Details

    • Customer:
      Zain 2.X
    • Complexity:
      Low
    • Severity:
      Blocker
    • Product:
      NEP
    • Classification:
      BUG
    • REQUESTER:
      INTERNAL

      Description

      Click to add description

        Activity

        Subversion JIRA

        Links Hierarchy

         Documentation

        Invalid license: EXPIRED

        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        In Progress In Progress To Do To Do
        8d 4h 26m 1 Bassem Sabbagh 03/Apr/24 9:04 AM
        To Do To Do In Progress In Progress
        39d 17h 45m 2 Sandya Sharma 01/May/24 4:59 AM
        In Progress In Progress Done Done
        15d 1h 19m 1 Navneet Kaur 16/May/24 6:18 AM
        Sandya Sharma made changes -
        Time Spent 4 days, 6 hours [ 136800 ] 1 week, 6 hours [ 165600 ]
        Worklog Id 250530 [ 250530 ]
        Sandya Sharma made changes -
        Time Spent 3 days, 6 hours [ 108000 ] 4 days, 6 hours [ 136800 ]
        Worklog Id 250529 [ 250529 ]
        Navneet Kaur made changes -
        Status In Progress [ 3 ] Done [ 10000 ]
        Hide
        Ahad Siddiqui added a comment -

        data succesfully loaded , JIRA can be closed.

        Show
        Ahad Siddiqui added a comment - data succesfully loaded , JIRA can be closed.
        Hide
        Ahad Siddiqui added a comment -

        import done , there is small gap in license count in NEP and XML.
        Will check based on other priorities and close by 15-05

        Show
        Ahad Siddiqui added a comment - import done , there is small gap in license count in NEP and XML. Will check based on other priorities and close by 15-05
        Hide
        Ahad Siddiqui added a comment -

        Node type field was missing in the nelicense which Sandya had had fixed , import to be done on 13-05

        Show
        Ahad Siddiqui added a comment - Node type field was missing in the nelicense which Sandya had had fixed , import to be done on 13-05
        Sandya Sharma made changes -
        Assignee Sandya Sharma [ ssharma ] Ahad Siddiqui [ asiddiqui ]
        Ahad Siddiqui made changes -
        Assignee Ahad Siddiqui [ asiddiqui ] Sandya Sharma [ ssharma ]
        Hide
        Ahad Siddiqui added a comment -

        delayed due to OT demo and other import on ZKSA test platform , will complete on 09-05

        Show
        Ahad Siddiqui added a comment - delayed due to OT demo and other import on ZKSA test platform , will complete on 09-05
        Hide
        Ahad Siddiqui added a comment -

        import and valiadtion will be completed by 08-05

        Show
        Ahad Siddiqui added a comment - import and valiadtion will be completed by 08-05
        Sandya Sharma logged work - 07/May/24 12:00 AM
        • Time Spent:
          1 day
           

          work on the issue

        Sandya Sharma made changes -
        Assignee Sandya Sharma [ ssharma ] Ahad Siddiqui [ asiddiqui ]
        Hide
        Sandya Sharma added a comment -

        XML shared.

        Show
        Sandya Sharma added a comment - XML shared.
        Hide
        Ahad Siddiqui added a comment -

        As discussed model is missing , please include and reshare.

        Show
        Ahad Siddiqui added a comment - As discussed model is missing , please include and reshare.
        Ahad Siddiqui made changes -
        Assignee Ahad Siddiqui [ asiddiqui ] Sandya Sharma [ ssharma ]
        Sandya Sharma logged work - 06/May/24 12:00 AM
        • Time Spent:
          1 day
           

          work on the issue

        Sandya Sharma made changes -
        Assignee Sandya Sharma [ ssharma ] Ahad Siddiqui [ asiddiqui ]
        Hide
        Sandya Sharma added a comment -

        XML shared.

