Details

    • Customer:
      OMAN-Tel
    • Reason:
      Missing requirements
    • Severity:
      Minor
    • Classification:
      CR

      Description

      It is required to add the columns Insert Date & Updated Date for every Report.
      List of Reports will be shared further.

        Activity

        Aurobinda Panda logged work - 07/Oct/24 12:00 AM
        • Time Spent:
          1 hour
           

          Reports checked in NEP. Ticket opened & shared with Dev.

        Aurobinda Panda made changes -
        Field Original Value New Value
        Gantt Options Milestone (set to milestone: having a due date but zero effort)
        Planned Start 2024-12-31 24:00 (milestone: set planned start date to due date)
        Planned End 2024-12-31 24:00 (milestone: set planned end date to due date)
        Aurobinda Panda made changes -
        Assignee Bassem Sabbagh [ bsabbagh ] Aurobinda Panda [ apanda ]
        Aurobinda Panda made changes -
        Component/s Generic [ 12401 ]
        Aurobinda Panda made changes -
        Status Opened [ 1 ] Registered [ 10304 ]
        Aurobinda Panda made changes -
        Remaining Estimate 0 minutes [ 0 ]
        Time Spent 1 hour [ 3600 ]
        Worklog Id 255725 [ 255725 ]
        Aurobinda Panda made changes -
        Baseline Start 2024-12-31 24:00 (set baseline based of initial work logging)
        Baseline End 2024-12-31 24:00 (set baseline based of initial work logging)
        Aurobinda Panda made changes -
        Status Registered [ 10304 ] Customer Contacted [ 10305 ]
        Hide
        Aurobinda Panda added a comment -

        need to add the Insert Date & Updated Date for the reports in NEP where it is missing.

        List of Reports are below
        Report name Report Type
        MGWs Report Network Elements
        MSSs Report
        Clock Report
        Transmission Links Transmission Links
        Internal Links
        Inventory Report Physical Configuration

        Show
        Aurobinda Panda added a comment - need to add the Insert Date & Updated Date for the reports in NEP where it is missing. List of Reports are below Report name Report Type MGWs Report Network Elements MSSs Report Clock Report Transmission Links Transmission Links Internal Links Inventory Report Physical Configuration
        Aurobinda Panda made changes -
        Status Customer Contacted [ 10305 ] L1 In Progress [ 10200 ]
        Hide
        Aurobinda Panda added a comment -

        Adding below Reports

        Lambda services report
        Lambda Route Report
        Lambda Report
        Signal Flow

        Path
        Reporting--> WDM

        Show
        Aurobinda Panda added a comment - Adding below Reports Lambda services report Lambda Route Report Lambda Report Signal Flow Path Reporting--> WDM
        Aurobinda Panda logged work - 10/Oct/24 12:00 AM
        • Time Spent:
          1 hour
           

          Reports checked & shared with Dev for implementation.

        Aurobinda Panda made changes -
        Assignee Aurobinda Panda [ apanda ] Khaled Khalil [ kkhalil ]
        Aurobinda Panda made changes -
        Status L1 In Progress [ 10200 ] L3 In Progress [ 10202 ]
        Hide
        Aurobinda Panda added a comment - - edited

        Adding few more reports

        Sites report.....................Reporting-> Site-> Sites Report
        CC Information...............Reporting-> Transmission Elements-> CC Information
        VLAN report...................Reporting-> IP/MPLS->VLAN

