Details

    • Customer:
      Ooreedo Tunisia

      Description

      Need to prepare FRS for Huawei_RAN.

        Activity

        Indrasan Yadav logged work - 05/May/25 12:00 AM
        • Time Spent:
          1 day
           

          Preparing FRS for Huawei_RAN_Ooredoo Tunisia.

        Indrasan Yadav made changes -
        Field Original Value New Value
        Gantt Options Milestone (set to milestone: having a due date but zero effort)
        Planned Start 2025-05-12 24:00 (milestone: set planned start date to due date)
        Planned End 2025-05-12 24:00 (milestone: set planned end date to due date)
        Indrasan Yadav made changes -
        Remaining Estimate 0 minutes [ 0 ]
        Time Spent 1 day [ 28800 ]
        Worklog Id 266307 [ 266307 ]
        Indrasan Yadav made changes -
        Baseline Start 2025-05-12 24:00 (set baseline based of initial work logging)
        Baseline End 2025-05-12 24:00 (set baseline based of initial work logging)
        Indrasan Yadav made changes -
        Labels AI_All_incidents RAN_FRS_Preparation AI_All_incidents Huawei_RAN_OO
        Indrasan Yadav made changes -
        Status Opened [ 1 ] In Progress [ 3 ]
        Indrasan Yadav logged work - 06/May/25 12:00 AM
        • Time Spent:
          1 day
           

          Preparing FRS for Huawei_RAN for all node types with physical & logical information.

        Hide
        Bassem Sabbagh added a comment -

        there is no consolidated FRS to be considered as reference, The FRS should be amended with many updates. to be delivered on 9-5-2025

        Show
        Bassem Sabbagh added a comment - there is no consolidated FRS to be considered as reference, The FRS should be amended with many updates. to be delivered on 9-5-2025
        Indrasan Yadav made changes -
        Time Spent 1 day [ 28800 ] 2 days [ 57600 ]
        Worklog Id 266416 [ 266416 ]
        Indrasan Yadav logged work - 07/May/25 12:00 AM
        • Time Spent:
          1 day
           

          FRS preparing for Huawei RAN.

        Indrasan Yadav made changes -
        Time Spent 2 days [ 57600 ] 3 days [ 86400 ]
        Worklog Id 266538 [ 266538 ]
        Indrasan Yadav logged work - 08/May/25 12:00 AM
        • Time Spent:
          1 day
           

          FRS Preparation for Huawei RAN including physical & logical.

        Indrasan Yadav made changes -
        Time Spent 3 days [ 86400 ] 4 days [ 115200 ]
        Worklog Id 266613 [ 266613 ]
        Indrasan Yadav logged work - 09/May/25 12:00 AM
        • Time Spent:
          4 hours
           

          Completed the FRS for Huawei RAN.

        Hide
        Indrasan Yadav added a comment -

        FRS preparation done for physical & logical inventory both which is attached here.

        Note: Might be some amendment needed when we will get all full dump of Huawei from Ooredoo Tunisia.

        Show
        Indrasan Yadav added a comment - FRS preparation done for physical & logical inventory both which is attached here. Note: Might be some amendment needed when we will get all full dump of Huawei from Ooredoo Tunisia.
        Hide
        Bassem Sabbagh added a comment -

        Assigned to Jharna to define the WL

        Show
        Bassem Sabbagh added a comment - Assigned to Jharna to define the WL
        Hide
        Indrasan Yadav added a comment -

        Now, it is assigning to @Jharna as suggested by @Bassem, as she will start work on this.

        Show
        Indrasan Yadav added a comment - Now, it is assigning to @Jharna as suggested by @Bassem, as she will start work on this.
        Indrasan Yadav made changes -
        Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
        Indrasan Yadav made changes -
        Status In Progress [ 3 ] Opened [ 1 ]
        Indrasan Yadav made changes -
        Time Spent 4 days [ 115200 ] 4 days, 4 hours [ 129600 ]
        Worklog Id 266808 [ 266808 ]
        Hide
        Jharna Thakur added a comment - - edited

        After a discussion with Indrasan Yadav, it was observed that the dumps are approximately similar to those of the Omantel Huawei RAN Connector. By using the Omantel Huawei RAN Connector to generate XML from the sample dumps, we were able to generate an XML file after making some initial adjustments to prevent null pointer exceptions.
        The generated XML appears to be mostly accurate; however, certain CSV files, such as those related to radio antennas and some columns in CSVs, are not being generated. This is because the current implementation lacks the necessary code for those elements. Therefore, some modifications will be needed in the Omantel Huawei RAN Connector . Also Indrasan Yadav mentioned that although xml seems ok for sample dumps, he needs to check xml from complete dumps to validate it.

