Details

    • Customer:
      Airtel India

      Description

      the route report count is not correct ,Ran source site showing as routed in RB and not showing in route report under custom reports. L

      sample Site ID from DL prod 51908_DL
      Please check the logic and data source used for route report .

        Activity

        Hide
        Priyasha Tiwari added a comment -

        7th nov is the timeline shared with the customer after discussing internally

        Show
        Priyasha Tiwari added a comment - 7th nov is the timeline shared with the customer after discussing internally
        Hide
        Srishti Kashyap added a comment -

        build 3.7.71.522 is released with tracking logs need to be applied on RJ PROD for further results.Also no RB triggered on RJ from 26 oct due to ongoing db problem as informed by integration

        Show
        Srishti Kashyap added a comment - build 3.7.71.522 is released with tracking logs need to be applied on RJ PROD for further results.Also no RB triggered on RJ from 26 oct due to ongoing db problem as informed by integration
        Hide
        Priyasha Tiwari added a comment - - edited

        ISSUE STILL NOT RESOLVED .. ss shared on email

        Show
        Priyasha Tiwari added a comment - - edited ISSUE STILL NOT RESOLVED .. ss shared on email
        Hide
        Priyasha Tiwari added a comment -

        SAMPLE CASE ADBRI1_AS FORM AS CIRCLE DB CONNECTED TO .177 TEST SERVER SHARED AND SCREENSHOT ATTACHED

        Show
        Priyasha Tiwari added a comment - SAMPLE CASE ADBRI1_AS FORM AS CIRCLE DB CONNECTED TO .177 TEST SERVER SHARED AND SCREENSHOT ATTACHED
        Hide
        added a comment -

        Build 3.7.71.534 contains changes for circuit relation saving which was skipped before.

        Show
        added a comment - Build 3.7.71.534 contains changes for circuit relation saving which was skipped before.
        Hide
        Priyasha Tiwari added a comment -

        issue resolved

        Show
        Priyasha Tiwari added a comment - issue resolved

          People

          • Assignee:
            Priyasha Tiwari
            Reporter:
            Priyasha Tiwari
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 week, 3 days, 4 hours, 42 minutes
              1w 3d 4h 42m

                Drag and Drop