Details

    • Customer:
      Ooreedo Tunisia

      Description

      Dear @Khaled Khalil,

      Could you please assign a NEP DEV resource to investigate the issue described below?

      Details:
      • XML Files:
       • Huawei RAN: 2025-09-26-05.01.22_Ooredoo (attached on JIRA-Imported 2nd)
       • Nokia RAN: 2025-10-03-10.37.53_Ooredoo (attached on JIRA-Imported 1st)
      • Import Date: 24-Oct-2025
      • Platform: .102
      • Server Logs: I will attach on JIRA, once received from Integration as they are facing some issue on BO machine.

      Issue Summary:
      During the XML import and validation process, it was observed that six 4G cells are duplicated between the Nokia and Huawei RAN XMLs. However, their parent node ID and node name differ.
      Investigation Findings:

      • While analysing the Huawei RAN XML in NEP, I found no issues within the XML itself — all 4G cells are importing correctly.
      • If the Nokia RAN XML is imported first, all 4G cells appear as expected. However, upon importing the Huawei RAN XML, the same six 4G cells reappear under Huawei RAN and are removed from Nokia RAN.

      Nokia RAN

      SS attached

      Huawei RAN

      SS attached

      • Based on my observation, there might be a missing condition related to the parent node ID or node name when the cell name and cell ID are duplicated.
      • No relevant errors are logged in the Network Reports Importer.

      Kindly review this and assign a developer to check and resolve the issue.

      Thank you
      Indrasan

      1. Huawei RAN_XML.rar
        23.36 MB
        Indrasan Yadav
      2. Nokia RAN_XML.rar
        13.10 MB
        Indrasan Yadav
      1. Huawei RAN_4G Cell_XML.png
        61 kB
      2. Nokia RAN_4G Cell_XML.png
        62 kB

        Activity

        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Open Bug Open Bug Rejected Rejected
        1d 14h 55m 1 Marwan Kanaan 29/Oct/25 5:23 AM

          People

          • Assignee:
            Indrasan Yadav
            Reporter:
            Indrasan Yadav
            Rejected By:
            Marwan Kanaan
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 3 hours, 30 minutes
              3h 30m

                Drag and Drop