        Show
        Aurobinda Panda added a comment - - edited Adding few more reports Sites report.....................Reporting- > Site -> Sites Report CC Information...............Reporting- > Transmission Elements -> CC Information VLAN report...................Reporting- > IP/MPLS ->VLAN
        Aurobinda Panda made changes -
        Time Spent 1 hour [ 3600 ] 2 hours [ 7200 ]
        Worklog Id 255893 [ 255893 ]
        Khaled Khalil made changes -
        Assignee Khaled Khalil [ kkhalil ] Nazih Ghadieh [ nghadieh ]
        Khaled Khalil made changes -
        Summary Latest updated date” attribute in all NEP reports Latest updated date" attribute in all NEP reports
        Classification CR [ 13201 ]
        Date of Baselining 07/Oct/24 11:52 AM 07/Oct/24 11:52 AM
        Hassan Abdine made changes -
        Project Mobinets_Support [ 10405 ] L3 Support [ 14300 ]
        Key MOB-7021 LS-37
        Workflow Support_WF_ABIR [ 178204 ] Mobinets_Dev_WF_J4.4 [ 179204 ]
        Status L3 In Progress [ 10202 ] Implementation in progress [ 10016 ]
        Reporter Aurobinda Panda [ apanda ] Abir Messaikeh [ amessaikeh ]
        Issue Type Feature [ 10101 ] CR [ 10900 ]
        Assignee Nazih Ghadieh [ nghadieh ]
        Component/s Generic [ 12401 ]
        Hassan Abdine made changes -
        Reporter Abir Messaikeh [ amessaikeh ] Aurobinda Panda [ apanda ]
        Khaled Khalil made changes -
        Assignee Khaled Khalil [ kkhalil ]
        Khaled Khalil made changes -
        Status Implementation in progress [ 10016 ] Dev Paused [ 10017 ]
        Hassan Abdine made changes -
        Status Dev Paused [ 10017 ] Implementation in progress [ 10016 ]
        Hassan Abdine made changes -
        Status Implementation in progress [ 10016 ] Pending Requirements [ 10300 ]
        Hassan Abdine made changes -
        Status Pending Requirements [ 10300 ] Pending [ 10101 ]
        Hassan Abdine made changes -
        Status Pending [ 10101 ] Pending Requirements [ 10300 ]
        Hassan Abdine made changes -
        Status Pending Requirements [ 10300 ] Pending Design Session [ 10112 ]
        Hassan Abdine made changes -
        Status Pending Design Session [ 10112 ] Dev Scheduled [ 10014 ]
        Khaled Khalil made changes -
        Status Dev Scheduled [ 10014 ] Pending Requirements [ 10300 ]
        Khaled Khalil made changes -
        Status Pending Requirements [ 10300 ] Pending Design Session [ 10112 ]
        Hide
        Aurobinda Panda added a comment -

        Any update?

        Show
        Aurobinda Panda added a comment - Any update?
        Hide
        Khaled Khalil added a comment -

        WL 2 to 3 mdays

        Show
        Khaled Khalil added a comment - WL 2 to 3 mdays
        Abir Messaikeh made changes -
        Component/s NEP [ 16200 ]
        Hide
        Aurobinda Panda added a comment -

        Dear @Khaled khalil
        I have reviewed the Implementation details for LS-493.

        It is found OK.

        So please proceed to include the other reports mentioned in this report.

        This is required for OmanTel project.

        Show
        Aurobinda Panda added a comment - Dear @Khaled khalil I have reviewed the Implementation details for LS-493 . It is found OK. So please proceed to include the other reports mentioned in this report. This is required for OmanTel project.
        Abir Messaikeh made changes -
        Status Pending Design Session [ 10112 ] Pending Requirements [ 10300 ]
        Abir Messaikeh made changes -
        Status Pending Requirements [ 10300 ] Pending Design Session [ 10112 ]
        Salem Dannawi logged work - 16/Oct/25 12:00 AM
        • Time Spent:
          30 minutes
           

          check the reports in NEP prod

        Abir Messaikeh made changes -
        Status Pending Design Session [ 10112 ] Pending Requirements [ 10300 ]
        Abir Messaikeh made changes -
        Status Pending Requirements [ 10300 ] Pending [ 10101 ]
        Abir Messaikeh made changes -
        Status Pending [ 10101 ] Pending Requirements [ 10300 ]
        Abir Messaikeh made changes -
        Status Pending Requirements [ 10300 ] Pending Design Session [ 10112 ]
        Abir Messaikeh made changes -
        Status Pending Design Session [ 10112 ] Pending Requirements [ 10300 ]
        Reason Missing requirements [ 10401 ]
        Abir Messaikeh made changes -
        Status Pending Requirements [ 10300 ] Pending Design Session [ 10112 ]
        Hide
        Abir Messaikeh added a comment - - edited

        the attributes of date are still required for below reports

        Report name Report Type
        MGWs Report Network Elements
        MSSs Report
        Clock Report
        Transmission Links Transmission Links
        Internal Links
        Inventory Report Physical Configuration
        Lambda services report
        Lambda Route Report
        Lambda Report
        Signal Flow
        CC Information...............Reporting- CC Information