        Show
        Sandya Sharma added a comment - XML shared.
        Shamim Ahmed made changes -
        Attachment Site DetailsKSA.csv [ 99961 ]
        Sandya Sharma made changes -
        Status To Do [ 10001 ] In Progress [ 3 ]
        Navneet Kaur made changes -
        Summary Nokia MW _Connector development,Analyze the attached dump and upload the FRS Nokia MW _License Connector development,Analyze the attached dump and upload the FRS
        Date of Baselining 27/Mar/24 3:41 AM 27/Mar/24 3:41 AM
        Shamim Ahmed made changes -
        Time Spent 2 days, 7 hours [ 82800 ] 3 days, 6 hours [ 108000 ]
        Worklog Id 248337 [ 248337 ]
        Shamim Ahmed made changes -
        Time Spent 2 days [ 57600 ] 2 days, 7 hours [ 82800 ]
        Worklog Id 248336 [ 248336 ]
        Shamim Ahmed made changes -
        Time Spent 1 day, 1 hour [ 32400 ] 2 days [ 57600 ]
        Worklog Id 248335 [ 248335 ]
        Bassem Sabbagh made changes -
        Assignee Bassem Sabbagh [ bsabbagh ] Sandya Sharma [ ssharma ]
        Hide
        Bassem Sabbagh added a comment - - edited

        to be started on 1-5 and delivered on 3-5

        Show
        Bassem Sabbagh added a comment - - edited to be started on 1-5 and delivered on 3-5
        Navneet Kaur made changes -
        Comment [ kindly assign development timelines ]
        Navneet Kaur made changes -
        Assignee Sandya Sharma [ ssharma ] Bassem Sabbagh [ bsabbagh ]
        Hide
        Sandya Sharma added a comment -

        WL is 3 day.

        Show
        Sandya Sharma added a comment - WL is 3 day.
        Hide
        Bassem Sabbagh added a comment -

        to be discussed with Ahad and sandya to define the WL on 17-4

        Show
        Bassem Sabbagh added a comment - to be discussed with Ahad and sandya to define the WL on 17-4
        Hide
        Bassem Sabbagh added a comment -

        Assigned to sandya to define the Wl

        Show
        Bassem Sabbagh added a comment - Assigned to sandya to define the Wl
        Bassem Sabbagh made changes -
        Assignee Bassem Sabbagh [ bsabbagh ] Sandya Sharma [ ssharma ]
        Navneet Kaur made changes -
        Summary Nokia MW _Analyze the attached dump and upload the FRS Nokia MW _Connector development,Analyze the attached dump and upload the FRS
        Ahad Siddiqui made changes -
        Assignee Ahad Siddiqui [ asiddiqui ] Bassem Sabbagh [ bsabbagh ]
        Hide
        Ahad Siddiqui added a comment -

        Reviewed

        @Bassem : PLease assign it to AI DEV

        Show
        Ahad Siddiqui added a comment - Reviewed @Bassem : PLease assign it to AI DEV
        Hide
        Ahad Siddiqui added a comment -

        will Validate by 15-04 eod

        Show
        Ahad Siddiqui added a comment - will Validate by 15-04 eod
        Shamim Ahmed logged work - 10/Apr/24 12:00 AM
        • Time Spent:
          7 hours
           

          CREATING FRS

        Shamim Ahmed made changes -
        Assignee Ahad Siddiqui [ asiddiqui ]
        Hide
        Shamim Ahmed added a comment -

        Please find attached FRS

        Show
        Shamim Ahmed added a comment - Please find attached FRS
        Shamim Ahmed made changes -
        Assignee Shamim Ahmed [ sahmed ]
        Shamim Ahmed made changes -
        Hide
        Bassem Sabbagh added a comment -

        FRS to be shared by 9-4-2024 EOD then to validated by Ahad

        Show
        Bassem Sabbagh added a comment - FRS to be shared by 9-4-2024 EOD then to validated by Ahad
        Shamim Ahmed logged work - 09/Apr/24 12:00 AM
        • Time Spent:
          7 hours
           

          CREATING FRS

        Hide
        Bassem Sabbagh added a comment -

        FRS to be created by 9-4-2024

        Show
        Bassem Sabbagh added a comment - FRS to be created by 9-4-2024
        Shamim Ahmed logged work - 08/Apr/24 12:00 AM
        • Time Spent:
          7 hours
           

