Details

    • Customer:
      Ooreedo Tunisia

      Activity

      Subversion JIRA

      Links Hierarchy

       Documentation

      Invalid license: EXPIRED

      Transition Time In Source Status Execution Times Last Executer Last Execution Date
      Opened Opened In Progress In Progress
      56d 57m 2 Bassem Sabbagh 07/Aug/25 5:00 AM
      In Progress In Progress Opened Opened
      175d 4h 10m 2 Indrasan Yadav 31/Dec/25 10:31 AM
      Opened Opened Closed Closed
      16s 1 Indrasan Yadav 31/Dec/25 10:31 AM
      Indrasan Yadav made changes -
      Status Opened [ 1 ] Closed [ 6 ]
      Resolution Done [ 10000 ]
      Indrasan Yadav made changes -
      Status In Progress [ 3 ] Opened [ 1 ]
      Indrasan Yadav made changes -
      Time Spent 3 weeks, 1 day, 4 hours, 54 minutes [ 478440 ] 3 weeks, 1 day, 7 hours, 24 minutes [ 487440 ]
      Worklog Id 280600 [ 280600 ]
      Indrasan Yadav logged work - 15/Oct/25 12:00 AM
      • Time Spent:
        2 hours, 30 minutes
         

        Take the cabinet/shelf/board/antenna serial number count for Huawei RAN

      Indrasan Yadav made changes -
      Time Spent 3 weeks, 1 day, 4 hours, 24 minutes [ 476640 ] 3 weeks, 1 day, 4 hours, 54 minutes [ 478440 ]
      Worklog Id 279139 [ 279139 ]
      Indrasan Yadav logged work - 01/Oct/25 12:00 AM
      • Time Spent:
        30 minutes
         

        Take a teams call with Basant to discuss the issue regarding XML is not generating on server due to properties file path mismatch.

      Basant Kumar made changes -
      Time Spent 3 weeks, 1 day, 3 hours, 24 minutes [ 473040 ] 3 weeks, 1 day, 4 hours, 24 minutes [ 476640 ]
      Worklog Id 278899 [ 278899 ]
      Indrasan Yadav made changes -
      Time Spent 3 weeks, 1 day, 2 hours, 54 minutes [ 471240 ] 3 weeks, 1 day, 3 hours, 24 minutes [ 473040 ]
      Worklog Id 278862 [ 278862 ]
      Hide
      Indrasan Yadav added a comment -

      Dear @Basant Kumar,

      Please deploy this AI patch on Ooredoo test platform and after deployed please generate Huawei_RAN XML & upload the CSV to staging DB.

      Release Version: 4.0.0.29

      Thank you
      Indrasan

      Show
      Indrasan Yadav added a comment - Dear @Basant Kumar, Please deploy this AI patch on Ooredoo test platform and after deployed please generate Huawei_RAN XML & upload the CSV to staging DB. Release Version: 4.0.0.29 Thank you Indrasan
      Sandya Sharma made changes -
      Assignee Sandya Sharma [ ssharma ] Indrasan Yadav [ iyadav ]
      Basant Kumar logged work - 29/Sep/25 12:00 AM
      • Time Spent:
        1 hour
         

        AI patch deployed on Ooredoo and XML generated

      Indrasan Yadav logged work - 29/Sep/25 12:00 AM
      • Time Spent:
        30 minutes
         

        Checked for latest patch and requested to Integration to deploy it on .102 and generate the XML for Huawei RAN then upload the CSV output to Staging-DB. and taken followed up for the same.

      Indrasan Yadav made changes -
      Worklog Id 278685 [ 278685 ]
      Indrasan Yadav made changes -
      Time Spent 3 weeks, 1 day, 2 hours, 24 minutes [ 469440 ] 3 weeks, 1 day, 2 hours, 54 minutes [ 471240 ]
      Worklog Id 278685 [ 278685 ]
      Indrasan Yadav made changes -
      Time Spent 3 weeks, 1 day, 1 hour, 54 minutes [ 467640 ] 3 weeks, 1 day, 2 hours, 24 minutes [ 469440 ]
      Worklog Id 278684 [ 278684 ]
      Indrasan Yadav made changes -
      Worklog Id 278418 [ 278418 ]
      Hide
      Sandya Sharma added a comment -

      added missing code for cellduplex.

      Show
      Sandya Sharma added a comment - added missing code for cellduplex.
      Bassem Sabbagh made changes -
      Assignee Jharna Thakur [ jthakur ] Sandya Sharma [ ssharma ]
      Hide
      Bassem Sabbagh added a comment -

      the code was not synchronized by sandya before the revision 135391 .. Sandya now to compare the two revisions 135390 & 135391

      to identify the gap and rectify it

      Show
      Bassem Sabbagh added a comment - the code was not synchronized by sandya before the revision 135391 .. Sandya now to compare the two revisions 135390 & 135391 to identify the gap and rectify it
      Indrasan Yadav logged work - 26/Sep/25 12:00 AM - edited
      • Time Spent:
        30 minutes
         

        Validated the brief XML after shared by @Jharna and now issue fixed. and shared the same XML to @Basant to copy it on .102.

      Indrasan Yadav made changes -
      Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
      Hide
      Indrasan Yadav added a comment -

      Hi Jharna,

      In the earlier XML you shared (before the recent code commit), the CSV file for "ltecell" contained the header "Duplexing Mode", and it was successfully imported in NEP.

      However, in the latest XML you provided, this header is missing.

      Could you please check, fix the issue, and share the updated XML?

