Details

    • Customer:
      Airtel India

      Description

      as observed multiple route has been created for the FTTH nodes, the old route should ideally be deleted from the RB report

      In the Site PoP report and Traffic report, multiple PoPs are being created, whereas it should only reflect the FTTH PoP value- As mentioned in the Document the FTTH site is given the priority irrespective of the MW media. In the below snap for a single ran site, there are multiple pop defined and as well as multiple routing path also , ideally the old logic should not reflect as per the requirement from the airtel.

      Please check the sample case mentioned below with screenshot for JK circle prod , Site SCT950_JK.

      1. FTTH 1.png
        24 kB
      2. ftth 2.png
        29 kB
      3. ftth 3.png
        61 kB
      4. ftth4.png
        40 kB
      5. ftth5.png
        23 kB

        Activity

        Hide
        Bessem Manita added a comment -

        Dear Priyasha,
        Kindly note that the new API has been implemented in the patch 3.7.71.530.
        Please find the API link below:

        http://NEP_SERVER_IP:NEP_SERVER_PORT/NEP_SERVER/services/airtel/deletion/rb/cleanup/oldroutes?versionName=VERSION_NAME&key=y@8j-bZHqp@teHvVB3-@w?K!R5M?YX&nbDaysWithoutEdit=100

        Parameters:
        versionName: Represents the Network Version Name (e.g., FULL_AP_PROD).
        nbDaysWithoutEdit: Represents the number of days with no changes on a route before it becomes eligible for deletion.

        BR,
        Bessem

        Show
        Bessem Manita added a comment - Dear Priyasha, Kindly note that the new API has been implemented in the patch 3.7.71.530. Please find the API link below: http://NEP_SERVER_IP:NEP_SERVER_PORT/NEP_SERVER/services/airtel/deletion/rb/cleanup/oldroutes?versionName=VERSION_NAME&key=y@8j-bZHqp@teHvVB3-@w?K!R5M?YX&nbDaysWithoutEdit=100 Parameters: versionName: Represents the Network Version Name (e.g., FULL_AP_PROD). nbDaysWithoutEdit: Represents the number of days with no changes on a route before it becomes eligible for deletion. BR, Bessem
        Hide
        Priyasha Tiwari added a comment -

        closed

        Show
        Priyasha Tiwari added a comment - closed

          People

          • Assignee:
            Priyasha Tiwari
            Reporter:
            Priyasha Tiwari
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 week, 1 day, 6 hours
              1w 1d 6h

                Drag and Drop