Details

    • Customer:
      OMAN-Tel

      Description

      Please we need to find a way to build automatically a physical connectivity between two nodes that are already routed logically.
      Following the below steps for one sample case:

      In case of end to end fully routed case, without physical connectivity please find the case in below. As you can see ,

      NGN Node: SOHAR_C5_UMG

      Node1:NGN-SOH-SX-EXT-LSW-0
      Node2:RB0001-01-NE40E-X16A-PE-SOHAR

      Routing Info

      AS you can both nodes are now routed through logical information based on routing table. Hence, we need to complete the process by checking if they will be done physically, and nothing was connected between those two nodes. So, we build the connectivity manually between GETH ports from both extremities.

      Created link:

      You can notice in below how the connectivity now is fully routed after creating a link between the GETH, UP interfaces for both Extremities.

        Activity

        Salem Dannawi made changes -
        Field Original Value New Value
        Gantt Options Milestone (set to milestone: having a due date but zero effort)
        Planned Start 2025-07-07 24:00 (milestone: set planned start date to due date)
        Planned End 2025-07-07 24:00 (milestone: set planned end date to due date)
        Bessem Manita made changes -
        Assignee Khaled Khalil [ kkhalil ] Bessem Manita [ bmanita ]
        Abir Messaikeh made changes -
        Labels Service_routing
        Khaled Khalil made changes -
        Status Opened [ 1 ] Pending Requirements [ 10300 ]
        Khaled Khalil made changes -
        Status Pending Requirements [ 10300 ] Pending Design Session [ 10112 ]
        Assignee Bessem Manita [ bmanita ] Khaled Khalil [ kkhalil ]
        Khaled Khalil made changes -
        Status Pending Design Session [ 10112 ] Dev Scheduled [ 10014 ]
        Assignee Khaled Khalil [ kkhalil ] Bessem Manita [ bmanita ]
        Khaled Khalil made changes -
        Status Dev Scheduled [ 10014 ] Implementation in progress [ 10016 ]
        Assignee Bessem Manita [ bmanita ] Khaled Khalil [ kkhalil ]
        Khaled Khalil made changes -
        Assignee Khaled Khalil [ kkhalil ] Bessem Manita [ bmanita ]
        Bessem Manita made changes -
        Status Implementation in progress [ 10016 ] To Be Released [ 10400 ]
        Abir Messaikeh made changes -
        Status To Be Released [ 10400 ] Ready for QA [ 10023 ]
        Assignee Bessem Manita [ bmanita ] Salem Dannawi [ sdannawi ]
        Abir Messaikeh made changes -
        Status Ready for QA [ 10023 ] QA In Progress [ 10015 ]
        Assignee Salem Dannawi [ sdannawi ] Abir Messaikeh [ amessaikeh ]
        Abir Messaikeh made changes -
        Assignee Abir Messaikeh [ amessaikeh ] Aurobinda Panda [ apanda ]
        Abir Messaikeh made changes -
        Reporter Salem Dannawi [ sdannawi ] Aurobinda Panda [ apanda ]
        Abir Messaikeh made changes -
        Reporter Aurobinda Panda [ apanda ] Khaled M Ayoubi [ khaled.ayoubi ]
        Abir Messaikeh made changes -
        Assignee Aurobinda Panda [ apanda ] Khaled M Ayoubi [ khaled.ayoubi ]

          People

          • Assignee:
            Khaled M Ayoubi
            Reporter:
            Khaled M Ayoubi
          • Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Planned Start:
              Planned End:

              Drag and Drop