      Show
      Indrasan Yadav added a comment - Hi Jharna, In the earlier XML you shared (before the recent code commit), the CSV file for "ltecell" contained the header "Duplexing Mode", and it was successfully imported in NEP. However, in the latest XML you provided, this header is missing. Could you please check, fix the issue, and share the updated XML?
      Indrasan Yadav logged work - 25/Sep/25 12:00 AM
      • Time Spent:
        30 minutes
         

        After imported the XML in NEP it was found that the header "Duplexing mode" is missing in CSV "ltecell". raised to @Jharna to fix the same.

      Jharna Thakur made changes -
      Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
      Hide
      Jharna Thakur added a comment -

      code committed

      Show
      Jharna Thakur added a comment - code committed
      Indrasan Yadav made changes -
      Time Spent 3 weeks, 1 day, 1 hour, 24 minutes [ 465840 ] 3 weeks, 1 day, 1 hour, 54 minutes [ 467640 ]
      Worklog Id 278418 [ 278418 ]
      Hide
      Indrasan Yadav added a comment -

      Hi Jharna,

      Please commit the code for same.

      Show
      Indrasan Yadav added a comment - Hi Jharna, Please commit the code for same.
      Indrasan Yadav made changes -
      Time Spent 3 weeks, 1 day, 24 minutes [ 462240 ] 3 weeks, 1 day, 1 hour, 24 minutes [ 465840 ]
      Worklog Id 278418 [ 278418 ]
      Indrasan Yadav made changes -
      Remaining Estimate 18 minutes [ 1080 ] 0 minutes [ 0 ]
      Time Spent 3 weeks, 7 hours, 24 minutes [ 458640 ] 3 weeks, 1 day, 24 minutes [ 462240 ]
      Worklog Id 278403 [ 278403 ]
      Indrasan Yadav logged work - 24/Sep/25 12:00 AM - edited
      • Time Spent:
        1 hour, 30 minutes
         

        Validate the XML again after fix the issues as confirmed to @Jharna over teams call, now it has been fixed and shared the same XML to @Basant to copy it on .102 to import the same.

      Jharna Thakur made changes -
      Remaining Estimate 0 minutes [ 0 ] 18 minutes [ 1080 ]
      Time Spent 3 weeks, 7 hours, 42 minutes [ 459720 ] 3 weeks, 7 hours, 24 minutes [ 458640 ]
      Worklog Id 278320 [ 278320 ]
      Jharna Thakur made changes -
      Time Spent 3 weeks, 2 hours, 42 minutes [ 441720 ] 3 weeks, 7 hours, 42 minutes [ 459720 ]
      Worklog Id 278320 [ 278320 ]
      Hide
      Jharna Thakur added a comment -

      xml shared

      Show
      Jharna Thakur added a comment - xml shared
      Indrasan Yadav logged work - 23/Sep/25 12:00 AM
      • Time Spent:
        1 hour
         

        Validated the XML as shared by @Jharna after fix the issue of LS-662. Still issue is persist for some cases so taken a call with her and explain the same.

      Jharna Thakur logged work - 23/Sep/25 12:00 AM - edited
      • Time Spent:
        4 hours, 42 minutes
         

        implementing the new rule

      Indrasan Yadav made changes -
      Worklog Id 278124 [ 278124 ]
      Indrasan Yadav made changes -
      Remaining Estimate 1 hour [ 3600 ] 0 minutes [ 0 ]
      Time Spent 3 weeks, 1 hour, 42 minutes [ 438120 ] 3 weeks, 2 hours, 42 minutes [ 441720 ]
      Worklog Id 278124 [ 278124 ]
      Indrasan Yadav made changes -
      Remaining Estimate 0 minutes [ 0 ] 1 hour [ 3600 ]
      Time Spent 3 weeks, 2 hours, 42 minutes [ 441720 ] 3 weeks, 1 hour, 42 minutes [ 438120 ]
      Worklog Id 278121 [ 278121 ]
      Worklog Time Spent 1 hour [ 3600 ]
      Indrasan Yadav made changes -
      Time Spent 3 weeks, 1 hour, 42 minutes [ 438120 ] 3 weeks, 2 hours, 42 minutes [ 441720 ]
      Worklog Id 278121 [ 278121 ]
      Indrasan Yadav made changes -
      Attachment Radio antenna issues_22-09-2025.xlsx [ 118104 ]
      Indrasan Yadav made changes -
      Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
      Hide
      Indrasan Yadav added a comment -

      Dear Jharna Thakur,

      As discussed, please address the issue identified under "Radio Antenna":

      1- In cases where duplicate names are found, each subsequent duplicate must be made unique after the first data is parsed.

      2- To achieve this, a special character \1 should be appended to the duplicate name, with the number incremented by +1 for each occurrence.

      Example: (Attached)

      Show
      Indrasan Yadav added a comment - Dear Jharna Thakur , As discussed, please address the issue identified under "Radio Antenna": 1- In cases where duplicate names are found, each subsequent duplicate must be made unique after the first data is parsed. 2- To achieve this, a special character \1 should be appended to the duplicate name, with the number incremented by +1 for each occurrence. Example: (Attached)
      Indrasan Yadav made changes -
      Indrasan Yadav logged work - 22/Sep/25 12:00 AM - edited
      • Time Spent:
        1 hour
         

        "All code committed up to 19-09-2025 has been requested to @Khaled for AI patch release. After the release, requested to Integration to deploy it on .102 and share the XML, which along with the CSV will be uploaded to S-DB."

