Details
-
Type:
Task
-
Status:
Closed
(View Workflow)
-
Priority:
Normal
-
Resolution: Done
-
Labels:
-
Customer:Ooreedo Tunisia
Description
Need to analyse the sample dump of Nokia-RAN (Physical & Logical) which is shared by Ooredoo Tunisia.
Sample dump received on:
20-03-2025: 3 separate sample dump for 1-BSC/1-RNC/1-eNodeB.
15-04-2025: Not received any sample dump.
Activity
- All
- Comments
- Work Log
- History
- Activity
- Links Hierarchy
- Transitions
- Trace
-
- Time Spent:
- 2 hours
-
Checked the latest dump in brief which is shared by Ooredoo for BSC IP-VLAN-GW over an email on 26-09-2025.
-
- Time Spent:
- 3 hours
-
Analysed the dump for 5G logical data parsing.
-
- Time Spent:
- 5 hours
-
Analysed the dump for 5G logical data parsing.
-
- Time Spent:
- 3 hours
-
validated the dump for VLAN/GW regarding Nokia RAN_BSC as customer shared another file for same. and cross verify with previous one and BSC dump.
and shared my feedback to Ooredoo on same mail.
-
- Time Spent:
- 4 hours, 30 minutes
-
Analyse the Nokia dump regarding 5G related data availability. I identified this during xml validation where node count was mismatched in dump vs xml. then I know that there is also 5G data available in dump of SRAN. then send an email to @Bassem to confirm we should parse5G data or not?
-
- Time Spent:
- 3 hours
-
Analyse the dump of BSC which is shared by separately with command "ZQRI" for IP & Mask.
-
- Time Spent:
- 1 hour
-
Analyse the latest dump
-
- Time Spent:
- 5 hours
-
Dump analysed for Nokia which was received on 24-07-2025 by Ooredoo on SecureShare point.
-
- Time Spent:
- 2 hours
-
Checked Nokia RAN dump which was received on 24-07-2025 on secure SharePoint.
-
- Time Spent:
- 2 hours
-
Checked the sample dump which is shared by customer on 16-07-2025 over the sharepoint.
-
- Time Spent:
- 2 hours
-
As sample XML validated which was shared by @Sandya from Azerconnect and match the data of XML and dump based on FRS rule.
-
- Time Spent:
- 2 hours
-
Checked sample dump of SRAN which is shared by customer and it seem OK but still pending other node type like BTS/NodeB.
-
- Time Spent:
- 3 hours
-
Checked sample dump with file name "MRBTS12012" which is shared by Ooredoo Tunisia" on 29-05-2025.
-
- Time Spent:
- 5 hours
-
Analyse the eNodeB sample dump for logical data.
-
- Time Spent:
- 1 day
-
Nokia dump analysis for RNC.
-
- Time Spent:
- 1 day
-
Analysed the Nokia RNC dump for physical & logical attributes.
-
- Time Spent:
- 1 day
-
Nokia BSC dump analysis.
-
- Time Spent:
- 4 hours
-
Started worked on Nokia dump analysis.
First attempted with BSC.