Details
-
Type:
Bug
-
Status:
Closed
(View Workflow)
-
Priority:
Normal
-
Resolution: Fixed
-
Component/s: NEP
-
Customer:Airtel India
Description
as observed multiple route has been created for the FTTH nodes, the old route should ideally be deleted from the RB report
In the Site PoP report and Traffic report, multiple PoPs are being created, whereas it should only reflect the FTTH PoP value- As mentioned in the Document the FTTH site is given the priority irrespective of the MW media. In the below snap for a single ran site, there are multiple pop defined and as well as multiple routing path also , ideally the old logic should not reflect as per the requirement from the airtel.
Please check the sample case mentioned below with screenshot for JK circle prod , Site SCT950_JK.
Attachments
Activity
- All
- Comments
- Work Log
- History
- Activity
- Links Hierarchy
- Transitions
- Trace
-
- Time Spent:
- 4 hours
-
SAMPLE CASES requested by L3 team FROM a SMALL CIRCLE HP or AS as there DB is connected to test server ..
-
- Time Spent:
- 2 hours
-
logic implementation discussed with customer and iL3 team
-
- Time Spent:
- 2 hours
-
NEP_AIRTEL - Build 3.7.71.530 - Successful has been deployed on all test servers . and DB configured
-
- Time Spent:
- 1 hour
-
API for old route deletion testing
-
- Time Spent:
- 1 hour
-
shared logs from .37 test for Service routing -Old route deletion requirement
-
- Time Spent:
- 2 hours
-
`sample case from Production shared for 2g tech also,
-
- Time Spent:
- 30 minutes
-
TESTING DONE ON TEST PLATFORM
-
- Time Spent:
- 1 hour
-
traffic report sample shared with L3
-
- Time Spent:
- 3 hours
-
adding insert date and update date in pop site report checked the code have blank report in local checked the code did the changes...checking the dev machine restarting and checking there report.
-
- Time Spent:
- 7 hours, 30 minutes
-
checked the site pop report , checking the code for traffic report and debugging making changes restarting dev server testing checking...discussed with bessem pop site date are need to be circuit route one not site related changing the related code again after analysing doing ttesting restarting at dev checking committed the code
-
- Time Spent:
- 2 hours
-
Build 3.7.71.538 has been applied on all test servers and then configured the DB .
-
- Time Spent:
- 1 hour
-
testing on test server for patch 538
-
- Time Spent:
- 1 hour
-
checked issue raised for site pop report column mismatch
-
- Time Spent:
- 30 minutes
-
i have unlocked hpcopy2025 db schema on dev machine .
-
- Time Spent:
- 7 hours, 30 minutes
-
checked the code connecting dev problem db locked requested unlock did changes and restarted server checking the fixes testing committing
-
- Time Spent:
- 1 hour
-
i have created the HP DB-clone and shared credentials with dev team .
-
- Time Spent:
- 5 hours
-
TESTING ON TEST SERVER, CALL WITH L3 AND CUSTOMER , FULL RB TRIGGER AND VALIDATION OF OUTCOME AFTERTHAT
-
- Time Spent:
- 4 hours
-
test case validation for the API and call with L2 and L3 for API execution procedure and post validation of logs with L3
-
- Time Spent:
- 1 hour
-
i have triggered API on .177 server .
-
- Time Spent:
- 1 hour
-
i have triggered API on .177 after that i found error and shared logs to dev team.
-
- Time Spent:
- 1 hour
-
i checked the NEP patch status on all airtel test servers after that informed to dev team and retriggered the API on .177 and shared log.
-
- Time Spent:
- 1 hour
-
i have triggered API on .177 and monitored logs until completed .
-
- Time Spent:
- 1 hour
-
i have triggered the API for 110 days and after that i monitored the logs and shared on mail .
-
- Time Spent:
- 2 hours
-
testing, pre post validation and internal call with L3
-
- Time Spent:
- 1 hour
-
i have triggered API on .177 after that i have monitored the logs then shared on mail