      Jharna Thakur made changes -
      Time Spent 3 weeks, 1 hour, 12 minutes [ 436320 ] 3 weeks, 1 hour, 42 minutes [ 438120 ]
      Worklog Id 277955 [ 277955 ]
      Jharna Thakur made changes -
      Time Spent 3 weeks, 42 minutes [ 434520 ] 3 weeks, 1 hour, 12 minutes [ 436320 ]
      Worklog Id 277955 [ 277955 ]
      Indrasan Yadav made changes -
      Time Spent 2 weeks, 4 days, 7 hours, 12 minutes [ 429120 ] 3 weeks, 42 minutes [ 434520 ]
      Worklog Id 277918 [ 277918 ]
      Jharna Thakur made changes -
      Time Spent 2 weeks, 4 days, 7 hours [ 428400 ] 2 weeks, 4 days, 7 hours, 12 minutes [ 429120 ]
      Worklog Id 277903 [ 277903 ]
      Jharna Thakur made changes -
      Remaining Estimate 3 hours [ 10800 ] 0 minutes [ 0 ]
      Time Spent 2 weeks, 4 days, 4 hours [ 417600 ] 2 weeks, 4 days, 7 hours [ 428400 ]
      Worklog Id 277903 [ 277903 ]
      Jharna Thakur made changes -
      Remaining Estimate 0 minutes [ 0 ] 3 hours [ 10800 ]
      Time Spent 2 weeks, 4 days, 7 hours [ 428400 ] 2 weeks, 4 days, 4 hours [ 417600 ]
      Worklog Id 277902 [ 277902 ]
      Worklog Time Spent 3 hours [ 10800 ]
      Jharna Thakur made changes -
      Time Spent 2 weeks, 4 days, 4 hours [ 417600 ] 2 weeks, 4 days, 7 hours [ 428400 ]
      Worklog Id 277902 [ 277902 ]
      Jharna Thakur logged work - 18/Sep/25 12:00 AM - edited
      • Time Spent:
        1 hour
         

        working on csv to db configuration

      Bassem Sabbagh made changes -
      Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
      Hide
      Jharna Thakur added a comment -

      Code committed

      Show
      Jharna Thakur added a comment - Code committed
      Indrasan Yadav logged work - 17/Sep/25 12:00 AM
      • Time Spent:
        1 hour, 30 minutes
         

        I found some minor issues during NEP data validation and raised it to @Jharna, she fixed it & shared me XML & I validated the same. now issue has been fixed.

      Jharna Thakur logged work - 17/Sep/25 12:00 AM - edited
      • Time Spent:
        3 hours, 12 minutes
         

        working on feedback from previous shared xml

      Indrasan Yadav made changes -
      Time Spent 2 weeks, 4 days, 3 hours, 30 minutes [ 415800 ] 2 weeks, 4 days, 4 hours [ 417600 ]
      Worklog Id 277543 [ 277543 ]
      Indrasan Yadav made changes -
      Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
      Hide
      Indrasan Yadav added a comment -

      Dear Jharna Thakur,

      Please commit the code for all issues that have been fixed so far. Once the pending issues listed below are resolved, I will request an additional code commit.

      Pending Items

      Huawei RAN:

      1. IP Data – As discussed with @Jharna Thakur, I will review and confirm during data validation in NEP. No issues are expected, but if any arise, I should be raised it to her & she will take support from #Driss.

      Show
      Indrasan Yadav added a comment - Dear Jharna Thakur , Please commit the code for all issues that have been fixed so far. Once the pending issues listed below are resolved, I will request an additional code commit. Pending Items Huawei RAN: 1. IP Data – As discussed with @Jharna Thakur, I will review and confirm during data validation in NEP. No issues are expected, but if any arise, I should be raised it to her & she will take support from #Driss.
      Indrasan Yadav logged work - 15/Sep/25 12:00 AM
      • Time Spent:
        30 minutes
         

        Requested to Jharna to shared updated XML with using of latest "site data information" as she didn't used it earlier for BSC/RNC.

      Hide
      Indrasan Yadav added a comment -

      Due to LS-639 still xml import is not completed.

      Show
      Indrasan Yadav added a comment - Due to LS-639 still xml import is not completed.
      Indrasan Yadav made changes -
      Time Spent 2 weeks, 4 days, 2 hours, 30 minutes [ 412200 ] 2 weeks, 4 days, 3 hours, 30 minutes [ 415800 ]
      Worklog Id 277313 [ 277313 ]
      Hide
      Indrasan Yadav added a comment -

      Hi Jharna Thakur,

      As discussed, the issue has been fixed, except for the IP data part, which I will confirm after importing the XML. Currently, a single IP data CSV is being generated, whereas normally two IP data CSV files are expected.

      Show
      Indrasan Yadav added a comment - Hi Jharna Thakur , As discussed, the issue has been fixed, except for the IP data part, which I will confirm after importing the XML. Currently, a single IP data CSV is being generated, whereas normally two IP data CSV files are expected.
      Indrasan Yadav logged work - 11/Sep/25 12:00 AM
      • Time Spent:
        1 hour
         

        Checked updated xml which shared by @Jharna over teams after fix the issues of parent enodeb in "ltecell" and "enodebandwidths" and it is fixed now. but still IP data issue persist which I will confirm after import the XML.

