Details

    • Customer:
      OMAN-Tel

      Description

      Please we need to find a way to build automatically a physical connectivity between two nodes that are already routed logically.
      Following the below steps for one sample case:

      In case of end to end fully routed case, without physical connectivity please find the case in below. As you can see ,

      NGN Node: SOHAR_C5_UMG

      Node1:NGN-SOH-SX-EXT-LSW-0
      Node2:RB0001-01-NE40E-X16A-PE-SOHAR

      Routing Info

      AS you can both nodes are now routed through logical information based on routing table. Hence, we need to complete the process by checking if they will be done physically, and nothing was connected between those two nodes. So, we build the connectivity manually between GETH ports from both extremities.

      Created link:

      You can notice in below how the connectivity now is fully routed after creating a link between the GETH, UP interfaces for both Extremities.

        Activity

        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Opened Opened Pending Requirements Pending Requirements
        33d 5h 8m 1 Khaled Khalil 06/Aug/25 12:52 PM
        Pending Requirements Pending Requirements Pending Design Session Pending Design Session
        5s 1 Khaled Khalil 06/Aug/25 12:52 PM
        Pending Design Session Pending Design Session Dev Scheduled Dev Scheduled
        13s 1 Khaled Khalil 06/Aug/25 12:53 PM
        Dev Scheduled Dev Scheduled Implementation in progress Implementation in progress
        5s 1 Khaled Khalil 06/Aug/25 12:53 PM
        Implementation in progress Implementation in progress To Be Released To Be Released
        2m 48s 1 Bessem Manita 06/Aug/25 12:56 PM
        To Be Released To Be Released Ready for QA Ready for QA
        1d 22m 1 Abir Messaikeh 07/Aug/25 1:18 PM
        Ready for QA Ready for QA QA In Progress QA In Progress
        8s 1 Abir Messaikeh 07/Aug/25 1:18 PM

          People

          • Assignee:
            Khaled M Ayoubi
            Reporter:
            Khaled M Ayoubi
          • Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Planned Start:
              Planned End:

              Drag and Drop