Details
-
Type:
Task
-
Status:
In Progress
(View Workflow)
-
Priority:
Normal
-
Resolution: Unresolved
-
Affects Version/s: None
-
Fix Version/s: None
-
Component/s: UCMDB
-
Customer:Mobinets
Description
Display LAG Report
Display Service Report
Display Bridge Domain Interface Report
Display Virtual Interface System Report
Display Virtual Ethernet Report
Display Virtual Interface Ring Report
Display Virtual Interface MP Group Report
Display Virtual Interface IP Trunk Report
Display Virtual Interface VLAN Report
Display Virtual Interface Loopback Report
Display Virtual Interface Tunnel Report
Global Mp Group Report
Transceiver Details Report
Device Management Report
CPOS Trunk Report
BGP Route Reflectors Report
Power Budgeting Report
GIS Layer.
FO Cable Import
Coax Cable Import
Copper Cable Import
Xdsl Box Import
Xdsl Splitter Import
Fiber Distribution Frame Import
permission on each node
Route permission in each node
Activity
- All
- Comments
- Work Log
- History
- Activity
- Links Hierarchy
- Transitions
- Trace
-
- Time Spent:
- 1 day
-
Stop working on the VrfView Report and focus on the Signal Flow Report using the Generic View.
-
- Time Spent:
- 1 day
-
continue working on the Signal Flow Report.
Start working on the Transceiver Details Report.
-
- Time Spent:
- 1 day
-
Continue working on the Transceiver Details, retrieving all columns except the Transceiver State.
-
- Time Spent:
- 1 day
-
working on the Redundancy Report.
-
- Time Spent:
- 1 day
-
finishing the Global Mp Group, Transceiver Details Reports.
check the data in the Device Management Report.
-
- Time Spent:
- 1 day
-
finishing the Device Management, Cpos Trunk Reports.
finishing the BGP Route Reflectors without testing.
-
- Time Spent:
- 1 day
-
Working on the Site Mileatones Report.
-
- Time Spent:
- 1 day
-
working on the Power Budgeting Report.
-
- Time Spent:
- 1 day
-
trying to fix the Power Budgeting Report.
-
- Time Spent:
- 1 day
-
stop working on the Power Budgeting Report.
Start working on the permission related to the Ucmdb project.
-
- Time Spent:
- 1 day
-
Migrate user action from NEP.
apply the "RMI" and the "REST" on the UCMDB.
adding the data related to the UCMDB on the ua.
adding the data on the interceptor and on a csv file.
-
- Time Spent:
- 1 day
-
continue adding needed permission in each node and adding it on the user admin data.base
-
- Time Spent:
- 1 day
-
working on the permission.
-
- Time Spent:
- 1 day
-
continue working on the permission.
fixing an error occured on the 2G Cell and the 3G Cell.
-
- Time Spent:
- 1 day
-
Complete the work on the permissions and create a Word document that explains how to define permissions and log them in the database.
-
- Time Spent:
- 1 day
-
finishing the Power Budgeting Report.
working on generic function to use permission.
-
- Time Spent:
- 1 day
-
continue working on defined the permission in generic code.
-
- Time Spent:
- 1 day
-
continue working on defining the permission in generic mode.
-
- Time Spent:
- 1 day
-
continue working on defining the permission as Generic.
-
- Time Spent:
- 1 day
-
defining some generic function to test the Permission in each item.
-
- Time Spent:
- 1 day
-
finishing the login with another user.
defining some permission and testing it.
-
- Time Spent:
- 1 day
-
finishing the permission without the IpConfiguration V4 and the IP Configuration V6.
-
- Time Spent:
- 1 day
-
Completed permission definition and am now working on IP Address Management in the generic code
-
- Time Spent:
- 1 day
-
finish all the permissions.
use it successfully on the view.
-
- Time Spent:
- 1 day
-
working on the used VLAN in the Ethernet Switch.
checking an error on the Bts in the 2G tab.
-
- Time Spent:
- 1 day
-
finishing the Used Vlan Report.
-
- Time Spent:
- 1 day
-
fix something on the permission.
working on the VLAN view.
finishing the reserved VLAN.
-
- Time Spent:
- 1 day
-
Working on the masks form and report.
-
- Time Spent:
- 1 day
-
fix something related to the GsmCell, ThreeGCell,
finish the form in the Mask.
-
- Time Spent:
- 1 day
-
finishing the mask : edit, delete, create.
-
- Time Spent:
- 1 day
-
working on the Splice Modules.
finishing the form and test the edit case.
-
- Time Spent:
- 1 day
-
finishing the splice module and finish also the splice module customizable configuration, splice module manage document, Osp Pathway customizable configuration, Osp Pathway manage document.
-
- Time Spent:
- 1 day
-
fix the TwoGCell ThreeGCell, Coax Cable Customizable Configuration, Coax Cable Manage Document, Copper Cable Customizable Configuration, Copper Cable Manage Document.
-
- Time Spent:
- 1 day
-
finish the generic related to the Used Vlan and reserved Vlan.
work on fixing the route on the permissions,
-
- Time Spent:
- 1 day
-
continue defining default route of permissions.