      Indrasan Yadav made changes -
      Time Spent 2 weeks, 4 days, 1 hour, 30 minutes [ 408600 ] 2 weeks, 4 days, 2 hours, 30 minutes [ 412200 ]
      Worklog Id 277020 [ 277020 ]
      Indrasan Yadav made changes -
      Worklog Id 277020 [ 277020 ]
      Indrasan Yadav made changes -
      Time Spent 2 weeks, 3 days, 5 hours, 30 minutes [ 394200 ] 2 weeks, 4 days, 1 hour, 30 minutes [ 408600 ]
      Worklog Id 277020 [ 277020 ]
      Indrasan Yadav logged work - 10/Sep/25 12:00 AM - edited
      • Time Spent:
        5 hours
         

        Validate the complete xml and still some issue which are not fixed and IP data parsing incorrect, discussed with Jharna and she fixed it but again a single IP Data csv is generating instead of 2 ip data csv. and still enodeb is not defined in "ltecell" and "enodebbandwidth" raised to Jharna. for IP data I will import the xml in NEP them confirm that it should be fixed or it can be acceptable.

        I tried to import the XML in .102 but there is an issue and same is raised to integration and they found some error and highlighted to NEP DEV.

      Indrasan Yadav made changes -
      Time Spent 2 weeks, 3 days, 3 hours, 30 minutes [ 387000 ] 2 weeks, 3 days, 5 hours, 30 minutes [ 394200 ]
      Worklog Id 276801 [ 276801 ]
      Jharna Thakur made changes -
      Remaining Estimate 1 hour [ 3600 ] 0 minutes [ 0 ]
      Time Spent 2 weeks, 2 days, 7 hours [ 370800 ] 2 weeks, 3 days, 3 hours, 30 minutes [ 387000 ]
      Worklog Id 276745 [ 276745 ]
      Jharna Thakur made changes -
      Remaining Estimate 0 minutes [ 0 ] 1 hour [ 3600 ]
      Time Spent 2 weeks, 3 days [ 374400 ] 2 weeks, 2 days, 7 hours [ 370800 ]
      Worklog Id 276731 [ 276731 ]
      Jharna Thakur made changes -
      Time Spent 2 weeks, 2 days, 5 hours [ 363600 ] 2 weeks, 3 days [ 374400 ]
      Worklog Id 276731 [ 276731 ]
      Jharna Thakur made changes -
      Time Spent 2 weeks, 1 day, 6 hours [ 338400 ] 2 weeks, 2 days, 5 hours [ 363600 ]
      Worklog Id 276730 [ 276730 ]
      Jharna Thakur made changes -
      Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
      Indrasan Yadav logged work - 09/Sep/25 12:00 AM
      • Time Spent:
        2 hours
         

        Huawei RAN full XML Validation started and partially completed.

      Hide
      Jharna Thakur added a comment -

      xml shared

      Show
      Jharna Thakur added a comment - xml shared
      Hide
      Bassem Sabbagh added a comment -

      it will be delivered by today EOD

      Show
      Bassem Sabbagh added a comment - it will be delivered by today EOD
      Indrasan Yadav made changes -
      Time Spent 2 weeks, 1 day, 5 hours, 30 minutes [ 336600 ] 2 weeks, 1 day, 6 hours [ 338400 ]
      Worklog Id 276619 [ 276619 ]
      Indrasan Yadav made changes -
      Time Spent 2 weeks, 1 day, 5 hours [ 334800 ] 2 weeks, 1 day, 5 hours, 30 minutes [ 336600 ]
      Worklog Id 276619 [ 276619 ]
      Indrasan Yadav made changes -
      Remaining Estimate 1 hour [ 3600 ] 0 minutes [ 0 ]
      Time Spent 2 weeks, 1 day [ 316800 ] 2 weeks, 1 day, 5 hours [ 334800 ]
      Worklog Id 276619 [ 276619 ]
      Jharna Thakur logged work - 08/Sep/25 12:00 AM
      • Time Spent:
        4 hours, 30 minutes
         

        working on feedback

      Hide
      Bassem Sabbagh added a comment -

      WIP and to be delivered by today EOD (without manufacture name)

      Show
      Bassem Sabbagh added a comment - WIP and to be delivered by today EOD (without manufacture name)
      Hide
      Jharna Thakur added a comment -

      WL-2 days

      Show
      Jharna Thakur added a comment - WL-2 days
      Jharna Thakur logged work - 05/Sep/25 12:00 AM - edited
      • Time Spent:
        2 hours
         

        working on feedback

      Jharna Thakur logged work - 04/Sep/25 12:00 AM
      • Time Spent:
        7 hours
         

        working on feedback

      Jharna Thakur made changes -
      Remaining Estimate 0 minutes [ 0 ] 1 hour [ 3600 ]
      Time Spent 2 weeks, 1 day, 1 hour [ 320400 ] 2 weeks, 1 day [ 316800 ]
      Worklog Id 276334 [ 276334 ]
      Jharna Thakur made changes -
      Time Spent 2 weeks, 6 hours [ 309600 ] 2 weeks, 1 day, 1 hour [ 320400 ]
      Worklog Id 276334 [ 276334 ]
      Jharna Thakur made changes -
      Time Spent 2 weeks, 1 hour [ 291600 ] 2 weeks, 6 hours [ 309600 ]
      Worklog Id 276333 [ 276333 ]
      Indrasan Yadav made changes -
      Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
      Hide
      Indrasan Yadav added a comment - - edited

      Dear @Jharna Thakur,

      Please find the below XML validation feedback as described below:

      XML File: 2025-09-02-04.57.45_Ooredoo

      1- In csv “npsran-bs” why radio antenna id is parsing somewhere and somewhere not? under header element node id? Radio antenna id should be not parsed here.
      2- In csv “radio antenna” name is coming blank for around 720 antennas below is snippet for your reference.
      And, antenna id is also not correct, for example I am sharing below for node N_MenzelBouzelfa_NAB1027 which is parsing as role2g, in dump antenna is blank so no need to parse it.

      and the same node which is with MBTS should be parse here in antenna as antenna data is available in dump.

