Details

    • Customer:
      Zain 2.X
    • Complexity:
      Low
    • Severity:
      Blocker
    • Product:
      NEP
    • Classification:
      BUG
    • REQUESTER:
      INTERNAL

      Description

      Click to add description

        Activity

        Hide
        Bassem Sabbagh added a comment -

        Please to define to WL to prepare the FRS after analyzing the dump to parse the license - New connector
        Should be analyzed by next week

        Show
        Bassem Sabbagh added a comment - Please to define to WL to prepare the FRS after analyzing the dump to parse the license - New connector Should be analyzed by next week
        Hide
        Ahad Siddiqui added a comment -

        Analysis to be done by 21-03-2024

        Show
        Ahad Siddiqui added a comment - Analysis to be done by 21-03-2024
        Hide
        Bassem Sabbagh added a comment -

        Wl = 0.5 mdays

        Show
        Bassem Sabbagh added a comment - Wl = 0.5 mdays
        Hide
        Shamim Ahmed added a comment - - edited

        Dumps validation to be done on 26-3

        Show
        Shamim Ahmed added a comment - - edited Dumps validation to be done on 26-3
        Hide
        Shamim Ahmed added a comment - - edited

        Dumps are ok but had to validate it with existing inventory and dumps

        Show
        Shamim Ahmed added a comment - - edited Dumps are ok but had to validate it with existing inventory and dumps
        Hide
        Shamim Ahmed added a comment -

        After validation Total LIcense Node=5242,matched node=5188.Node NA=54.
        Will intiate FRS preparation,WL= 2 days,parallely asking support for this 54 nodes.

        Show
        Shamim Ahmed added a comment - After validation Total LIcense Node=5242,matched node=5188.Node NA=54. Will intiate FRS preparation,WL= 2 days,parallely asking support for this 54 nodes.
        Hide
        Shamim Ahmed added a comment -

        FRS preparation to be started from next week

        Show
        Shamim Ahmed added a comment - FRS preparation to be started from next week
        Hide
        Bassem Sabbagh added a comment -

        delayed due to dumps gap analysis shared by OT

        Show
        Bassem Sabbagh added a comment - delayed due to dumps gap analysis shared by OT
        Hide
        Bassem Sabbagh added a comment -

        to be resumed on 8-4-2024

        Show
        Bassem Sabbagh added a comment - to be resumed on 8-4-2024
        Hide
        Bassem Sabbagh added a comment -

        FRS to be created by 9-4-2024

        Show
        Bassem Sabbagh added a comment - FRS to be created by 9-4-2024
        Hide
        Bassem Sabbagh added a comment -

        FRS to be shared by 9-4-2024 EOD then to validated by Ahad

        Show
        Bassem Sabbagh added a comment - FRS to be shared by 9-4-2024 EOD then to validated by Ahad
        Hide
        Shamim Ahmed added a comment -

        Please find attached FRS

        Show
        Shamim Ahmed added a comment - Please find attached FRS
        Hide
        Ahad Siddiqui added a comment -

        will Validate by 15-04 eod

        Show
        Ahad Siddiqui added a comment - will Validate by 15-04 eod
        Hide
        Ahad Siddiqui added a comment -

        Reviewed

        @Bassem : PLease assign it to AI DEV

        Show
        Ahad Siddiqui added a comment - Reviewed @Bassem : PLease assign it to AI DEV
        Hide
        Bassem Sabbagh added a comment -

        Assigned to sandya to define the Wl

        Show
        Bassem Sabbagh added a comment - Assigned to sandya to define the Wl
        Hide
        Bassem Sabbagh added a comment -

        to be discussed with Ahad and sandya to define the WL on 17-4

        Show
        Bassem Sabbagh added a comment - to be discussed with Ahad and sandya to define the WL on 17-4
        Hide
        Sandya Sharma added a comment -

        WL is 3 day.

        Show
        Sandya Sharma added a comment - WL is 3 day.
        Hide
        Bassem Sabbagh added a comment - - edited

        to be started on 1-5 and delivered on 3-5

        Show
        Bassem Sabbagh added a comment - - edited to be started on 1-5 and delivered on 3-5
        Hide
        Sandya Sharma added a comment -

        XML shared.

        Show
        Sandya Sharma added a comment - XML shared.
        Hide
        Ahad Siddiqui added a comment -

        As discussed model is missing , please include and reshare.

        Show
        Ahad Siddiqui added a comment - As discussed model is missing , please include and reshare.
        Hide
        Sandya Sharma added a comment -

        XML shared.

        Show
        Sandya Sharma added a comment - XML shared.
        Hide
        Ahad Siddiqui added a comment -

        import and valiadtion will be completed by 08-05

        Show
        Ahad Siddiqui added a comment - import and valiadtion will be completed by 08-05
        Hide
        Ahad Siddiqui added a comment -

        delayed due to OT demo and other import on ZKSA test platform , will complete on 09-05

        Show
        Ahad Siddiqui added a comment - delayed due to OT demo and other import on ZKSA test platform , will complete on 09-05
        Hide
        Ahad Siddiqui added a comment -

        Node type field was missing in the nelicense which Sandya had had fixed , import to be done on 13-05

        Show
        Ahad Siddiqui added a comment - Node type field was missing in the nelicense which Sandya had had fixed , import to be done on 13-05
        Hide
        Ahad Siddiqui added a comment -

        import done , there is small gap in license count in NEP and XML.
        Will check based on other priorities and close by 15-05

        Show
        Ahad Siddiqui added a comment - import done , there is small gap in license count in NEP and XML. Will check based on other priorities and close by 15-05
        Hide
        Ahad Siddiqui added a comment -

        data succesfully loaded , JIRA can be closed.

        Show
        Ahad Siddiqui added a comment - data succesfully loaded , JIRA can be closed.

          People

          • Assignee:
            Ahad Siddiqui
            Reporter:
            Navneet Kaur
          • Votes:
            0 Vote for this issue
            Watchers:
            5 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 week, 6 hours
              1w 6h

                Drag and Drop