        Indrasan Yadav made changes -
        Field Original Value New Value
        Gantt Options Milestone (set to milestone: having a due date but zero effort)
        Planned Start 2024-12-10 24:00 (milestone: set planned start date to due date)
        Planned End 2024-12-10 24:00 (milestone: set planned end date to due date)
        Hide
        Indrasan Yadav added a comment -

        Dear @Ahad Siddiqui,

        As discussed, please find the attached node list sheet, which includes the following details:

        1. Missing serial numbers in the dump.
        2. Duplicate serial numbers in the dump.

        I have shared an example for the cabinet case as a sample, and the same applies for the shelf/board.

        For example, regarding point 1:

        • RIY2325-P2_SRAN: The cabinet serial number is missing in the dump.

        An example for point 2:

        • The cabinet serial number "21021131694JB1000000" appears in the dump for the following 5 nodes. A snippet is shared below for reference:

        TRF2796-P2_SRAN

        KHJ2M4304-P3

        MBTS-DAM2403-P2_SRAN

        RIY2783-P3_SRAN

        DAM2M4403-P2

        Please let me know if you need any further clarification.

        Best regards,
        Indrasan

        Show
        Indrasan Yadav added a comment - Dear @Ahad Siddiqui, As discussed, please find the attached node list sheet, which includes the following details: 1. Missing serial numbers in the dump. 2. Duplicate serial numbers in the dump. I have shared an example for the cabinet case as a sample, and the same applies for the shelf/board. For example, regarding point 1: • RIY2325-P2_SRAN: The cabinet serial number is missing in the dump. An example for point 2: • The cabinet serial number "21021131694JB1000000" appears in the dump for the following 5 nodes. A snippet is shared below for reference: TRF2796-P2_SRAN KHJ2M4304-P3 MBTS-DAM2403-P2_SRAN RIY2783-P3_SRAN DAM2M4403-P2 Please let me know if you need any further clarification. Best regards, Indrasan
        Indrasan Yadav made changes -
        Attachment ZKU-204.xlsx [ 103406 ]
        Indrasan Yadav made changes -
        Status To Do [ 10001 ] Done [ 10000 ]
        Indrasan Yadav logged work - 02/Jan/25 12:00 AM - edited
        • Time Spent:
          1 hour
           

          Dear @Ahad Siddiqui,

          As per our discussion, please find below the updated details:

          Case 1: Duplicate node appearing in dump with different models.

          Example: The node "HHR2068-P3_SRAN-PC" is listed with models BTS3900 and BTS5900.

          Case 2: Duplicate child node persists under different nodes.

          Example: The child node "MDN2C2996-MMM-P1-VIP" is found under two different nodes: "MDN2996-P1-VIP_SRAN" and "MDN2996-MMM-P1-VIP".

          Case 3: Nodes missing in LIC nodes after removing MBTS & HUB nodes.
          Please find the attached updated sheet.

          Case 4: Missing serial numbers excluding MBTS nodes.
          Please find the attached updated sheet.

          Case 5: Duplicate serial numbers excluding MBTS type nodes.
          Please find the attached updated sheet.

          Best regards,
          Indrasan

        Indrasan Yadav made changes -
        Link This issue blocks ZKU-94 [ ZKU-94 ]
        Indrasan Yadav made changes -
        Remaining Estimate 0 minutes [ 0 ]
        Time Spent 1 hour [ 3600 ]
        Worklog Id 258704 [ 258704 ]
        Indrasan Yadav made changes -
        Baseline Start 2024-12-10 24:00 (set baseline based of initial work logging)
        Baseline End 2024-12-10 24:00 (set baseline based of initial work logging)
        Indrasan Yadav made changes -
        Worklog Id 258704 [ 258704 ]
        Navneet Kaur made changes -
        Status Done [ 10000 ] To Do [ 10001 ]
        Indrasan Yadav made changes -
        Assignee Indrasan Yadav [ iyadav ] Navneet Kaur [ nkaur ]
        Indrasan Yadav made changes -
        Assignee Navneet Kaur [ nkaur ] Indrasan Yadav [ iyadav ]
        Hide
        Indrasan Yadav added a comment - - edited

        This issue has been highlighted to customer, and giving comment here as suggested by @Bassem.(Mail attached also for reference with attached file name of "Mail_20-03-2025")
        _________________________________________________________________________________________________
        Owner: Mubarak/Ibrahim
        Closure date:
        Mail details:
        Sent By : Ahad Siddiqui
        Sent to : Mubarak/Ibrahim
        Date&Time : Wed 11-12-2024 11:46(IST)

        Status: In progress
        _________________________________________________________________________________________________
        Same is available on sharepoint on below path:

        Sharepoint path: Project documents> Zain KSA 3.X> Dump Issues> Dump_Status_ZAIN_KSA_Summary (Excel sheet_File name)> Overall Status (TAB) at row serial number '20'

        Show
        Indrasan Yadav added a comment - - edited This issue has been highlighted to customer, and giving comment here as suggested by @Bassem.(Mail attached also for reference with attached file name of "Mail_20-03-2025") _________________________________________________________________________________________________ Owner: Mubarak/Ibrahim Closure date: Mail details: Sent By : Ahad Siddiqui Sent to : Mubarak/Ibrahim Date&Time : Wed 11-12-2024 11:46(IST) Status: In progress _________________________________________________________________________________________________ Same is available on sharepoint on below path: Sharepoint path: Project documents> Zain KSA 3.X> Dump Issues> Dump_Status_ZAIN_KSA_Summary (Excel sheet_File name)> Overall Status (TAB) at row serial number '20'
        Indrasan Yadav made changes -
        Status To Do [ 10001 ] In Progress [ 3 ]
        Hide
        Indrasan Yadav added a comment -

        I am going to close this JIRA as this issue is already highlighted to customer & updated on sharepoint also.

        Show
        Indrasan Yadav added a comment - I am going to close this JIRA as this issue is already highlighted to customer & updated on sharepoint also.
        Indrasan Yadav made changes -
        Status In Progress [ 3 ] Done [ 10000 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        To Do To Do Done Done
        3h 33m 1 Indrasan Yadav 10/Dec/24 9:41 AM
        Done Done To Do To Do
        36d 23h 58m 1 Navneet Kaur 16/Jan/25 9:40 AM
        To Do To Do In Progress In Progress
        94d 17h 57m 1 Indrasan Yadav 21/Apr/25 4:37 AM
        In Progress In Progress Done Done
        11s 1 Indrasan Yadav 21/Apr/25 4:37 AM
        Subversion JIRA

        Links Hierarchy

         Documentation

        Invalid license: EXPIRED

          People

          • Assignee:
            Indrasan Yadav
            Reporter:
            Indrasan Yadav
          • Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 hour
              1h