Details

    • Customer:
      Ooreedo Tunisia

      Description

      Click to add description

        Activity

        Hide
        Indrasan Yadav added a comment -

        1st draft was prepared and discussed with Bassem where need to consider it across all domain not only for RAN with some changes.

        Show
        Indrasan Yadav added a comment - 1st draft was prepared and discussed with Bassem where need to consider it across all domain not only for RAN with some changes.
        Hide
        Indrasan Yadav added a comment -

        2nd draft was shared to Bassem over an email on 02-04-2026 as per discussion done in last call, he will review & confirmed.

        Show
        Indrasan Yadav added a comment - 2nd draft was shared to Bassem over an email on 02-04-2026 as per discussion done in last call, he will review & confirmed.
        Hide
        Indrasan Yadav added a comment -

        On 07-04-2026, we discussed (Including Bassem, Azmat & Divya) the shared draft there is some modification needed.

        Show
        Indrasan Yadav added a comment - On 07-04-2026, we discussed (Including Bassem, Azmat & Divya) the shared draft there is some modification needed.

          People

          • Assignee:
            Indrasan Yadav
            Reporter:
            Indrasan Yadav
          • Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 week, 2 days, 6 hours, 30 minutes
              1w 2d 6h 30m

                Drag and Drop