-
- Time Spent:
- 1 day
-
working on the Permission related to the Generic Crud Entity View.
Finishing the Permission related to the Generic View.
-
- Time Spent:
- 1 day
-
finishing the permissions related to the route.
use the delete function in the Internal Link.
finishing the GIs layer.
-
- Time Spent:
- 1 day
-
fix the image on the GIS Layer in the SRan Controller and the IT/Misc.
working on the FOCable Csv Import.
-
- Time Spent:
- 1 day
-
working on the FO Cable Import, Coax Cable Import, Xdsl Box Import, XDSL Splitter Import.
-
- Time Spent:
- 1 day
-
fix some issue on the import csv.
working on the error handler.
-
- Time Spent:
- 1 day
-
finish handling the error import row case.
-
- Time Spent:
- 1 day
-
fix the issue in the FO Cable in Csv Import.
continue working on the Coax Cable Csv Import.
-
- Time Spent:
- 1 day
-
finishing the Coax Cabele Import, xdsl splitter Import, xdsl box Import.
-
- Time Spent:
- 1 day
-
add the permission related to the Customizable Configuration in the Catalog.
finish the configuration file related to the catalog.
-
- Time Spent:
- 1 day
-
Working on the FiberDistributionFrameServerCsvHandler to handle CSV-related operations efficiently.
Updating the UI URL to successfully connect to the new User Admin service.
-
- Time Spent:
- 1 day
-
finishing the Fiber Distribution Frame Import and the Copper Cable Import.
-
- Time Spent:
- 1 day
-
Complete the UI to display the non-imported items in a dialog after the import process.
-
- Time Spent:
- 1 day
-
Finish the MDU import and fix the CsvAttributeProvider to follow the NEP logic
-
- Time Spent:
- 1 day
-
fix the UI in the UA project.
fix two bug related to the Catalog project.
-
- Time Spent:
- 1 day
-
Complete the Idu Import in the new case.
try to fix it in the edit case.
-
- Time Spent:
- 1 day
-
eliminate the white spaces in each Tab.
fix the size while zooming.
-
- Time Spent:
- 1 day
-
fix the logout case in the Catalog.
test the login and successfully work
-
- Time Spent:
- 4 hours
-
start working on the Sran Controller Csv Import.
-
- Time Spent:
- 1 day
-
continue working on the SRan Controller.
-
- Time Spent:
- 1 day
-
working on the Bug related to the Catalog.
-
- Time Spent:
- 1 day
-
Converting the 'Customizable Configuration' section in the Catalog to work like it does in UCMDB.
-
- Time Spent:
- 1 day
-
Working on converting all popups used in the Catalog to tabs, similar to the implementation in the UCMDB."
-
- Time Spent:
- 1 day
-
Fix the logic that enables tab functionality similar to UCMDB, specifically for BtsType.
-
- Time Spent:
- 1 day
-
finishing the NodeBType, ENodeBType, RanBsType, BscType.
-
- Time Spent:
- 1 day
-
I've committed the code that includes the icons in the TreeGrid, along with the fix for the bug in the Core Element Type.
still working on converting pop-up to tabs.
-
- Time Spent:
- 1 day
-
continue working on transforming Crud Dialog to popup.
-
- Time Spent:
- 1 day
-
Converting some types in the Catalog from CRUD to tab view.
-
- Time Spent:
- 1 day
-
Convert 8 types from Dialog to tabs.
-
- Time Spent:
- 1 day
-
Continued converting Dialog components to Tab-based UI.
Completed conversion for 13 types.
-
- Time Spent:
- 4 hours
-
continued working on refactoring from crud to tab.
-
- Time Spent:
- 1 day
-
continued working on the tabs.
Finished 10 types.
-
- Time Spent:
- 1 day
-
continued working on tabs.
-
- Time Spent:
- 1 day
-
finished All type without the BoardTypePage.
-
- Time Spent:
- 1 day
-
finish all type on catalog and start testing it.
fix an error related to the UA project.
-
- Time Spent:
- 1 day
-
test the tabs to avoid any problem
-
- Time Spent:
- 1 day
-
continued in testing.
-
- Time Spent:
- 1 day
-
tested the Cabinet Type and the Shelf Type.
-
- Time Spent:
- 1 day
-
Testing the Board Type
-
- Time Spent:
- 1 day
-
finished testing the BoardType.
-
- Time Spent:
- 1 day
-
finished the copy Board, designer, physical Configuration test.
-
- Time Spent:
- 1 day
-
I would like to inform you that I’ve committed the code related to the "Kill Session" feature in the UA project, and marked the corresponding Jira ticket as "To Be Released".
Additionally, I implemented a Tree Grid for each catalog item that requires multiple Type Categories. However, please note that the filtering functionality is not working yet, and I'm still working on resolving it.
-
- Time Spent:
- 1 day
-
fix the filter in the TreeGrid Case in each type.
