Details

    • Customer:
      Ooreedo Tunisia

      Description

      Dear @Jharna Thakur,

      As discussed on Friday, please update the rule in connector and share me the updated XML accordingly.

      1- SFP is currently being parsed as boards, which needs to be corrected by removing SFP from the board parsing logic and SFP will be parse now in node interfaces.
      2- I have updated the FRS accordingly and am attaching it here for reference.
      3- For equipment model also updated the FRS & static sheet shared, need to parse the model accordingly.

      Best regards,
      Indrasan

      1. 2026-03-26-01.58.35_Ooredoo.xml_huweai.tgz
        23.56 MB
        Indrasan Yadav
      2. all_huwaei_ran_csv.tgz
        18.04 MB
        Indrasan Yadav
      3. huweai_ran.out.tgz
        7.22 MB
        Indrasan Yadav
      4. OT_Huawei_RAN All Nodes_Physical.docx
        1.64 MB
        Indrasan Yadav
      5. Staging-DB_RAN Validation.xlsx
        13 kB
        Indrasan Yadav

        Activity

        Hide
        Bassem Sabbagh added a comment -

        Jharna to define the WL and to be started on 5-3 the second half

        Show
        Bassem Sabbagh added a comment - Jharna to define the WL and to be started on 5-3 the second half
        Hide
        Jharna Thakur added a comment -

        Wl-2 days

        Show
        Jharna Thakur added a comment - Wl-2 days
        Hide
        Bassem Sabbagh added a comment -

        WIP and to be delivered by 6-3 EOD

        Show
        Bassem Sabbagh added a comment - WIP and to be delivered by 6-3 EOD
        Hide
        Jharna Thakur added a comment -

        xml shared

        Show
        Jharna Thakur added a comment - xml shared
        Hide
        Indrasan Yadav added a comment -

        Hi Jharna, as discussed please generate XML based on revised static sheet (HW_MatchingFile) and share it again.

        Show
        Indrasan Yadav added a comment - Hi Jharna, as discussed please generate XML based on revised static sheet (HW_MatchingFile) and share it again.
        Hide
        Bassem Sabbagh added a comment -

        A bug should be fixed then XML to be generated

        Show
        Bassem Sabbagh added a comment - A bug should be fixed then XML to be generated
        Hide
        Jharna Thakur added a comment - - edited

        xml shared, after fixing the bug

        Show
        Jharna Thakur added a comment - - edited xml shared, after fixing the bug
        Hide
        Indrasan Yadav added a comment -

        Please commit the code for same.

        Show
        Indrasan Yadav added a comment - Please commit the code for same.
        Hide
        Jharna Thakur added a comment -

        code committed

        Show
        Jharna Thakur added a comment - code committed
        Hide
        Indrasan Yadav added a comment -

        Hi Jharna,

        As discussed, please commit the code changes related to the cabinet index for RackType="BBC", and also remove the board parsing logic for entries where BoardType="" in the dump.

        Show
        Indrasan Yadav added a comment - Hi Jharna, As discussed, please commit the code changes related to the cabinet index for RackType="BBC", and also remove the board parsing logic for entries where BoardType="" in the dump.
        Hide
        Bassem Sabbagh added a comment -

        WIP and to be delivered by today

        Show
        Bassem Sabbagh added a comment - WIP and to be delivered by today
        Hide
        Jharna Thakur added a comment -

        code committed.

        Show
        Jharna Thakur added a comment - code committed.
        Hide
        Indrasan Yadav added a comment -

        Requested to Dr. Khaled to release latest AI patch.

        Show
        Indrasan Yadav added a comment - Requested to Dr. Khaled to release latest AI patch.
        Hide
        Indrasan Yadav added a comment - - edited

        After deployment of the latest AI patch, all data is now parsing correctly. However, there are still some gaps in the staging DB. (Excel sheet is attached for reference)

        Show
        Indrasan Yadav added a comment - - edited After deployment of the latest AI patch, all data is now parsing correctly. However, there are still some gaps in the staging DB. (Excel sheet is attached for reference)
        Hide
        Bassem Sabbagh added a comment -

        Assigned to Ashutosh to check the gap between SD and XML

        Show
        Bassem Sabbagh added a comment - Assigned to Ashutosh to check the gap between SD and XML
        Hide
        Ashutosh Shendye added a comment -

        It seems that the tablespace OOREDOO_AI_TS has run out of space, due to which the table is unable to extend further and unable to load the data.
        Shared the feedback with Integretion.

        Show
        Ashutosh Shendye added a comment - It seems that the tablespace OOREDOO_AI_TS has run out of space, due to which the table is unable to extend further and unable to load the data. Shared the feedback with Integretion.
        Hide
        Ashutosh Shendye added a comment -

        As per integretion, tablespace issue is resolved now.
        Please check if there is still gap between SD and xml.

        Show
        Ashutosh Shendye added a comment - As per integretion, tablespace issue is resolved now. Please check if there is still gap between SD and xml.
        Hide
        Indrasan Yadav added a comment -

        The issue for Huawei RAN has now been resolved for the importer ID below, which was shared by @Basant Kumar:

        20260406101508_2026-04-06-10.15.08

        Show
        Indrasan Yadav added a comment - The issue for Huawei RAN has now been resolved for the importer ID below, which was shared by @Basant Kumar: 20260406101508_2026-04-06-10.15.08

          People

          • Assignee:
            Indrasan Yadav
            Reporter:
            Indrasan Yadav
          • Votes:
            0 Vote for this issue
            Watchers:
            4 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Actual End:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 week, 2 hours, 50 minutes
              1w 2h 50m