Details
-
Type:
Task
-
Status:
Closed
(View Workflow)
-
Priority:
Normal
-
Resolution: Done
-
Labels:
-
Customer:Ooreedo Tunisia
-
- 21082025.log
- 3 kB
- Indrasan Yadav
-
- MRBTS15142.xml
- 2.84 MB
- Indrasan Yadav
-
- Nokia Dump.rar
- 2.46 MB
- Indrasan Yadav
-
- OT_NSN_RAN_FRS_2G_Logical.docx
- 1.22 MB
- Indrasan Yadav
-
- OT_NSN_RAN_FRS_All Node Type_Physical.docx
- 1.72 MB
- Indrasan Yadav
-
- OT_NSN-RAN_FRS_4G_Logical.docx
- 2.18 MB
- Indrasan Yadav
-
- OT_NSN-RAN_FRS_5G_Logical.docx
- 1.62 MB
- Indrasan Yadav
-
Hide
- Updated FRS for SRAN (Special Case).zip
- 5.92 MB
- Indrasan Yadav
-
- Updated FRS for SRAN (Special Case)/OT_NSN-RAN_FRS_4G_Logical - For SRAN Modification Rule.docx 2.24 MB
- Updated FRS for SRAN (Special Case)/OT_NSN_RAN_FRS_2G_Logical - For SRAN Modification Rule.docx 1.23 MB
- Updated FRS for SRAN (Special Case)/OT_NSN_RAN_FRS_3G_Logical - For SRAN Modification Rule.docx 1.32 MB
- Updated FRS for SRAN (Special Case)/OT_NSN_RAN_FRS_All Node Type_Physical - For SRAN Modification Rule.docx 1.61 MB
Activity
- All
- Comments
- Work Log
- History
- Activity
- Links Hierarchy
- Transitions
- Trace
XML shared.
Addinfo issue will be fixed by 3-10
xml shared , only one issue remaining regarding the addinfo.
Hi Sandya,
As discussed, please find below the feedback from the logical data validation except 5G I completed today:
1- Some SRAN and one RNC node are not found in addinfo under ADJNode & Association (list already shared with you over Teams).
Request you to please share the updated XML again after fixing the above issues, including the 5G logical data.
All Inventory comments are implemented for Nokia RAN .and XML has been shared ... Logical part to be completed by 1-10 EOD .. The CSVs to be shared with integration to load them in SD
Hi Sandya,
As discussed and confirmed with Bassem, I am currently validating the Nokia RAN XML and will share my final feedback once the validation is fully completed.
In the meantime, I imported the XML you shared (after receiving confirmation from Bassem). Based on the error report only (not from full NEP validation, which I have not yet completed), I have identified the following node-level issues that need to be addressed:
1- Please use the updated "site data info."
2- Duplexing mode is missing in "ltecell" (this was fixed earlier but has reappeared).
3- Duplicate names are present for 4–5 nodes (FRS attached for the added rule).
4- eNodeB is not defined in "ltecell" (this was fixed earlier but has reappeared).
To be delivered by 1-10 EOD
WIP and to be delivered by 30-9 EOD
WL is 2 day.
Hi Sandya, as discussed please find the attached FRS for 5G logical data parsing.
csv output shared with integration.
all points are delivered. logical will be considered after updating the FRS ...XML to be shared in one hour .. CSVs to be shared with integration to load it in SD
Dear Sandya,
as discussed please fix the pending points regarding RNC-IP/BTS-IP, 5G nodes parsing, and share me updated XML: (Once I will complete the rule for 5G logical will share the updated FRS)
Please ensure to use latest "site data information" sheet.
The XML was shared by Sandya.
Hi Sandya,
As discussed, could you please share the XML file as well? Currently, only the tables are available in the shared folder, and the XML file seems to be missing.
XML shared for 5g.
to be delivered by 18-9
to be delivered by 18-9 the first half
WIP ....
Dear Sandya Sharma,
Please commit the code for all issues that have been fixed so far. Once the pending issues listed below are resolved, I will request an additional code commit.
Pending Items
Nokia RAN:
1. MIMO & Parent eNodeB issue under ltecell – As discussed with @Sandya Sharma, she will need support from #Driss.
2. IP/GW for RNC – As discussed with @Sandya Sharma, this will be fixed with in the 5G data parsing.
3. 5G Data Parsing – To be completed by 15-09 EOD.
5G to be delivered by 15-9 EOD
5G Airtel model to be used for now as suggested by product
xml shared, one issue is remaining about mimo configuration , i need to discuss it about driss sir.
WIP and XML with feedback to be accommodated except for 5G
for 5g there is no model available for 5g nodes in NPS model , discussed with hassan sir he told that he will see, for now working on the BSC new dump which have logical interface data will be deliver this by today.
