Details

    • Customer:
      Airtel India

      Description

      as observed multiple route has been created for the FTTH nodes, the old route should ideally be deleted from the RB report

      In the Site PoP report and Traffic report, multiple PoPs are being created, whereas it should only reflect the FTTH PoP value- As mentioned in the Document the FTTH site is given the priority irrespective of the MW media. In the below snap for a single ran site, there are multiple pop defined and as well as multiple routing path also , ideally the old logic should not reflect as per the requirement from the airtel.

      Please check the sample case mentioned below with screenshot for JK circle prod , Site SCT950_JK.

      1. FTTH 1.png
        24 kB
      2. ftth 2.png
        29 kB
      3. ftth 3.png
        61 kB
      4. ftth4.png
        40 kB
      5. ftth5.png
        23 kB

        Activity

        Priyasha Tiwari logged work - 11/Nov/25 12:00 AM
        • Time Spent:
          4 hours
           

          SAMPLE CASES requested by L3 team FROM a SMALL CIRCLE HP or AS as there DB is connected to test server ..

        Priyasha Tiwari logged work - 26/Nov/25 12:00 AM
        • Time Spent:
          2 hours
           

          logic implementation discussed with customer and iL3 team

        Basant Kumar logged work - 28/Nov/25 12:00 AM
        • Time Spent:
          2 hours
           

          NEP_AIRTEL - Build 3.7.71.530 - Successful has been deployed on all test servers . and DB configured

        Priyasha Tiwari logged work - 02/Dec/25 12:00 AM
        • Time Spent:
          1 hour
           

          API for old route deletion testing

        Basant Kumar logged work - 02/Dec/25 12:00 AM
        • Time Spent:
          1 hour
           

          shared logs from .37 test for Service routing -Old route deletion requirement

        Priyasha Tiwari logged work - 04/Dec/25 12:00 AM
        • Time Spent:
          2 hours
           

          `sample case from Production shared for 2g tech also,

        Priyasha Tiwari logged work - 05/Dec/25 12:00 AM
        • Time Spent:
          30 minutes
           

          TESTING DONE ON TEST PLATFORM

        Priyasha Tiwari logged work - 12/Dec/25 12:00 AM
        • Time Spent:
          1 hour
           

          traffic report sample shared with L3

        Srishti Kashyap logged work - 12/Dec/25 12:00 AM - edited
        • Time Spent:
          3 hours
           

          adding insert date and update date in pop site report checked the code have blank report in local checked the code did the changes...checking the dev machine restarting and checking there report.

        Srishti Kashyap logged work - 15/Dec/25 12:00 AM
        • Time Spent:
          7 hours, 30 minutes
           

          checked the site pop report , checking the code for traffic report and debugging making changes restarting dev server testing checking...discussed with bessem pop site date are need to be circuit route one not site related changing the related code again after analysing doing ttesting restarting at dev checking committed the code

        Basant Kumar logged work - 17/Dec/25 12:00 AM
        • Time Spent:
          2 hours
           

          Build 3.7.71.538 has been applied on all test servers and then configured the DB .

        Priyasha Tiwari logged work - 19/Dec/25 12:00 AM
        • Time Spent:
          1 hour
           

          testing on test server for patch 538

        Srishti Kashyap logged work - 19/Dec/25 12:00 AM - edited
        • Time Spent:
          1 hour
           

          checked issue raised for site pop report column mismatch

        Basant Kumar logged work - 22/Dec/25 12:00 AM
        • Time Spent:
          30 minutes
           

          i have unlocked hpcopy2025 db schema on dev machine .

        Srishti Kashyap logged work - 22/Dec/25 12:00 AM - edited
        • Time Spent:
          7 hours, 30 minutes
           

          checked the code connecting dev problem db locked requested unlock did changes and restarted server checking the fixes testing committing

        Basant Kumar logged work - 23/Dec/25 12:00 AM
        • Time Spent:
          1 hour
           

          i have created the HP DB-clone and shared credentials with dev team .

        Priyasha Tiwari logged work - 30/Dec/25 12:00 AM
        • Time Spent:
          5 hours
           

          TESTING ON TEST SERVER, CALL WITH L3 AND CUSTOMER , FULL RB TRIGGER AND VALIDATION OF OUTCOME AFTERTHAT

        Priyasha Tiwari logged work - 02/Jan/26 12:00 AM
        • Time Spent:
          4 hours
           

          test case validation for the API and call with L2 and L3 for API execution procedure and post validation of logs with L3

        Basant Kumar logged work - 05/Jan/26 12:00 AM
        • Time Spent:
          1 hour
           

          i have triggered API on .177 server .

        Basant Kumar logged work - 05/Jan/26 12:00 AM
        • Time Spent:
          1 hour
           

          i have triggered API on .177 after that i found error and shared logs to dev team.

        Basant Kumar logged work - 09/Jan/26 12:00 AM
        • Time Spent:
          1 hour
           

          i checked the NEP patch status on all airtel test servers after that informed to dev team and retriggered the API on .177 and shared log.

        Basant Kumar logged work - 15/Jan/26 12:00 AM
        • Time Spent:
          1 hour
           

          i have triggered API on .177 and monitored logs until completed .

        Basant Kumar logged work - 16/Jan/26 12:00 AM
        • Time Spent:
          1 hour
           

          i have triggered the API for 110 days and after that i monitored the logs and shared on mail .

        Priyasha Tiwari logged work - 16/Jan/26 12:00 AM
        • Time Spent:
          2 hours
           

          testing, pre post validation and internal call with L3

        Basant Kumar logged work - 27/Jan/26 12:00 AM
        • Time Spent:
          1 hour
           

          i have triggered API on .177 after that i have monitored the logs then shared on mail

          People

          • Assignee:
            Priyasha Tiwari
            Reporter:
            Priyasha Tiwari
          • Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Remaining Estimate - 0 minutes
              0m
              Logged:
              Time Spent - 1 week, 1 day, 6 hours
              1w 1d 6h

                Drag and Drop