[ZKU-86] Huawei Core_Dumps , XML and NEP data Validation Created: 11/Nov/24  Updated: 09/Apr/25  Due: 30/Nov/24

Status: Done
Project: Zain KSA upgradation
Component/s: None
Affects Version/s: None
Fix Version/s: None

Type: Task Priority: Urgent
Reporter: Ahad Siddiqui Assignee: Ahad Siddiqui
Resolution: Unresolved Votes: 0
Labels: AI_All_incidents, ZAINKSAAUDIT, ZAINKSAUAT
Remaining Estimate: 0 minutes
Time Spent: 5 hours
Original Estimate: Not Specified

Issue Links:
Blocks
blocks ZKU-122 DUMPS AND INVENTORY VALIDATION_PARENT Done
is blocked by LS-23 IPCLK ELEMENTS NOT INCLUDED IN SITECO... Closed
is blocked by LS-25 CABINET REPORT EMPTY_MGW Closed
is blocked by ZKU-147 HUAWEI CORE XML VALIDATION Done
is blocked by ZKU-170 INVENTORY DUMPS VALIDATION_HUAWEI CORE Done
Customer:
Zain KSA 3.X
Planned Start:
Planned End:
Actual Start:
Date of Baselining:

 Comments   
Comment by Ahad Siddiqui [ 11/Nov/24 ]

WL= 2 mday

Comment by Ahad Siddiqui [ 13/Nov/24 ]

More than 60% of the dumps available on the CORE dumps folder are related to virtual nodes and they doesn’t contain any inventory except the node name, node type and software version.
Asked Hassan for his suggestion.

Comment by Ahad Siddiqui [ 14/Nov/24 ]

Total core dumps =193

Comment by Ahad Siddiqui [ 21/Nov/24 ]

Huawei Core inventory dumps are ok

Comment by Ahad Siddiqui [ 12/Feb/25 ]

Huawei XML validation was done and code was committed , i am giving below changes after some confirmation from KSA team.

Comment by Ahad Siddiqui [ 12/Feb/25 ]

@sandya : for NEType="MGW" , there is a board with BoardName="POWER_SWITCH" for that Subrack is mentioned as 40 but in subrack class there is no subrack with SubrackNo as 40 , so KSA confirms to take create subrack.

so for NEType="MGW" with valid subrack class , please also create a subrack with index 40 and shelf type as Dummy_40

<ROW CabinetNo="0" SubrackNo="40" SlotNo="220" SlotPos="0" SubSlotNo="-1" InventoryUnitId="220" ModuleNo="-1" BoardName="POWER_SWITCH"

Comment by Bassem Sabbagh [ 13/Feb/25 ]

WL to be added by sandya

Comment by Sandya Sharma [ 14/Feb/25 ]

WL is half day.

Comment by Bassem Sabbagh [ 14/Feb/25 ]

to be delivered by 14-2

Comment by Sandya Sharma [ 17/Feb/25 ]

delivered by today.

Comment by Sandya Sharma [ 17/Feb/25 ]

XML shared.

Comment by Ahad Siddiqui [ 19/Feb/25 ]

Hi Sandya,

As discussed the shelf type and model is coming wrong, please correct it.

Comment by Sandya Sharma [ 19/Feb/25 ]

will fix and share the xml by today.

Comment by Sandya Sharma [ 20/Feb/25 ]

XML shared.

Generated at Wed Apr 15 16:26:56 EEST 2026 using JIRA 6.1.4#6159-sha1:44eaedef2e4a625c6c7183698b2468d4719c20dc.