To be delivered on 11-9 the EOD with remaining feedback and 5G
from the previous issue , issue no 18 , 19 are remaining issue no 8 will resolve after adding the 5g node because as per discussion this node is related to 5g .
for the 5g implementation and remaining issue WL is 2.5 day.
Dear Sandya Sharma,
As discussed, please find attached the FRS, in which I have added a rule for 5G data parsing along with BSC IP/Mask details parsing. (As confirmed the management we have to parse the 5G data also as we have the scope for same)
Kindly implement the changes and share the XML along with the corresponding CSV, ensuring that all issues highlighted in the previous feedback are resolved.
Note: Please apply the same SRAN rule for 5G as well, considering the additional tags available in the dump for each class (As dump structure is same of eNodeB/SRAN for 5G as well).
Thank you,
Indrasan
WIP ..to be delivered as scheduled
WIP and to be delivered by 9-9
WL is 2 day.
Sandya to advise on WL and to be started on 5-9-25
Dear Sandya Sharma,
as discussed I have shared XML validation feedback over an email.
Please check & fix the all given issues, if you need any clarification please let me know.
Thank you
Indrasan
XML Shared.
to be delivered by EOD
WIP and to be delivered by 21-8
WIP
to be started on 19-8 and delivered on 21-8
WL is 3 day, need to change all class according to the new dump.
Assigned to Sandya to define the WL
Dear Bassem Sabbagh,
As discussed please assign this JIRA to AI DEV to check and fix the mentioned issue as in above comment.
Hi Sandya,
as discussed please check & fix below issue as per given priority:
1st-
In CSV "cell-antenna-type" the value of header "Name" should be same as the value of header "Id" (Snippet is attached for reference with file name: "Snippet_Snippet_Cell Antenna Type")
2nd-
I have attached updated FRS (as discussed over teams call) please do changes in connector for all classes and generate the XML for Nokia_RAN (Dump shared to you over the teams).
XML validation has been completed & imported in NEP .102.
XML shared .
Hi Sandhya, as discussed, please check & fix the issue.
1- Based on CSV it seems ok but when I imported & validated the data in NEP there is an error when I investigated in XML I found some gaps which I explain you over teams call. (attribute "name" is parsing for all possible antenna id for a particular node like SRAN/NodeB)
XML shared.
Hi Sandya, as you shared me sample XML over teams for all highlighted issues fixed but still below issues need to be check & fix again:
1- Antenna parsing for Node-B (as described over teams call)
2- Bandwidth/Frequency band issues of all cells like 2G/3G/4G are not fixed. so we have taken a reference from OmanTel and updated then share you a static file. (as discussed over teams call)
3- In csv loopback interface header node type has blank data for SRAN node.
Please fix the above issues and generate XML again.
to be completed by 16-7
Hi Sandya, for your reference I have shared again a compile list of all pending issue over an email which need to be fix.
(There is only one new case of antenna parsing for NodeB which I missed to inform you last time but I was already added a rule in FRS)
to be delivered on 14-7
Work resumed and to delivered by 14-7
Laptop issue ... WL = 2 mday
WIP .... please add the WL and to be started on 8-7
Hi Sandya, as discussed now node & related physical datas are parsing correctly for sample nodes.
For logical datas the XML which you shared me on 04-07-2025, it's validation remarks except addinfo has been shared to you over an email, please check & fix the same.
I have added some extra details for physical IP parsing for RNC/SRAN as described over teams call, please do the changes accordingly.
XML shared for addinfo.
one addinfo issue is remaining will fix it by today.
XML shared.
to be delivered by 3-7
WL is 1.5 day .
Hi Sandya, XML validation remarks shared over the mail. please check & fix the same.
XML validation to be completed by 30-6
XML shared.
to be delivered by 27-6
delayed and to be delivered on 27-5 the first half
to be delivered by 24-6 the second half
WL is 1.5 day.
Hi Sandya Sharma, xml validation is completed and feedback shared over the mail, please check & fix the same.
XML shared.
XML is generated now for refactoring connector but some of the csv are missing in this working in this issue with the chnages made by indrasan, will complete this by 19-06-2025.
FRS for physical has been considered ... Logical FRSs are not checked yet and logical data will be parsed based on Azerconnect code for now.. XML to be shared by 17-6
XML is generated based on Azerconnect connector.
Issues in the xml to be fixed to be inline with FRS ... To be delivered by 16-6 as per per SD model
Sandya to define the WL
Dear Bassem Sabbagh, please assign an AI DEV resource to generate XML for Nokia RAN. Require FRS is attached here for reference.
The XML was validated and feedback shared, now we are validating the all xml data on staging-DB so closing this JIRA.