Details

    • Customer:
      Zain KSA 3.X

      Description

      Partial licenses are parsing in XML on prod, only first sheet licenses are importing, this kind issue was occurred once before & this is repeated again on production.

      kindly get check the issue & resolve the same.

        Activity

        Azmat Ali made changes -
        Field Original Value New Value
        Gantt Options Milestone (set to milestone: having a due date but zero effort)
        Planned Start 2025-03-05 24:00 (milestone: set planned start date to due date)
        Planned End 2025-03-05 24:00 (milestone: set planned end date to due date)
        Azmat Ali made changes -
        Attachment IDU Licenses.zip [ 104209 ]
        Azmat Ali made changes -
        Assignee Azmat Ali [ aali ] Bassem Sabbagh [ bsabbagh ]
        Hide
        Azmat Ali added a comment -

        Partial licenses are parsing in XML on prod, only first sheet licenses are importing, this kind issue was occurred once before & this is repeated again on production.

        kindly get check the issue & resolve the same.

        @ Bassem, please assign someone to get check the same.

        Show
        Azmat Ali added a comment - Partial licenses are parsing in XML on prod, only first sheet licenses are importing, this kind issue was occurred once before & this is repeated again on production. kindly get check the issue & resolve the same. @ Bassem, please assign someone to get check the same.
        Bassem Sabbagh made changes -
        Assignee Bassem Sabbagh [ bsabbagh ] Dharmendra Patel [ dpatel ]
        Hide
        Bassem Sabbagh added a comment -

        Assigned to Dhamendra to define the Wl

        Show
        Bassem Sabbagh added a comment - Assigned to Dhamendra to define the Wl
        Dharmendra Patel logged work - 11/Mar/25 12:00 AM - edited
        • Time Spent:
          1 day
           

          work in progress.

        Hide
        Dharmendra Patel added a comment -

        dev WL- 1.5 days

        Show
        Dharmendra Patel added a comment - dev WL- 1.5 days
        Bassem Sabbagh made changes -
        Status To Do [ 10001 ] In Progress [ 3 ]
        Assignee Dharmendra Patel [ dpatel ] Bassem Sabbagh [ bsabbagh ]
        Bassem Sabbagh made changes -
        Assignee Bassem Sabbagh [ bsabbagh ] Dharmendra Patel [ dpatel ]
        Hide
        Bassem Sabbagh added a comment -

        to be delivered on 12-3 first half

        Show
        Bassem Sabbagh added a comment - to be delivered on 12-3 first half
        Hide
        Dharmendra Patel added a comment -

        Dear @Khaled Khalil sir,

        kindly please release a patch for a commit (ZAIN_KSA).

        Dear @ABHINAV PARASHAR sir, after release deploy this on UAT server and prod and generate an XML and share the AI logs..

        connector name :-
        <import resource="huawei/transmission/huawei-trasmission-spring-config.xml" />

        Show
        Dharmendra Patel added a comment - Dear @Khaled Khalil sir, kindly please release a patch for a commit (ZAIN_KSA). Dear @ABHINAV PARASHAR sir, after release deploy this on UAT server and prod and generate an XML and share the AI logs.. connector name :- <import resource="huawei/transmission/huawei-trasmission-spring-config.xml" />
        Dharmendra Patel logged work - 12/Mar/25 12:00 AM
        • Time Spent:
          3 hours
           

          add logs in code.

        Hide
        Bassem Sabbagh added a comment -

        still under troubleshooting as the issue not reproducible on local laptop

        Show
        Bassem Sabbagh added a comment - still under troubleshooting as the issue not reproducible on local laptop
        Hide
        Dharmendra Patel added a comment -

        Dear @Khaled Khalil sir,

        I did commit some changes. kindly please release a patch for commit(ZAIN_KSA).

        Dear @ABHINAV PARASHAR sir, after release deploy this on prod and generate an XML and share the AI logs..

        Show
        Dharmendra Patel added a comment - Dear @Khaled Khalil sir, I did commit some changes. kindly please release a patch for commit(ZAIN_KSA). Dear @ABHINAV PARASHAR sir, after release deploy this on prod and generate an XML and share the AI logs..
        Dharmendra Patel made changes -
        Remaining Estimate 0 minutes [ 0 ]
        Time Spent 1 day [ 28800 ]
        Worklog Id 262351 [ 262351 ]
        Dharmendra Patel made changes -
        Baseline Start 2025-03-05 24:00 (set baseline based of initial work logging)
        Baseline End 2025-03-05 24:00 (set baseline based of initial work logging)
        Dharmendra Patel made changes -
        Worklog Id 262351 [ 262351 ]
        Dharmendra Patel made changes -
        Time Spent 1 day [ 28800 ] 1 day, 3 hours [ 39600 ]
        Worklog Id 262352 [ 262352 ]
        Dharmendra Patel logged work - 17/Mar/25 12:00 AM
        • Time Spent:
          3 hours
           

          dear Azmat Ali sir, i have checked in prod xml all IDU license data is coming fine. kindly please check from your end. if you get any issue kindly please let me know.

        Hide
        Dharmendra Patel added a comment -

        dear Azmat Ali sir, i have checked in prod xml all IDU license data is coming fine. kindly please check from your end. if you get any issue kindly please let me know.

        Show
        Dharmendra Patel added a comment - dear Azmat Ali sir, i have checked in prod xml all IDU license data is coming fine. kindly please check from your end. if you get any issue kindly please let me know.
        Dharmendra Patel made changes -
        Assignee Dharmendra Patel [ dpatel ] Azmat Ali [ aali ]
        Hide
        Azmat Ali added a comment -

        IDU licenses are ok on PROD now, but WDM licenses are missing due to the dump missing on destination folder, will confirm WDM licenses once node are available on destination path.

        Show
        Azmat Ali added a comment - IDU licenses are ok on PROD now, but WDM licenses are missing due to the dump missing on destination folder, will confirm WDM licenses once node are available on destination path.
        Dharmendra Patel made changes -
        Time Spent 1 day, 3 hours [ 39600 ] 1 day, 6 hours [ 50400 ]
        Worklog Id 262634 [ 262634 ]
        Azmat Ali made changes -
        Status In Progress [ 3 ] Done [ 10000 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        To Do To Do In Progress In Progress
        5d 21h 18m 1 Bassem Sabbagh 11/Mar/25 6:40 AM
        In Progress In Progress Done Done
        6d 22h 21m 1 Azmat Ali 18/Mar/25 5:02 AM
        Subversion JIRA

        Links Hierarchy

         Documentation

        Invalid license: EXPIRED

          People

          • Assignee:
            Azmat Ali
            Reporter:
            Azmat Ali
          • Votes:
            0 Vote for this issue
            Watchers:
            4 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 day, 6 hours
              1d 6h

                Drag and Drop