Details

    • Customer:
      Airtel India

      Description

      After applying the patch on prod ,We found that the data is now available in Site pop path report, but found following issues with the report.
      Please find the below DL circle issues for reference.
      Issue 1: Some sites are missing in the Site Pop Path report, even though they are available routed in the Route Builder.
      • As shown in the snapshot below, Site 21972_DL appears as routed in the Route Builder report but is missing from the Site Pop Path report.
      Route builder report SS: shared on email .
      Issue 2: Hop count is showing incorrectly in the Site Pop Path report for some sites.
      As per the 43253_DL site snapshot, the hop count in the report is displayed as zero, even though one H1 is available in the path, as shown in the Site Pop Path report.
      Site POP path report: shared on email

      1. rb hp test.xlsx
        6.41 MB
        Priyasha Tiwari
      2. site pop hp test.csv
        684 kB
        Priyasha Tiwari
      1. 10764 test snap.png
        27 kB
      2. GJ RB REPORT.png
        29 kB
      3. GJ SITE POP.png
        54 kB
      4. GJ SITE POP REPORT.png
        9 kB
      5. HP PROD SNAP.png
        81 kB
      6. HP PROD SNAP.png
        81 kB
      7. image (10).png
        18 kB
      8. image (12).png
        300 kB
      9. image (13).png
        95 kB
      10. RB SNAP PROD HP.png
        48 kB
      11. SITE POP HP PROD.png
        27 kB
      12. site pop sample from hp test.png
        69 kB

      Issue Links

        Activity

        Subversion JIRA

        Links Hierarchy

         Documentation

        Invalid license: EXPIRED

          People

          • Assignee:
            Priyasha Tiwari
            Reporter:
            Priyasha Tiwari
          • Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 4 weeks, 6 hours, 30 minutes
              4w 6h 30m

                Drag and Drop