        Show
        Abir Messaikeh added a comment - - edited the attributes of date are still required for below reports Report name Report Type MGWs Report Network Elements MSSs Report Clock Report Transmission Links Transmission Links Internal Links Inventory Report Physical Configuration Lambda services report Lambda Route Report Lambda Report Signal Flow CC Information...............Reporting- CC Information
        Abir Messaikeh made changes -
        Issue Type CR [ 10900 ] Bug [ 1 ]
        Workflow Mobinets_Dev_WF_J4.4 [ 179204 ] Mobinets_Dev_BugWF_J4.4 [ 196205 ]
        Status Pending Design Session [ 10112 ] Open Bug [ 10108 ]
        Abir Messaikeh made changes -
        Issue Type Bug [ 1 ] CR [ 10900 ]
        Workflow Mobinets_Dev_BugWF_J4.4 [ 196205 ] Mobinets_Dev_WF_J4.4 [ 196206 ]
        Status Open Bug [ 10108 ] Opened [ 1 ]
        Abir Messaikeh made changes -
        Status Opened [ 1 ] Pending Requirements [ 10300 ]
        Priority Deferred [ 10000 ]
        Abir Messaikeh made changes -
        Status Pending Requirements [ 10300 ] Pending Design Session [ 10112 ]
        Abir Messaikeh made changes -
        Priority Deferred [ 10000 ] Normal [ 10002 ]
        Abir Messaikeh made changes -
        Issue Type CR [ 10900 ] Bug [ 1 ]
        Workflow Mobinets_Dev_WF_J4.4 [ 196206 ] Mobinets_Dev_BugWF_J4.4 [ 196208 ]
        Status Pending Design Session [ 10112 ] Open Bug [ 10108 ]
        Abir Messaikeh made changes -
        Issue Type Bug [ 1 ] CR [ 10900 ]
        Workflow Mobinets_Dev_BugWF_J4.4 [ 196208 ] Mobinets_Dev_WF_J4.4 [ 196209 ]
        Status Open Bug [ 10108 ] Opened [ 1 ]
        Salem Dannawi made changes -
        Time Spent 2 hours [ 7200 ] 2 hours, 30 minutes [ 9000 ]
        Worklog Id 280666 [ 280666 ]
        Aurobinda Panda logged work - 24/Oct/25 12:00 AM
        • Time Spent:
          30 minutes
           

          reviewed the report where last import date need to be added.

        Aurobinda Panda made changes -
        Time Spent 2 hours, 30 minutes [ 9000 ] 3 hours [ 10800 ]
        Worklog Id 281452 [ 281452 ]
        Marwan Kanaan logged work - 11/Dec/25 12:00 AM
        • Time Spent:
          5 hours
           

          added the dates details for the reports in the comment

        Marwan Kanaan made changes -
        Assignee Khaled Khalil [ kkhalil ] Marwan Kanaan [ mkanaan ]
        Abir Messaikeh made changes -
        Status Opened [ 1 ] Pending Requirements [ 10300 ]
        Abir Messaikeh made changes -
        Status Pending Requirements [ 10300 ] Pending Design Session [ 10112 ]
        Assignee Marwan Kanaan [ mkanaan ] Khaled Khalil [ kkhalil ]
        Marwan Kanaan made changes -
        Status Pending Design Session [ 10112 ] Dev Scheduled [ 10014 ]
        Marwan Kanaan made changes -
        Assignee Khaled Khalil [ kkhalil ] Marwan Kanaan [ mkanaan ]
        Marwan Kanaan made changes -
        Status Dev Scheduled [ 10014 ] Implementation in progress [ 10016 ]
        Marwan Kanaan made changes -
        Status Implementation in progress [ 10016 ] To Be Released [ 10400 ]
        Hide
        Marwan Kanaan added a comment -

        Dear @Aurobinda Panda,

        Kindly note that the dates details have been added for the above reports. Please apply patch 3.7.0.1386 and verify the changes.
        Best Regards,

        Marwan Kanaan I Software Developer

        Show
        Marwan Kanaan added a comment - Dear @Aurobinda Panda, Kindly note that the dates details have been added for the above reports. Please apply patch 3.7.0.1386 and verify the changes. Best Regards, Marwan Kanaan I Software Developer
        Marwan Kanaan made changes -
        Time Spent 3 hours [ 10800 ] 1 day [ 28800 ]
        Worklog Id 285789 [ 285789 ]
        Khaled Khalil made changes -
        Status To Be Released [ 10400 ] Ready for QA [ 10023 ]
        Assignee Marwan Kanaan [ mkanaan ] Aurobinda Panda [ apanda ]
        Hide
        Aurobinda Panda added a comment -

        Dear @marwan,
        As checked all the above Reports are now having the Insert and update date. in staging platform

        Ticket is closed.

