.X

      Description

      Click to add description

      Issue Links

        Activity

        Indrasan Yadav logged work - 22/Nov/24 12:00 AM
        • Time Spent:
          3 hours
           

          Worked on this issue & tak a call with @Diana to fix this.

        Indrasan Yadav made changes -
        Field Original Value New Value
        Gantt Options Milestone (set to milestone: having a due date but zero effort)
        Planned Start 2024-11-25 24:00 (milestone: set planned start date to due date)
        Planned End 2024-11-25 24:00 (milestone: set planned end date to due date)
        Indrasan Yadav made changes -
        Assignee Indrasan Yadav [ iyadav ] Khaled Khalil [ kkhalil ]
        Hide
        Indrasan Yadav added a comment -

        Dear @Khaled Khalil,

        Could you please assign a DEV resource to investigate the following issue?

        Issue Details:

        I am attempting to create a BTS type as “BTS,” and have created an equipment model with the same name. However, when saving the changes, the system throws an error:

        “This BTS type already exists.”

        Upon verification, the mentioned BTS type is not present in the system.

        Error Snippet:

        Your immediate assistance in resolving this issue would be greatly appreciated, as it is blocking further progress.

        Best regards,
        Indrasan

        Show
        Indrasan Yadav added a comment - Dear @Khaled Khalil, Could you please assign a DEV resource to investigate the following issue? Issue Details: I am attempting to create a BTS type as “BTS,” and have created an equipment model with the same name. However, when saving the changes, the system throws an error: “This BTS type already exists.” Upon verification, the mentioned BTS type is not present in the system. Error Snippet: Your immediate assistance in resolving this issue would be greatly appreciated, as it is blocking further progress. Best regards, Indrasan
        Indrasan Yadav made changes -
        Link This issue blocks ZKU-117 [ ZKU-117 ]
        Khaled Khalil made changes -
        Assignee Khaled Khalil [ kkhalil ] Diana Hamdouche [ dhamdouche ]
        Indrasan Yadav made changes -
        Remaining Estimate 0 minutes [ 0 ]
        Time Spent 3 hours [ 10800 ]
        Worklog Id 257602 [ 257602 ]
        Indrasan Yadav made changes -
        Baseline Start 2024-11-25 24:00 (set baseline based of initial work logging)
        Baseline End 2024-11-25 24:00 (set baseline based of initial work logging)
        Hide
        Diana Hamdouche added a comment - - edited

        Dear @Indrasan,

        As discussed via teams, the issue is that you have a BTS type for 2g Role named BTS under SRAN-BS Type named BTS . So, please:
        Lets take the Example you reported "BTS", please follow this steps:
        1) Update its Equipment model type to BTS (it was SRAN-BS):
        2) Update the 2G, 3G, 4G, 5G Configuration's name (change it from BTS to BTS_GSM for example) under SRAN-BAS Type "BTS":
        3) Create the new BTS Type "BTS"

        Attached an email for reference

        Show
        Diana Hamdouche added a comment - - edited Dear @Indrasan, As discussed via teams, the issue is that you have a BTS type for 2g Role named BTS under SRAN-BS Type named BTS . So, please: Lets take the Example you reported "BTS", please follow this steps: 1) Update its Equipment model type to BTS (it was SRAN-BS): 2) Update the 2G, 3G, 4G, 5G Configuration's name (change it from BTS to BTS_GSM for example) under SRAN-BAS Type "BTS": 3) Create the new BTS Type "BTS" Attached an email for reference
        Diana Hamdouche made changes -
        Diana Hamdouche made changes -
        Assignee Diana Hamdouche [ dhamdouche ] Indrasan Yadav [ iyadav ]
        Hide
        Indrasan Yadav added a comment -

        Okay, Understood.

        We can close this.

        Show
        Indrasan Yadav added a comment - Okay, Understood. We can close this.
        Indrasan Yadav made changes -
        Status To Do [ 10001 ] Done [ 10000 ]
        Ahad Siddiqui made changes -
        Link This issue blocks ZKU-117 [ ZKU-117 ]
        Indrasan Yadav made changes -
        Link This issue blocks ZKU-94 [ ZKU-94 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        To Do To Do Done Done
        3d 2h 56m 1 Indrasan Yadav 25/Nov/24 7:05 AM
        Subversion JIRA

        Links Hierarchy

         Documentation

        Invalid license: EXPIRED

          People

          • Assignee:
            Indrasan Yadav
            Reporter:
            Indrasan Yadav
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 3 hours
              3h

                Drag and Drop