Details
-
Type:
Task
-
Status:
Done (View Workflow)
-
Priority:
Normal
-
Resolution: Unresolved
-
Labels:
-
Customer:Zain KSA 3.X
Description
Activity
- All
- Comments
- Work Log
- History
- Activity
- Links Hierarchy
- Transitions
- Trace
-
- Time Spent:
- 4 hours
-
tried to cross check the Nokia count with data forwarded by @Ahad which was shared by @Customer (technology based node count). which is totally different so discussed with @Ahad & update the same.
He suggested we need to take a call with customer & we will request a csv report to cross validation.
-
- Time Spent:
- 2 hours, 30 minutes
-
@Navneet called me to take update on JIRA.
Attended meeting with @Customer (ZAIN-KSA & Navneet/Basse/Azmat) regarding count validation for Huawei & Nokia
-
- Time Spent:
- 4 hours, 30 minutes
-
1-Arrange the licenses dump of Nokia & Huawei and share to @Sanju over the mail as requested by @Ahad in WhatsApp group.
2-Checked report (Huawei & Nokia) which was shared by @Customer in meeting of date 30-01-2025.
-
- Time Spent:
- 3 hours, 30 minutes
-
Worked on report which shared by customer in meeting on 30-01-2025.
as discussed with @Bassem we need to take latest dump and ask integration to share xml based on latest dump and import on .14 then validate NEP report with report which shared by customer.
-
- Time Spent:
- 4 hours
-
1- Worked on latest dump to differentiate RAN & Core nodes to generate XML. (1 hour)
2- After generate latest XML validated the same. (1 hour)
3- Worked on Serial number count which shared by ZAIN for Huawei.(Where i faced issue in board to take serial count). (2 hour)
-
- Time Spent:
- 1 day
-
1-Take report from .14 related to physical of Huawei_RAN after import finished.
2-Consolidate serial numbers of ZAIN data for serial numbers.
3-Cross validate the serial of ZAIN Vs NEP.
It is taking too much time due to excel sheet hang issue (Sometime it is taking 1 hr or more than ot to wait for excel response)
-
- Time Spent:
- 1 hour, 30 minutes
-
As discussed with internal including me/Ahad/Navneet I send require criteria to @Navneet & @Ahad as discussed in yesterday meeting with ZAIN-KSA team.
for more detail need to follow FRS for Huawei & Nokia.
-
- Time Spent:
- 3 hours
-
Tried to log in production server as I don't have direct access, it's dependent on @Ahad and checked NE report where found that many nodes are available with "Auto site" which should not. @As per @Ahad integration didn't used latest site matching.
-
- Time Spent:
- 6 hours
-
2 Hrs- Worked on production to sanity check of data.
4 Hrs- Waiting for VPN access as it is not working.
-
- Time Spent:
- 6 hours
-
4 hrs-Crossed check the count data which is received from ZAIN side for Huawei_RAN and reverted on same mail..
2- Hrs-Waiting for VPN access as it is not working so can't be check sanity check on production.
-
- Time Spent:
- 3 hours
-
Waiting for VPN issue, due to this we are unable to check sanity check on production.
-
- Time Spent:
- 1 day
-
Waiting for VPN issue, due to this we are unable to check sanity check on production.
-
- Time Spent:
- 1 hour
-
Discussed & requested to integration to share Nokia latest dump from production.
and shared same dump to AI DEV to generate XML for same as @Bassem need inventory report based on latest dump from .14/UAT which to be share to @Mostafa Kalown.
-
- Time Spent:
- 2 hours
-
Discussed with @Juned to share Nokia XML based on shared latest dump.
first he told he will share but not respond later.
talked to @Sandya to share the same if possible and waiting for the same.
also send an email multiple time
-
- Time Spent:
- 30 minutes
-
@Navneet called to me to take update of ongoing task & I discussed with @Abhinav regarding platform UAT is free so he can deploy pending patched on there.
-
- Time Spent:
- 3 hours, 30 minutes
-
Validate the Nokia XML (2025-02-21-12.28.57_ZainKsa) based on latest dump as requested by @Bassem and requested to copy on .14 & UAT.
And, as discussed in daily meeting tried to take require sample dump from Airtel team but couldn't.
as checked with them for sample dump of Nokia.
-
- Time Spent:
- 5 hours, 30 minutes
-
Shared sample dump of Huawei & Nokia for new project, for Nokia extracted require dump of one node from big size of Nokia dump which is shared by @Ahad.
Taken multiple call with @Ahad for his API testing where he was unable to log in UAT-NEP so i log in from my laptop and do what he said as per requirement. after that i started Huawei RAN XML import on UAT.
actually UAT is working very very slow so it is taking too much time.
-
- Time Spent:
- 7 hours, 30 minutes
-
Tried to log in NEP after VPN connection via RDP as alternate process given by ZAIN team.
Multiple tried with @Ahad but couldn't happend successfully, finally late evening it was connected and attempted production sanity check of ZAIN-KSA regarding nodes/site/cabinet/shelf/board/licenses/antenna etc.
-
- Time Spent:
- 7 hours, 30 minutes
-
Production sanity check of ZAIN-KSA regarding nodes/site/cabinet/shelf/board/licenses/antenna etc.
