Details

    • Customer:
      Zain KSA 3.X

      Description

      Error Report is not Appearing after 21st of May 2025 in ZAIN KSA Production 3.x

        Activity

        Azmat Ali made changes -
        Field Original Value New Value
        Gantt Options Milestone (set to milestone: having a due date but zero effort)
        Planned Start 2025-05-26 24:00 (milestone: set planned start date to due date)
        Planned End 2025-05-26 24:00 (milestone: set planned end date to due date)
        Azmat Ali made changes -
        Attachment server.log.2025-05-23.tgz [ 109807 ]
        Attachment server.log.2025-05-24.tgz [ 109808 ]
        Hide
        Azmat Ali added a comment -

        Khaled Khalil, Please assign someone to get check the same.

        Show
        Azmat Ali added a comment - Khaled Khalil , Please assign someone to get check the same.
        Diana Hamdouche logged work - 27/May/25 12:00 AM
        • Time Spent:
          1 day
           

          .

        Azmat Ali made changes -
        Attachment XML Name Snap.png [ 109902 ]
        Khaled Khalil made changes -
        Assignee Khaled Khalil [ kkhalil ] Diana Hamdouche [ dhamdouche ]
        Hide
        Diana Hamdouche added a comment -

        The issue was clear in logs
        Based on this error, please find the below:
        148 XML imports are currently present in the importer_report table with IMPORT_DATE < '15-MAY-25'.
        Each of these imports has associated error details stored in the import_error table.

        These tables are exceeded their table space and need to be cleaned.
        A cleanup script has been prepared to safely delete all records older than 15-MAY-25 from both tables.
        Please, apply it carefully

        Show
        Diana Hamdouche added a comment - The issue was clear in logs Based on this error, please find the below: 148 XML imports are currently present in the importer_report table with IMPORT_DATE < '15-MAY-25'. Each of these imports has associated error details stored in the import_error table. These tables are exceeded their table space and need to be cleaned. A cleanup script has been prepared to safely delete all records older than 15-MAY-25 from both tables. Please, apply it carefully
        Diana Hamdouche made changes -
        Attachment 20250527_Clean_Import_tables.zip [ 109907 ]
        Diana Hamdouche made changes -
        Attachment Screenshot 2025-05-27 100739.png [ 109909 ]
        Diana Hamdouche made changes -
        Assignee Diana Hamdouche [ dhamdouche ] Azmat Ali [ aali ]
        Diana Hamdouche made changes -
        Remaining Estimate 0 minutes [ 0 ]
        Time Spent 1 day [ 28800 ]
        Worklog Id 268036 [ 268036 ]
        Diana Hamdouche made changes -
        Baseline Start 2025-05-26 24:00 (set baseline based of initial work logging)
        Baseline End 2025-05-26 24:00 (set baseline based of initial work logging)
        Diana Hamdouche made changes -
        Status Open Bug [ 10108 ] Dev Scheduled [ 10014 ]
        Diana Hamdouche made changes -
        Status Dev Scheduled [ 10014 ] Implementation in progress [ 10016 ]
        Assignee Azmat Ali [ aali ] Diana Hamdouche [ dhamdouche ]
        Diana Hamdouche made changes -
        Status Implementation in progress [ 10016 ] To Be Released [ 10400 ]
        Khaled Khalil made changes -
        Status To Be Released [ 10400 ] Ready for QA [ 10023 ]
        Assignee Diana Hamdouche [ dhamdouche ] Azmat Ali [ aali ]
        Azmat Ali made changes -
        Status Ready for QA [ 10023 ] QA In Progress [ 10015 ]
        Azmat Ali made changes -
        Status QA In Progress [ 10015 ] Closed [ 6 ]
        Resolution Fixed [ 1 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Open Bug Open Bug Dev Scheduled Dev Scheduled
        22h 55m 1 Diana Hamdouche 27/May/25 9:56 AM
        Dev Scheduled Dev Scheduled Implementation in progress Implementation in progress
        3s 1 Diana Hamdouche 27/May/25 9:56 AM
        Implementation in progress Implementation in progress To Be Released To Be Released
        3s 1 Diana Hamdouche 27/May/25 9:56 AM
        To Be Released To Be Released Ready for QA Ready for QA
        11m 27s 1 Khaled Khalil 27/May/25 10:08 AM
        Ready for QA Ready for QA QA In Progress QA In Progress
        8d 19h 27m 1 Azmat Ali 05/Jun/25 5:35 AM
        QA In Progress QA In Progress Closed Closed
        15s 1 Azmat Ali 05/Jun/25 5:35 AM
        Subversion JIRA

        Links Hierarchy

         Documentation

        Invalid license: EXPIRED

          People

          • Assignee:
            Azmat Ali
            Reporter:
            Azmat Ali
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 day
              1d

                Drag and Drop