          CREATING FRS

        Hide
        Bassem Sabbagh added a comment -

        to be resumed on 8-4-2024

        Show
        Bassem Sabbagh added a comment - to be resumed on 8-4-2024
        Bassem Sabbagh made changes -
        Status In Progress [ 3 ] To Do [ 10001 ]
        Hide
        Bassem Sabbagh added a comment -

        delayed due to dumps gap analysis shared by OT

        Show
        Bassem Sabbagh added a comment - delayed due to dumps gap analysis shared by OT
        Shamim Ahmed made changes -
        Remaining Estimate 4 hours [ 14400 ] 0 minutes [ 0 ]
        Time Spent 4 hours [ 14400 ] 1 day, 1 hour [ 32400 ]
        Worklog Id 247287 [ 247287 ]
        Hide
        Shamim Ahmed added a comment -

        FRS preparation to be started from next week

        Show
        Shamim Ahmed added a comment - FRS preparation to be started from next week
        Hide
        Shamim Ahmed added a comment -

        After validation Total LIcense Node=5242,matched node=5188.Node NA=54.
        Will intiate FRS preparation,WL= 2 days,parallely asking support for this 54 nodes.

        Show
        Shamim Ahmed added a comment - After validation Total LIcense Node=5242,matched node=5188.Node NA=54. Will intiate FRS preparation,WL= 2 days,parallely asking support for this 54 nodes.
        Hide
        Shamim Ahmed added a comment - - edited

        Dumps are ok but had to validate it with existing inventory and dumps

        Show
        Shamim Ahmed added a comment - - edited Dumps are ok but had to validate it with existing inventory and dumps
        Shamim Ahmed made changes -
        Remaining Estimate 0 minutes [ 0 ] 4 hours [ 14400 ]
        Time Spent 1 day [ 28800 ] 4 hours [ 14400 ]
        Worklog Id 246887 [ 246887 ]
        Worklog Time Spent 4 hours [ 14400 ]
        Shamim Ahmed made changes -
        Time Spent 4 hours [ 14400 ] 1 day [ 28800 ]
        Worklog Id 246888 [ 246888 ]
        Shamim Ahmed made changes -
        Baseline Start 2024-03-15 05:42 (set baseline based of initial work logging)
        Baseline End 2024-03-19 05:42 (set baseline based of initial work logging)
        Shamim Ahmed made changes -
        Remaining Estimate 0 minutes [ 0 ]
        Time Spent 4 hours [ 14400 ]
        Worklog Id 246887 [ 246887 ]
        Shamim Ahmed logged work - 27/Mar/24 12:00 AM
        • Time Spent:
          5 hours
           

          Analysing Dumps with ZKSA inventory & DUmps

        Shamim Ahmed made changes -
        Status To Do [ 10001 ] In Progress [ 3 ]
        Hide
        Shamim Ahmed added a comment - - edited

        Dumps validation to be done on 26-3

        Show
        Shamim Ahmed added a comment - - edited Dumps validation to be done on 26-3
        Shamim Ahmed logged work - 26/Mar/24 12:00 AM
        • Time Spent:
          4 hours
           

          Analysing Dump

        Bassem Sabbagh made changes -
        Assignee Indrasan Yadav [ iyadav ] Shamim Ahmed [ sahmed ]
        Hide
        Bassem Sabbagh added a comment -

        Wl = 0.5 mdays

        Show
        Bassem Sabbagh added a comment - Wl = 0.5 mdays
        Bassem Sabbagh made changes -
        Assignee Ahad Siddiqui [ asiddiqui ] Indrasan Yadav [ iyadav ]
        Hide
        Ahad Siddiqui added a comment -

        Analysis to be done by 21-03-2024

        Show
        Ahad Siddiqui added a comment - Analysis to be done by 21-03-2024
        Hide
        Bassem Sabbagh added a comment -

        Please to define to WL to prepare the FRS after analyzing the dump to parse the license - New connector
        Should be analyzed by next week

        Show
        Bassem Sabbagh added a comment - Please to define to WL to prepare the FRS after analyzing the dump to parse the license - New connector Should be analyzed by next week
        Bassem Sabbagh made changes -
        Assignee Bassem Sabbagh [ bsabbagh ] Ahad Siddiqui [ asiddiqui ]
        Navneet Kaur made changes -
        Field Original Value New Value
        Assignee Navneet Kaur [ nkaur ] Bassem Sabbagh [ bsabbagh ]

          People

          • Assignee:
            Ahad Siddiqui
            Reporter:
            Navneet Kaur
          • Votes:
            0 Vote for this issue
            Watchers:
            5 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 week, 6 hours
              1w 6h

                Drag and Drop