Details

    • Customer:
      Zain 2.X
    • Reason:
      Telco/Product Request
    • Severity:
      Blocker
    • Product:
      NEP
    • Classification:
      CR
    • REQUESTER:
      INTERNAL

      Description

      As discussed in internal meeting, the way forward is as follows:
      Please provide script to extract catalog count types, equipment mode, cabinet types, shelf type, boards types, etc from both KSA & new KW deployment. Then these two sets of data will be compared to determine how many new catalogs need to be created in new KSA deployment.
      However, creating the missing catalog manually would be a time-consuming process as number of missing catalogs would be quite a lot. Hence, the recommended option ( if technically possible ) would be to migrate the catalog from Zain KSA itself. If that is not possible then we should attempt to make the missing catalogs through some script or automation rather than creating them manually.

        Activity

        Hide
        Saurabh Chugh added a comment -

        Have checked few catalogs from the sheet. They are present in the Local 3x platform. next step would be to actually import a validated 3x XML & check for any catalog discrepancies in the NEP error report.

        Show
        Saurabh Chugh added a comment - Have checked few catalogs from the sheet. They are present in the Local 3x platform. next step would be to actually import a validated 3x XML & check for any catalog discrepancies in the NEP error report.
        Hide
        Bassem Sabbagh added a comment -

        Navneet Kaur this should be done by the telco resource in charge for Zain KSA

        Show
        Bassem Sabbagh added a comment - Navneet Kaur this should be done by the telco resource in charge for Zain KSA
        Hide
        Navneet Kaur added a comment -

        Thank you, I will check on this

        Show
        Navneet Kaur added a comment - Thank you, I will check on this
        Hide
        Navneet Kaur added a comment -

        As discussed with Tarun Sir, please assign resource and ETA for checking

        Show
        Navneet Kaur added a comment - As discussed with Tarun Sir, please assign resource and ETA for checking
        Hide
        Bassem Sabbagh added a comment -

        Assigned to Ahad .. This will be fulfilled once the XMLs validations are done for all domains .. tentative date is 21-5-2024

        Show
        Bassem Sabbagh added a comment - Assigned to Ahad .. This will be fulfilled once the XMLs validations are done for all domains .. tentative date is 21-5-2024

          People

          • Assignee:
            Ahad Siddiqui
            Reporter:
            Navneet Kaur
          • Votes:
            0 Vote for this issue
            Watchers:
            4 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 day
              1d

                Drag and Drop