      3- Radio antenna is not parsing for many nodes in which below example is sharing for your reference. (antenna list attached where it is parsing incorrect)

      Site id is also not defined against this above radio antenna id.

      4- Header manufacturer is missing in nodecabinet.

      5- In node boards double header regarding serial is again appearing which was fixed in earlier xml.

      6- Under csv “addinfo” ADJ/ASSOCIATION is not making for RNC node RNCSOS53 while logical dump is available.
      7- BTS is not defined in XML against cell in csv “npscell”

      8- NodeB is not defined in XML in csv “npsthreegcell”

      9- eNodeB is not defined in XML under csv “ltecell” & “enodebbandwidths”.

      10- In csv “IP Data” duplicate values are parsing, below is an example for your reference.

      11- In CSV "nodeboard" please check for sample node "MBTS-RTE_MEDNINIE_BG_MED1132" where 3 PSU board name are available in dump but only 2 are parsing in xml. (Total boards in dump are 70 where 43 are with unique serial 24 are with duplicate serial and 3 PSU are without serial so finally 43+12+3=58 boards should be parse as 12 duplicate will be removed)

      Please check email where i have shared all feedback with required snippet.

      Thank you
      Indrasan

      Show
      Indrasan Yadav added a comment - - edited Dear @Jharna Thakur, Please find the below XML validation feedback as described below: XML File: 2025-09-02-04.57.45_Ooredoo 1- In csv “npsran-bs” why radio antenna id is parsing somewhere and somewhere not? under header element node id? Radio antenna id should be not parsed here. 2- In csv “radio antenna” name is coming blank for around 720 antennas below is snippet for your reference. And, antenna id is also not correct, for example I am sharing below for node N_MenzelBouzelfa_NAB1027 which is parsing as role2g, in dump antenna is blank so no need to parse it. and the same node which is with MBTS should be parse here in antenna as antenna data is available in dump. 3- Radio antenna is not parsing for many nodes in which below example is sharing for your reference. (antenna list attached where it is parsing incorrect) Site id is also not defined against this above radio antenna id. 4- Header manufacturer is missing in nodecabinet. 5- In node boards double header regarding serial is again appearing which was fixed in earlier xml. 6- Under csv “addinfo” ADJ/ASSOCIATION is not making for RNC node RNCSOS53 while logical dump is available. 7- BTS is not defined in XML against cell in csv “npscell” 8- NodeB is not defined in XML in csv “npsthreegcell” 9- eNodeB is not defined in XML under csv “ltecell” & “enodebbandwidths”. 10- In csv “IP Data” duplicate values are parsing, below is an example for your reference. 11- In CSV "nodeboard" please check for sample node "MBTS-RTE_MEDNINIE_BG_MED1132" where 3 PSU board name are available in dump but only 2 are parsing in xml. (Total boards in dump are 70 where 43 are with unique serial 24 are with duplicate serial and 3 PSU are without serial so finally 43+12+3=58 boards should be parse as 12 duplicate will be removed) Please check email where i have shared all feedback with required snippet. Thank you Indrasan
      Jharna Thakur made changes -
      Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
      Hide
      Jharna Thakur added a comment -

      xml shared

      Show
      Jharna Thakur added a comment - xml shared
      Indrasan Yadav logged work - 03/Sep/25 12:00 AM - edited
      • Time Spent:
        6 hours
         

        Completed the XML validation of Huawei RAN and share the feedback to #Jharna.

      Indrasan Yadav made changes -
      Time Spent 1 week, 4 days, 5 hours, 30 minutes [ 279000 ] 2 weeks, 1 hour [ 291600 ]
      Worklog Id 276252 [ 276252 ]
      Hide
      Indrasan Yadav added a comment -

      Hi Jharna Thakur,

      During the initial validation at node level, I found that 110 "GSMBTS" nodes are not parsing in role2g as per the defined rules. However, the duplicate MBTS SRAN nodes are parsing correctly. I have shared the detailed list with you over Teams—please review and confirm.

      For the remaining data validation, I am continuing with the XML validation and will confirm once it is complete.

      Show
      Indrasan Yadav added a comment - Hi Jharna Thakur , During the initial validation at node level, I found that 110 "GSMBTS" nodes are not parsing in role2g as per the defined rules. However, the duplicate MBTS SRAN nodes are parsing correctly. I have shared the detailed list with you over Teams—please review and confirm. For the remaining data validation, I am continuing with the XML validation and will confirm once it is complete.
      Jharna Thakur logged work - 02/Sep/25 12:00 AM - edited
      • Time Spent:
        2 hours
         

        working on feedback and testing

      Indrasan Yadav logged work - 02/Sep/25 12:00 AM
      • Time Spent:
        3 hours, 30 minutes
         

        partially XML validation for Huawei RAN as latest xml shared by @Jharna after fixing the given issues.