        Show
        Aurobinda Panda added a comment - Dear @marwan, As checked all the above Reports are now having the Insert and update date. in staging platform Ticket is closed.
        Aurobinda Panda made changes -
        Status Ready for QA [ 10023 ] QA In Progress [ 10015 ]
        Aurobinda Panda made changes -
        Status QA In Progress [ 10015 ] Closed [ 6 ]
        Resolution Fixed [ 1 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Opened Opened Registered Registered
        19s 1 Aurobinda Panda 07/Oct/24 6:53 AM
        Registered Registered Customer Contacted Customer Contacted
        22h 43m 1 Aurobinda Panda 08/Oct/24 5:36 AM
        Customer Contacted Customer Contacted L1 In Progress L1 In Progress
        41m 38s 1 Aurobinda Panda 08/Oct/24 6:18 AM
        L1 In Progress L1 In Progress L3 In Progress L3 In Progress
        1d 21h 57m 1 Aurobinda Panda 10/Oct/24 4:16 AM
        L3 In Progress L3 In Progress Implementation in progress Implementation in progress
        66d 10h 11m 1 Hassan Abdine 15/Dec/24 1:27 PM
        Implementation in progress Implementation in progress Dev Paused Dev Paused
        53m 35s 1 Khaled Khalil 15/Dec/24 2:21 PM
        Dev Paused Dev Paused Implementation in progress Implementation in progress
        2d 2h 56m 1 Hassan Abdine 17/Dec/24 5:18 PM
        Implementation in progress Implementation in progress Pending Requirements Pending Requirements
        13s 1 Hassan Abdine 17/Dec/24 5:18 PM
        Dev Scheduled Dev Scheduled Pending Requirements Pending Requirements
        1d 13h 39m 1 Khaled Khalil 19/Dec/24 6:59 AM
        Pending Requirements Pending Requirements Pending Pending
        12s 2 Abir Messaikeh 16/Oct/25 7:53 AM
        Pending Pending Pending Requirements Pending Requirements
        49s 2 Abir Messaikeh 16/Oct/25 7:53 AM
        Pending Design Session Pending Design Session Pending Requirements Pending Requirements
        300d 23h 54m 3 Abir Messaikeh 16/Oct/25 7:54 AM
        Pending Design Session Pending Design Session Open Bug Open Bug
        12m 20s 2 Abir Messaikeh 16/Oct/25 8:07 AM
        Open Bug Open Bug Opened Opened
        41s 2 Abir Messaikeh 16/Oct/25 8:07 AM
        Opened Opened Pending Requirements Pending Requirements
        56d 5h 46m 2 Abir Messaikeh 11/Dec/25 12:53 PM
        Pending Requirements Pending Requirements Pending Design Session Pending Design Session
        58s 7 Abir Messaikeh 11/Dec/25 12:53 PM
        Pending Design Session Pending Design Session Dev Scheduled Dev Scheduled
        1m 15s 2 Marwan Kanaan 11/Dec/25 12:54 PM
        Dev Scheduled Dev Scheduled Implementation in progress Implementation in progress
        3s 1 Marwan Kanaan 11/Dec/25 12:54 PM
        Implementation in progress Implementation in progress To Be Released To Be Released
        4s 1 Marwan Kanaan 11/Dec/25 12:54 PM
        To Be Released To Be Released Ready for QA Ready for QA
        22h 24m 1 Khaled Khalil 12/Dec/25 11:19 AM
        Ready for QA Ready for QA QA In Progress QA In Progress
        4d 38m 1 Aurobinda Panda 16/Dec/25 11:57 AM
        QA In Progress QA In Progress Closed Closed
        12s 1 Aurobinda Panda 16/Dec/25 11:58 AM
        Subversion JIRA

        Links Hierarchy

         Documentation

        Invalid license: EXPIRED

          People

          • Assignee:
            Aurobinda Panda
            Reporter:
            Aurobinda Panda
          • Votes:
            0 Vote for this issue
            Watchers:
            4 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 day
              1d

                Drag and Drop