Details

    • Customer:
      OMAN-Tel
    • Reason:
      Missing requirements
    • Severity:
      Minor
    • Classification:
      CR

      Description

      It is required to add the columns Insert Date & Updated Date for every Report.
      List of Reports will be shared further.

      There are no Sub-Tasks for this issue.

        Activity

        Hide
        Aurobinda Panda added a comment -

        need to add the Insert Date & Updated Date for the reports in NEP where it is missing.

        List of Reports are below
        Report name Report Type
        MGWs Report Network Elements
        MSSs Report
        Clock Report
        Transmission Links Transmission Links
        Internal Links
        Inventory Report Physical Configuration

        Show
        Aurobinda Panda added a comment - need to add the Insert Date & Updated Date for the reports in NEP where it is missing. List of Reports are below Report name Report Type MGWs Report Network Elements MSSs Report Clock Report Transmission Links Transmission Links Internal Links Inventory Report Physical Configuration
        Hide
        Aurobinda Panda added a comment -

        Adding below Reports

        Lambda services report
        Lambda Route Report
        Lambda Report
        Signal Flow

        Path
        Reporting--> WDM

        Show
        Aurobinda Panda added a comment - Adding below Reports Lambda services report Lambda Route Report Lambda Report Signal Flow Path Reporting--> WDM
        Hide
        Aurobinda Panda added a comment - - edited

        Adding few more reports

        Sites report.....................Reporting-> Site-> Sites Report
        CC Information...............Reporting-> Transmission Elements-> CC Information
        VLAN report...................Reporting-> IP/MPLS->VLAN

        Show
        Aurobinda Panda added a comment - - edited Adding few more reports Sites report.....................Reporting- > Site -> Sites Report CC Information...............Reporting- > Transmission Elements -> CC Information VLAN report...................Reporting- > IP/MPLS ->VLAN
        Hide
        Aurobinda Panda added a comment -

        Any update?

        Show
        Aurobinda Panda added a comment - Any update?
        Hide
        Khaled Khalil added a comment -

        WL 2 to 3 mdays

        Show
        Khaled Khalil added a comment - WL 2 to 3 mdays
        Hide
        Aurobinda Panda added a comment -

        Dear @Khaled khalil
        I have reviewed the Implementation details for LS-493.

        It is found OK.

        So please proceed to include the other reports mentioned in this report.

        This is required for OmanTel project.

        Show
        Aurobinda Panda added a comment - Dear @Khaled khalil I have reviewed the Implementation details for LS-493 . It is found OK. So please proceed to include the other reports mentioned in this report. This is required for OmanTel project.
        Hide
        Abir Messaikeh added a comment - - edited

        the attributes of date are still required for below reports

        Report name Report Type
        MGWs Report Network Elements
        MSSs Report
        Clock Report
        Transmission Links Transmission Links
        Internal Links
        Inventory Report Physical Configuration
        Lambda services report
        Lambda Route Report
        Lambda Report
        Signal Flow
        CC Information...............Reporting- CC Information

        Show
        Abir Messaikeh added a comment - - edited the attributes of date are still required for below reports Report name Report Type MGWs Report Network Elements MSSs Report Clock Report Transmission Links Transmission Links Internal Links Inventory Report Physical Configuration Lambda services report Lambda Route Report Lambda Report Signal Flow CC Information...............Reporting- CC Information
        Hide
        Marwan Kanaan added a comment -

        Dear @Aurobinda Panda,

        Kindly note that the dates details have been added for the above reports. Please apply patch 3.7.0.1386 and verify the changes.
        Best Regards,

        Marwan Kanaan I Software Developer

        Show
        Marwan Kanaan added a comment - Dear @Aurobinda Panda, Kindly note that the dates details have been added for the above reports. Please apply patch 3.7.0.1386 and verify the changes. Best Regards, Marwan Kanaan I Software Developer
        Hide
        Aurobinda Panda added a comment -

        Dear @marwan,
        As checked all the above Reports are now having the Insert and update date. in staging platform

        Ticket is closed.

        Show
        Aurobinda Panda added a comment - Dear @marwan, As checked all the above Reports are now having the Insert and update date. in staging platform Ticket is closed.

          People

          • Assignee:
            Aurobinda Panda
            Reporter:
            Aurobinda Panda
          • Votes:
            0 Vote for this issue
            Watchers:
            4 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 day
              1d

                Drag and Drop