      Indrasan Yadav made changes -
      Remaining Estimate 1 hour [ 3600 ] 0 minutes [ 0 ]
      Time Spent 1 week, 4 days, 30 minutes [ 261000 ] 1 week, 4 days, 5 hours, 30 minutes [ 279000 ]
      Worklog Id 276124 [ 276124 ]
      Indrasan Yadav made changes -
      Worklog Id 276116 [ 276116 ]
      Indrasan Yadav made changes -
      Worklog Id 276116 [ 276116 ]
      Indrasan Yadav made changes -
      Remaining Estimate 0 minutes [ 0 ] 1 hour [ 3600 ]
      Time Spent 1 week, 4 days, 1 hour, 30 minutes [ 264600 ] 1 week, 4 days, 30 minutes [ 261000 ]
      Worklog Id 276116 [ 276116 ]
      Indrasan Yadav made changes -
      Time Spent 1 week, 3 days, 4 hours [ 244800 ] 1 week, 4 days, 1 hour, 30 minutes [ 264600 ]
      Worklog Id 276116 [ 276116 ]
      Hide
      Jharna Thakur added a comment -

      xml shared

      Show
      Jharna Thakur added a comment - xml shared
      Hide
      Bassem Sabbagh added a comment -

      XML to be delivered by today EOD

      Show
      Bassem Sabbagh added a comment - XML to be delivered by today EOD
      Indrasan Yadav made changes -
      Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
      Hide
      Indrasan Yadav added a comment -

      Hi Jharna Thakur,

      as discussed please fix the issue as details shared over an email, and I will confirm once full Huawei RAN XML validation will be completed.

      Show
      Indrasan Yadav added a comment - Hi Jharna Thakur , as discussed please fix the issue as details shared over an email, and I will confirm once full Huawei RAN XML validation will be completed.
      Jharna Thakur logged work - 01/Sep/25 12:00 AM
      • Time Spent:
        5 hours
         

        working on feedbacks

      Indrasan Yadav logged work - 01/Sep/25 12:00 AM
      • Time Spent:
        5 hours
         

        Logical data validation completed for Huawei RAN and shared feedback to @Jharna for the same.

      Indrasan Yadav logged work - 29/Aug/25 12:00 AM - edited
      • Time Spent:
        4 hours, 30 minutes
         

        Worked on full XML validation for node level & related physical data which was shared by @Jharna after fixing the raised issues. and taken a teams call with her and explain the issues.

      Jharna Thakur made changes -
      Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
      Hide
      Jharna Thakur added a comment -

      xml shared

      Show
      Jharna Thakur added a comment - xml shared
      Hide
      Bassem Sabbagh added a comment -

      XML to be shared shortly on 25-8

      Show
      Bassem Sabbagh added a comment - XML to be shared shortly on 25-8
      Indrasan Yadav made changes -
      Time Spent 1 week, 3 days, 3 hours, 30 minutes [ 243000 ] 1 week, 3 days, 4 hours [ 244800 ]
      Worklog Id 275248 [ 275248 ]
      Hide
      Bassem Sabbagh added a comment -

      delayed and to be delivered on 25-8 the first half

      Show
      Bassem Sabbagh added a comment - delayed and to be delivered on 25-8 the first half
      Jharna Thakur made changes -
      Time Spent 1 week, 2 days, 3 hours, 30 minutes [ 214200 ] 1 week, 3 days, 3 hours, 30 minutes [ 243000 ]
      Worklog Id 275206 [ 275206 ]
      Jharna Thakur made changes -
      Time Spent 1 week, 1 day, 3 hours, 30 minutes [ 185400 ] 1 week, 2 days, 3 hours, 30 minutes [ 214200 ]
      Worklog Id 275205 [ 275205 ]
      Jharna Thakur made changes -
      Time Spent 1 week, 1 day, 30 minutes [ 174600 ] 1 week, 1 day, 3 hours, 30 minutes [ 185400 ]
      Worklog Id 275204 [ 275204 ]
      Indrasan Yadav logged work - 22/Aug/25 12:00 AM
      • Time Spent:
        30 minutes
         

        Explain the site id parsing rule to @Jharna.

      Hide
      Bassem Sabbagh added a comment -

      WIP and might be delivered by 22-8

      Show
      Bassem Sabbagh added a comment - WIP and might be delivered by 22-8
      Jharna Thakur logged work - 21/Aug/25 12:00 AM
      • Time Spent:
        1 day
         

        working on feedbacks

      Hide
      Bassem Sabbagh added a comment -

      WIP and started on 20-8

      Show
      Bassem Sabbagh added a comment - WIP and started on 20-8
      Hide
      Jharna Thakur added a comment -

      WL: 3-4 Days

      Show
      Jharna Thakur added a comment - WL: 3-4 Days
      Jharna Thakur logged work - 20/Aug/25 12:00 AM
      • Time Spent:
        1 day
         

        working on feedback for 4h after working on running all the connectors through command line

      Hide
      Bassem Sabbagh added a comment -

      WIP and WL to be added by Jharna

      Show
      Bassem Sabbagh added a comment - WIP and WL to be added by Jharna
      Jharna Thakur logged work - 19/Aug/25 12:00 AM
      • Time Spent:
        3 hours
         

        issue identification and changes

      Indrasan Yadav made changes -
      Time Spent 1 week, 30 minutes [ 145800 ] 1 week, 1 day, 30 minutes [ 174600 ]
      Worklog Id 274725 [ 274725 ]
      Indrasan Yadav made changes -
      Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
      Hide
      Indrasan Yadav added a comment -

      Hi Jharna,

      XML validation has been completed & remarks shared over an email.

      Please check and fix the same.

      Show
      Indrasan Yadav added a comment - Hi Jharna, XML validation has been completed & remarks shared over an email. Please check and fix the same.
      Indrasan Yadav logged work - 18/Aug/25 12:00 AM
      • Time Spent:
        1 day
         

        XML validation done and remarks shared to @Jharna over an email.