Issue faced regarding credential authentication & highlighted to integration.
-
- Time Spent:
- 1 day
-
Production sanity check of ZAIN-KSA regarding nodes/site/cabinet/shelf/board/licenses/antenna etc.
-
- Time Spent:
- 1 hour, 30 minutes
-
Sanity check on production for Huawei & Nokia
-
- Time Spent:
- 1 hour
-
Sanity check on production.
-
- Time Spent:
- 7 hours
-
Sanity check on production.
-
- Time Spent:
- 7 hours
-
Sanity check on production but could not check completely because incomplete XML was generated & imported on production later Integration generated another XML on production but it was not imported.
-
- Time Spent:
- 7 hours
-
ATS-10753: Checked & tried to understand what is actual issue as this is Airtel JIRA which is send by @Bassem for check. (1.5 Hrs)
ATS-10754: Checked & tried to understand what is actual issue as this is Airtel JIRA which is send by @Bassem for check. (1.5 Hrs.)
Sanity check on production but could not done due to RDP issue, I mean RDP is not connecting and same has been highlighted to Cybermak team. (4)
-
- Time Spent:
- 7 hours
-
1- RAM Upgradation & Re-Installation of VM by IT guy. (6 Hrs.)
2- Briefly sanity check on production. (1 Hrs.)
-
- Time Spent:
- 3 hours
-
production sanity check.
-
- Time Spent:
- 5 hours
-
Sanity check on production but xml generation & import is not happening via automatically on production as some testing is ongoing.
-
- Time Spent:
- 7 hours, 30 minutes
-
Sanity check on production (XML & NEP) but xml generation & import is not happening via automatically on production as some testing is ongoing. so as confirmed with @Bassem/@Ahad manual full XML import started on production.
-
- Time Spent:
- 4 hours, 30 minutes
-
Sanity check on production after manual XML import completed.
-
- Time Spent:
- 6 hours, 30 minutes
-
1-Multiple time tried to log in NEP via VMW & Local but couldn't due to an error appeared and for same issue send an email to @Ahad.
2-Consolidate the list of all open status JIRA which was created by me and send an updated mail to @Bassem to confirm what we need to do? we can close or not?
-
- Time Spent:
- 7 hours
-
Tried multiple times to log in NEP via VMW & Local after VPN connected but couldn't as there is an error was coming and same has been also highlighted to @Ahad. (4 Hrs.)
Analyse the received mail from @Bassem which was related to Airtel task (
ATS-10769) and discussed with @Priyasha to understand the actual issue and reverted my feedback on same mail.(2 Hrs.)@Ahad called me to confirm RAN related date for Ooredoo Tunisia. (1 Hrs.)
-
- Time Spent:
- 7 hours, 30 minutes
-
Tried to collect require documents from @Dharmednra to prepare documents for connector Huawei MRS & Huawei SHLR related to staging DB but he couldn't shared require sheet as he was taking still snaps.
Worked on Airtel issue (
ATS-10769), multiple discussion with internal teams.
-
- Time Spent:
- 6 hours
-
Worked on make documents of connector (Huawei_SHLR) staging DB.
-
- Time Spent:
- 1 day
-
1- Worked on documents preparation for connector Huawei SHLR as suggested by @Basse.
2- Worked on a brief checked sample dump (Ooredoo Tunisia) which is available on mail and that mail
was forwarded by @Bassem.
-
- Time Spent:
- 7 hours
-
Analyse the sample dump of Ooredoo Tunisia which was shared by @Bassem.
-
- Time Spent:
- 5 hours
-
Analyse the sample dump of Ooredoo Tunisia which was shared by @Bassem. and make a documents as suggested by him and shared over the mail.
-
- Time Spent:
- 2 hours
-
Attended a training session with @Ahad & team (Divya, Azmat, Priyasha, Anuj) "regarding AI Process Core"
-
- Time Spent:
- 2 hours
-
Attended a training session with @Ahad & team (Divya, Azmat, Priyasha, Anuj) "regarding about NEP"
-
- Time Spent:
- 1 hour
-
Attended a training session with @Ahad & team (Divya, Azmat, Priyasha, Anuj) "regarding validation process"
-
- Time Spent:
- 2 hours
-
Attended a training session with @Ahad & team (Divya, Azmat, Priyasha, Anuj) "regarding DETAILED SESSION ON CORE( FRS PREPARATION, AUDIT PROCESS)"
-
- Time Spent:
- 2 hours
-
Attended a training session with @Ahad & team (Divya, Azmat, Priyasha, Anuj) "regarding DETAILED SESSION ON IP"
-
- Time Spent:
- 4 hours
-
Worked on to check sample dump of Ooredoo Tunisia and update/upload/attached the data/sheet on sharepoint as suggested by @Bassem.
-
- Time Spent:
- 6 hours
-
Checked sample dump of Ooredoo Tunisia of date 20-03-2025 for RNC-Logical. (Taken reference FRS of Azer-Connect)
-
- Time Spent:
- 1 hour, 30 minutes
-
Taken some sample report which requested by @Bassem from NEP of ZAIN-KSA & OmanTel, and also tried to taken from ZAIN-KW NEP with the help of @Daljit.