-
- Time Spent:
- 1 day
-
trying to fix the route after closing the tabs that contains Type Category
-
- Time Spent:
- 4 hours
-
Fixed the route in the edit case for each type that contains a Type Category
-
- Time Spent:
- 1 day
-
close 3 thickets Jira related to the bug
continue working on the New Case in the Type Catagory.
-
- Time Spent:
- 1 day
-
fix some bugs related to the Catalog Project.
-
- Time Spent:
- 4 hours
-
fix the Customizable Configuration
Report.
Trying to fix the filter after clicking in each Category.
-
- Time Spent:
- 1 day
-
fix the route on the Core Element Type using another method.
-
- Time Spent:
- 1 day
-
Reduce the white space between the save in the generic code.
Trying to fix the filter on the Customizable Configuration.
-
- Time Spent:
- 1 day
-
Fixed the filter in the Customizable Configuration and added the new permissions.
Working on the save.
-
- Time Spent:
- 1 day
-
fix the save on the Customizable Configuration.
-
- Time Spent:
- 1 day
-
fix the errors in the Customizable Configuration.
fixed the selected tabs in edti/ new case.
-
- Time Spent:
- 1 day
-
Fixed a tab bug in the UCMDB and Catalog projects.
Added a new button and tested the save functionality for new cases in the Element Additional Info section of the UCMDB project.
-
- Time Spent:
- 1 day
-
Fixing the issue related to the Element Additional Info.
-
- Time Spent:
- 1 day
-
Working on the Vlan Import case.
-
- Time Spent:
- 1 day
-
Working on the Reserved Vlan import.
-
- Time Spent:
- 1 day
-
working about fixing the bug related tp the Ucmdb.
working on the Service Instance Interface csv Import.
-
- Time Spent:
- 1 day
-
fix all bugs assigned to me.
Continue working on the Csv Import.
-
- Time Spent:
- 1 day
-
Continue working on fixing bugs related to the Service Instance Interface.
-
- Time Spent:
- 1 day
-
Continue working on implementing the Service Instance Interface csv import.
-
- Time Spent:
- 1 day
-
Start working on the Element Additional Info Csv Import.
-
- Time Spent:
- 1 day
-
continued working on the Additional Info Csv Import.
-
- Time Spent:
- 1 day
-
Continued working on the Additional Info Csv Import.
-
- Time Spent:
- 1 day
-
continued fixing the errors occured in the Version Service and the Node Interface Service
-
- Time Spent:
- 1 day
-
fixing the errors occured.
working on testing the csv import.
-
- Time Spent:
- 1 day
-
Finished successfully the VLAN and the reserved VLAN.
-
- Time Spent:
- 1 day
-
testing the Element Additional Info, Sub Interface, Service Instance Interface.
-
- Time Spent:
- 1 day
-
Tested the Element Additional Information CSV Import.
-
- Time Spent:
- 1 day
-
Finished the region CSV import.
-
- Time Spent:
- 1 day
-
Finished the Zone Csv Import.
-
- Time Spent:
- 1 day
-
working on the CCInformation Csv Import.
-
- Time Spent:
- 1 day
-
Finished the CCInformation CSV Handler.
Start working on the Configured Ring CSV Handler.
-
- Time Spent:
- 1 day
-
Finished the configured ring CSV import.
Start working on the naming rules (Csv Import, build form, saving actions).
-
- Time Spent:
- 1 day
-
Continue working on the Naming Rules.
-
- Time Spent:
- 1 day
-
Continue working on the naming rules.
Finished the Grid.
Finished the Import without testing.
-
- Time Spent:
- 1 day
-
Continue working on the Naming Rules.
-
- Time Spent:
- 1 day
-
working on the global save.
-
- Time Spent:
- 1 day
-
finished the Naming rules and commited the code.
-
- Time Spent:
- 1 day
-
finished the View and the Delete function in the Customized Configuration Templates.
Continue working on the save action.
-
- Time Spent:
- 1 day
-
Finished the form of the Edit case in the Element Customized Attribute.
Working on the save action.
-
- Time Spent:
- 1 day
-
Working on the save action.
-
- Time Spent:
- 1 day
-
trying to fix the defaultValue on the save case.
-
- Time Spent:
- 1 day
-
Finished the customized attribute template save action.
Start working on the System Preferences.
-
- Time Spent:
- 1 day
-
Finished the System Preferences form and save without testing.
-
- Time Spent:
- 1 day
-
Finished the save action on the System Preferences.
-
- Time Spent:
- 1 day
-
Finished the Passive Element Status with create, edit and delete.
-
- Time Spent:
- 1 day
-
Completed the estimation between June 1st and now.
Working on the Port Connection Csv Import,
-
- Time Spent:
- 1 day
-
fixed the Port Connection and start working on the SRan Controller CSV import.
-
- Time Spent:
- 1 day
-
Continue working on the SRan Controller Csv Import.
-
- Time Spent:
- 1 day
-
Finished the SRan Controller Csv Import.
-
- Time Spent:
- 1 day
-
working on the Permission and give a success result.
-
- Time Spent:
- 1 day
-
working on the Asset History.