      Indrasan Yadav made changes -
      Time Spent 4 days, 5 hours [ 133200 ] 1 week, 30 minutes [ 145800 ]
      Worklog Id 274555 [ 274555 ]
      Indrasan Yadav made changes -
      Time Spent 4 days [ 115200 ] 4 days, 5 hours [ 133200 ]
      Worklog Id 274551 [ 274551 ]
      Indrasan Yadav logged work - 14/Aug/25 12:00 AM
      • Time Spent:
        5 hours
         

        full XML validation of Huawei RAN based on dump received from Ooredoo.

      Indrasan Yadav logged work - 13/Aug/25 12:00 AM
      • Time Spent:
        3 hours, 30 minutes
         

        XML validation for Huawei RAN based on dump received from Ooredoo. (Around 3230 physical nodes & 10-12 logical nodes)

      Jharna Thakur made changes -
      Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
      Indrasan Yadav made changes -
      Time Spent 3 days, 7 hours [ 111600 ] 4 days [ 115200 ]
      Worklog Id 273734 [ 273734 ]
      Hide
      Jharna Thakur added a comment -

      xml shared

      Show
      Jharna Thakur added a comment - xml shared
      Bassem Sabbagh made changes -
      Assignee Bassem Sabbagh [ bsabbagh ] Jharna Thakur [ jthakur ]
      Bassem Sabbagh made changes -
      Status Opened [ 1 ] In Progress [ 3 ]
      Assignee Jharna Thakur [ jthakur ] Bassem Sabbagh [ bsabbagh ]
      Hide
      Bassem Sabbagh added a comment -

      XML generation in progress ..

      Show
      Bassem Sabbagh added a comment - XML generation in progress ..
      Indrasan Yadav made changes -
      Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
      Hide
      Indrasan Yadav added a comment -

      Hi Jharna Thakur

      As discussed please generate XML for Huawei_RAN based on dump which I have attached here.

      Show
      Indrasan Yadav added a comment - Hi Jharna Thakur As discussed please generate XML for Huawei_RAN based on dump which I have attached here.
      Indrasan Yadav made changes -
      Indrasan Yadav logged work - 06/Aug/25 12:00 AM
      • Time Spent:
        1 hour
         

        Compile the latest dump & share it to @Jharna to generate the XML.

      Indrasan Yadav made changes -
      Status In Progress [ 3 ] Opened [ 1 ]
      Indrasan Yadav made changes -
      Time Spent 3 days, 5 hours, 30 minutes [ 106200 ] 3 days, 7 hours [ 111600 ]
      Worklog Id 268805 [ 268805 ]
      Indrasan Yadav made changes -
      Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
      Indrasan Yadav made changes -
      Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
      Hide
      Bassem Sabbagh added a comment -

      XML is ok for eNodeB

      Show
      Bassem Sabbagh added a comment - XML is ok for eNodeB
      Bassem Sabbagh made changes -
      Summary Huawei RAN Connector Creation/Update In S-DB Huawei RAN XML Validation
      Hide
      Bassem Sabbagh added a comment -

      some values are hard coded and should be configurable ,,,, the WL is 1 day

      Show
      Bassem Sabbagh added a comment - some values are hard coded and should be configurable ,,,, the WL is 1 day
      Jharna Thakur made changes -
      Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
      Hide
      Jharna Thakur added a comment -

      xml shared

      Show
      Jharna Thakur added a comment - xml shared
      Jharna Thakur made changes -
      Time Spent 2 days, 5 hours, 30 minutes [ 77400 ] 3 days, 5 hours, 30 minutes [ 106200 ]
      Worklog Id 268709 [ 268709 ]
      Indrasan Yadav logged work - 04/Jun/25 12:00 AM
      • Time Spent:
        1 hour, 30 minutes
         

        Sample xml validation for Huawei, still some data not fixed but it will be check & confirm based on full xml.

      Indrasan Yadav made changes -
      Time Spent 2 days, 3 hours, 30 minutes [ 70200 ] 2 days, 5 hours, 30 minutes [ 77400 ]
      Worklog Id 268616 [ 268616 ]
      Hide
      Bassem Sabbagh added a comment -

      Driss support is required for one issue (maybe related to common code)

      Show
      Bassem Sabbagh added a comment - Driss support is required for one issue (maybe related to common code)
      Indrasan Yadav made changes -
      Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
      Indrasan Yadav made changes -
      Hide
      Indrasan Yadav added a comment -

      Hi Jharna, as discussed please check the highlighted issue which I shared over an email in details.

      File name: Ooredoo Tunisia Sample XML Validation_Huawei __ OT-17 __

      Show
      Indrasan Yadav added a comment - Hi Jharna, as discussed please check the highlighted issue which I shared over an email in details. File name: Ooredoo Tunisia Sample XML Validation_Huawei __ OT-17 __
      Indrasan Yadav logged work - 03/Jun/25 12:00 AM
      • Time Spent:
        2 hours
         

        XML validation and feedback reverted to @Jharna.

