Details

    • Customer:
      Ooreedo Tunisia

      Description

      Need to prepare FRS for Huawei_RAN.

        Activity

        Hide
        Bassem Sabbagh added a comment -

        there is no consolidated FRS to be considered as reference, The FRS should be amended with many updates. to be delivered on 9-5-2025

        Show
        Bassem Sabbagh added a comment - there is no consolidated FRS to be considered as reference, The FRS should be amended with many updates. to be delivered on 9-5-2025
        Hide
        Indrasan Yadav added a comment -

        FRS preparation done for physical & logical inventory both which is attached here.

        Note: Might be some amendment needed when we will get all full dump of Huawei from Ooredoo Tunisia.

        Show
        Indrasan Yadav added a comment - FRS preparation done for physical & logical inventory both which is attached here. Note: Might be some amendment needed when we will get all full dump of Huawei from Ooredoo Tunisia.
        Hide
        Bassem Sabbagh added a comment -

        Assigned to Jharna to define the WL

        Show
        Bassem Sabbagh added a comment - Assigned to Jharna to define the WL
        Hide
        Indrasan Yadav added a comment -

        Now, it is assigning to @Jharna as suggested by @Bassem, as she will start work on this.

        Show
        Indrasan Yadav added a comment - Now, it is assigning to @Jharna as suggested by @Bassem, as she will start work on this.
        Hide
        Jharna Thakur added a comment - - edited

        After a discussion with Indrasan Yadav, it was observed that the dumps are approximately similar to those of the Omantel Huawei RAN Connector. By using the Omantel Huawei RAN Connector to generate XML from the sample dumps, we were able to generate an XML file after making some initial adjustments to prevent null pointer exceptions.
        The generated XML appears to be mostly accurate; however, certain CSV files, such as those related to radio antennas and some columns in CSVs, are not being generated. This is because the current implementation lacks the necessary code for those elements. Therefore, some modifications will be needed in the Omantel Huawei RAN Connector . Also Indrasan Yadav mentioned that although xml seems ok for sample dumps, he needs to check xml from complete dumps to validate it.

        Show
        Jharna Thakur added a comment - - edited After a discussion with Indrasan Yadav , it was observed that the dumps are approximately similar to those of the Omantel Huawei RAN Connector. By using the Omantel Huawei RAN Connector to generate XML from the sample dumps, we were able to generate an XML file after making some initial adjustments to prevent null pointer exceptions. The generated XML appears to be mostly accurate; however, certain CSV files, such as those related to radio antennas and some columns in CSVs, are not being generated. This is because the current implementation lacks the necessary code for those elements. Therefore, some modifications will be needed in the Omantel Huawei RAN Connector . Also Indrasan Yadav mentioned that although xml seems ok for sample dumps, he needs to check xml from complete dumps to validate it.
        Hide
        Bassem Sabbagh added a comment -

        Jharna to define the WL to add the radio Antenna and fix the csv columns issues

        Show
        Bassem Sabbagh added a comment - Jharna to define the WL to add the radio Antenna and fix the csv columns issues
        Hide
        Jharna Thakur added a comment - - edited

        WL-2.5 days (to add the radio Antenna and fix the csv columns issues)

        Show
        Jharna Thakur added a comment - - edited WL-2.5 days (to add the radio Antenna and fix the csv columns issues)
        Hide
        Bassem Sabbagh added a comment -

        a separate jira should be created for this task "Huawei RAN connector creation / update" then to be assigned to Jharna

        Show
        Bassem Sabbagh added a comment - a separate jira should be created for this task "Huawei RAN connector creation / update" then to be assigned to Jharna
        Hide
        Bassem Sabbagh added a comment -

        the closure is pending the customer to share samples for other nodes types for confirmation

        Show
        Bassem Sabbagh added a comment - the closure is pending the customer to share samples for other nodes types for confirmation
        Hide
        Indrasan Yadav added a comment -

        We have already added the issue related to receiving all physical dumps while only sample logical dumps are received in the ACE Tracker.

        Therefore, we are closing this JIRA, as it was created only for FRS preparation, and the required FRS activity has now been completed.

        Show
        Indrasan Yadav added a comment - We have already added the issue related to receiving all physical dumps while only sample logical dumps are received in the ACE Tracker. Therefore, we are closing this JIRA, as it was created only for FRS preparation, and the required FRS activity has now been completed.

          People

          • Assignee:
            Indrasan Yadav
            Reporter:
            Indrasan Yadav
          • Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Actual End:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 4 days, 7 hours
              4d 7h