        Show
        Jharna Thakur added a comment - - edited After a discussion with Indrasan Yadav , it was observed that the dumps are approximately similar to those of the Omantel Huawei RAN Connector. By using the Omantel Huawei RAN Connector to generate XML from the sample dumps, we were able to generate an XML file after making some initial adjustments to prevent null pointer exceptions. The generated XML appears to be mostly accurate; however, certain CSV files, such as those related to radio antennas and some columns in CSVs, are not being generated. This is because the current implementation lacks the necessary code for those elements. Therefore, some modifications will be needed in the Omantel Huawei RAN Connector . Also Indrasan Yadav mentioned that although xml seems ok for sample dumps, he needs to check xml from complete dumps to validate it.
        Hide
        Bassem Sabbagh added a comment -

        Jharna to define the WL to add the radio Antenna and fix the csv columns issues

        Show
        Bassem Sabbagh added a comment - Jharna to define the WL to add the radio Antenna and fix the csv columns issues
        Hide
        Jharna Thakur added a comment - - edited

        WL-2.5 days (to add the radio Antenna and fix the csv columns issues)

        Show
        Jharna Thakur added a comment - - edited WL-2.5 days (to add the radio Antenna and fix the csv columns issues)
        Bassem Sabbagh made changes -
        Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
        Hide
        Bassem Sabbagh added a comment -

        a separate jira should be created for this task "Huawei RAN connector creation / update" then to be assigned to Jharna

        Show
        Bassem Sabbagh added a comment - a separate jira should be created for this task "Huawei RAN connector creation / update" then to be assigned to Jharna
        Bassem Sabbagh made changes -
        Status Opened [ 1 ] In Progress [ 3 ]
        Assignee Indrasan Yadav [ iyadav ] Bassem Sabbagh [ bsabbagh ]
        Bassem Sabbagh made changes -
        Assignee Bassem Sabbagh [ bsabbagh ] Indrasan Yadav [ iyadav ]
        Hide
        Bassem Sabbagh added a comment -

        the closure is pending the customer to share samples for other nodes types for confirmation

        Show
        Bassem Sabbagh added a comment - the closure is pending the customer to share samples for other nodes types for confirmation
        Indrasan Yadav made changes -
        Status In Progress [ 3 ] Opened [ 1 ]
        Indrasan Yadav logged work - 21/Aug/25 12:00 AM
        • Time Spent:
          2 hours
           

          Update the Huawei RAN FRS for site id parsing rule.

        Indrasan Yadav made changes -
        Time Spent 4 days, 4 hours [ 129600 ] 4 days, 6 hours [ 136800 ]
        Worklog Id 275245 [ 275245 ]
        Indrasan Yadav logged work - 22/Sep/25 12:00 AM
        • Time Spent:
          1 hour
           

          Based on LS-662, added a rule in FRS and share with @Jharna to implement the same and share me the updated XML under OT-17.

        Indrasan Yadav made changes -
        Time Spent 4 days, 6 hours [ 136800 ] 4 days, 7 hours [ 140400 ]
        Worklog Id 278122 [ 278122 ]
        Indrasan Yadav made changes -
        Status Opened [ 1 ] Resolved [ 5 ]
        Resolution Done [ 10000 ]
        Hide
        Indrasan Yadav added a comment -

        We have already added the issue related to receiving all physical dumps while only sample logical dumps are received in the ACE Tracker.

        Therefore, we are closing this JIRA, as it was created only for FRS preparation, and the required FRS activity has now been completed.

        Show
        Indrasan Yadav added a comment - We have already added the issue related to receiving all physical dumps while only sample logical dumps are received in the ACE Tracker. Therefore, we are closing this JIRA, as it was created only for FRS preparation, and the required FRS activity has now been completed.
        Indrasan Yadav made changes -
        Status Resolved [ 5 ] Closed [ 6 ]
        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Opened Opened In Progress In Progress
        2d 4h 48m 2 Bassem Sabbagh 14/May/25 6:12 AM
        In Progress In Progress Opened Opened
        20d 19h 57m 2 Indrasan Yadav 28/May/25 7:04 AM
        Opened Opened Resolved Resolved
        238d 1h 49m 1 Indrasan Yadav 21/Jan/26 7:54 AM
        Resolved Resolved Closed Closed
        4m 10s 1 Indrasan Yadav 21/Jan/26 7:58 AM
        Subversion JIRA

        Links Hierarchy

         Documentation

        Invalid license: EXPIRED

          People

          • Assignee:
            Indrasan Yadav
            Reporter:
            Indrasan Yadav
          • Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Actual End:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 4 days, 7 hours
              4d 7h