Details

    • Customer:
      OMAN-Tel

      Description

      Dear @Abir Messaikeh

      This memo outlines three key requirements from Darwish concerning the Cutover process. We require an assessment of their technical feasibility:

      1. DP (Distribution Point) Selection Logic:
      o Current State: During cutover, NEP determines the DP based on the existing (OLD) DP, using the provided OLD EXC, New EXC, OLD Cabinet, and New Cabinet inputs.
      o Required Change: NEP must ignore the OLD DP. If the OLD DP is available within the New Exchange (New EXC), it should be used. If not, NEP must select any available DP from the New Exchange (New EXC).

      2. Cutover History Management:
      o Requirement: All existing data must be cleared from the Cutover History upon completion of the process.

      3. Error Handling and Messaging:
      o Current State: NEP currently displays a "Cutover successful" prompt simultaneously with a system error (as shown below/in the attachment).
      o Required Change: When the cutover process is not fully/partially successful, NEP must correctly display a "Cutover failure" message instead of a success prompt.

      Action Required: Please review these three points and advise on the feasibility required for implementation.

        Activity

        Hide
        Abir Messaikeh added a comment -

        pending customer to share GTM if required before going to next step

        Show
        Abir Messaikeh added a comment - pending customer to share GTM if required before going to next step

          People

          • Assignee:
            Ayed Bada
            Reporter:
            Shamim Ahmed
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Time Spent - 5 hours Remaining Estimate - 2 hours
              2h
              Logged:
              Time Spent - 5 hours Remaining Estimate - 2 hours
              5h