Site DB Report Required for reference Attributes
(LS-646)
|
|
| Status: | Cancelled |
| Project: | L3 Support |
| Component/s: | NEP |
| Affects Version/s: | None |
| Fix Version/s: | None |
| Type: | Technical task | Priority: | Normal |
| Reporter: | Aurobinda Panda | Assignee: | Khaled Khalil |
| Resolution: | Fixed | Votes: | 0 |
| Labels: | MS_OT | ||
| Remaining Estimate: | Not Specified | ||
| Time Spent: | Not Specified | ||
| Original Estimate: | Not Specified | ||
| Customer: |
OMAN-Tel
|
| Planned Start: | |
| Planned End: | |
| Complexity: | Medium |
| Severity: | Major |
| Product: | NEP |
| REQUESTER: | EXTERNAL |
| Actual Start: | |
| Date of Baselining: |
| Description |
|
It is required to prepare a report for the attributes mentioned in the document for Sites. The attributes are need to be in the same sequence as mentioned in the table. The reference Reports in NEP are Sites Report & Additional Information report for Site. Attribute Details are available in document attached. |