      Jharna Thakur made changes -
      Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
      Hide
      Jharna Thakur added a comment -

      xml shared yesterday

      Show
      Jharna Thakur added a comment - xml shared yesterday
      Indrasan Yadav made changes -
      Time Spent 2 days, 1 hour, 30 minutes [ 63000 ] 2 days, 3 hours, 30 minutes [ 70200 ]
      Worklog Id 268324 [ 268324 ]
      Indrasan Yadav made changes -
      Attachment OT_Huawei_RAN_All Nodes_Physical_Inventory.docx [ 109006 ]
      Indrasan Yadav made changes -
      Hide
      Bassem Sabbagh added a comment -

      XML to be shared on 29-5 with new FRS change

      Show
      Bassem Sabbagh added a comment - XML to be shared on 29-5 with new FRS change
      Jharna Thakur logged work - 29/May/25 12:00 AM
      • Time Spent:
        1 day
         

        working on feedback

      Indrasan Yadav logged work - 29/May/25 12:00 AM
      • Time Spent:
        2 hours
         

        Analysed and given rule to parse "Start RU" in "nodeshelf" to @Jharna. (Given rule as per available in OmanTel)

      Bassem Sabbagh made changes -
      Assignee Bassem Sabbagh [ bsabbagh ] Jharna Thakur [ jthakur ]
      Bassem Sabbagh made changes -
      Status Opened [ 1 ] In Progress [ 3 ]
      Assignee Jharna Thakur [ jthakur ] Bassem Sabbagh [ bsabbagh ]
      Jharna Thakur made changes -
      Time Spent 1 day, 5 hours, 30 minutes [ 48600 ] 2 days, 1 hour, 30 minutes [ 63000 ]
      Worklog Id 268000 [ 268000 ]
      Hide
      Bassem Sabbagh added a comment -

      No rule in FRS to parse StartRU and Indrasan has to update the FRS

      Show
      Bassem Sabbagh added a comment - No rule in FRS to parse StartRU and Indrasan has to update the FRS
      Hide
      Jharna Thakur added a comment -

      Indrasan Yadav as discussed kindly add the rule for attribute value StartRU in nodeshelf csv.

      Show
      Jharna Thakur added a comment - Indrasan Yadav as discussed kindly add the rule for attribute value StartRU in nodeshelf csv.
      Jharna Thakur logged work - 26/May/25 12:00 AM
      • Time Spent:
        4 hours
         

        code modification based on feedback

      Hide
      Jharna Thakur added a comment -

      During our analysis, it has been observed that the existing Huawei RAN connector does not parse the board type "Fmodule" specifically. Adding parsing logic specifically for the "Fmodule" board type may potentially impact existing functionalities of existing the connector. A similar concern applies to the "StartRu" value within the node shelf structure, where modifications might interfere with the current processing logic.

      Show
      Jharna Thakur added a comment - During our analysis, it has been observed that the existing Huawei RAN connector does not parse the board type "Fmodule" specifically. Adding parsing logic specifically for the "Fmodule" board type may potentially impact existing functionalities of existing the connector. A similar concern applies to the "StartRu" value within the node shelf structure, where modifications might interfere with the current processing logic.
      Jharna Thakur made changes -
      Time Spent 1 day, 1 hour, 30 minutes [ 34200 ] 1 day, 5 hours, 30 minutes [ 48600 ]
      Worklog Id 267603 [ 267603 ]
      Jharna Thakur made changes -
      Time Spent 1 hour, 30 minutes [ 5400 ] 1 day, 1 hour, 30 minutes [ 34200 ]
      Worklog Id 267602 [ 267602 ]
      Hide
      Jharna Thakur added a comment -

      Wl-1.5 days

      Show
      Jharna Thakur added a comment - Wl-1.5 days
      Hide
      Bassem Sabbagh added a comment -

      Jharna to check and advise about the WL

      Show
      Bassem Sabbagh added a comment - Jharna to check and advise about the WL
      Indrasan Yadav made changes -
      Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
      Hide
      Indrasan Yadav added a comment -

      Validation Remarks (Based on One Sample Dump):

      1- The value BoardType="FModule" is currently not being parsed. This issue may be related to the use of a connector for OmanTel. As a reference, we encountered a similar issue with OmanTel previously, but successfully parsed "FModule" in ZAIN-KSA. As confirmed with Bassem Sabbagh, we will ensure "FModule" is parsed correctly for Ooredoo Tunisia.

      2- The value BoardType="WD2MUMDUa3" is also not being parsed and should be addressed.

      3- The attribute ru="-1" is appearing under the nodeshelf element, which is incorrect, as the value should not be negative.

      4- The npssite element contains an excessive amount of information, although only one sample node is utilizing it. This should be streamlined accordingly.

      Show
      Indrasan Yadav added a comment - Validation Remarks (Based on One Sample Dump): 1- The value BoardType="FModule" is currently not being parsed. This issue may be related to the use of a connector for OmanTel. As a reference, we encountered a similar issue with OmanTel previously, but successfully parsed "FModule" in ZAIN-KSA. As confirmed with Bassem Sabbagh , we will ensure "FModule" is parsed correctly for Ooredoo Tunisia. 2- The value BoardType="WD2MUMDUa3" is also not being parsed and should be addressed. 3- The attribute ru="-1" is appearing under the nodeshelf element, which is incorrect, as the value should not be negative. 4- The npssite element contains an excessive amount of information, although only one sample node is utilizing it. This should be streamlined accordingly.
      Indrasan Yadav made changes -
      Baseline Start 2025-05-30 24:00 (set baseline based of initial work logging)
      Baseline End 2025-05-30 24:00 (set baseline based of initial work logging)
      Indrasan Yadav made changes -
      Remaining Estimate 0 minutes [ 0 ]
      Time Spent 1 hour, 30 minutes [ 5400 ]
      Worklog Id 267221 [ 267221 ]
      Bassem Sabbagh made changes -
      Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
      Hide
      Bassem Sabbagh added a comment -

      for available dump sample ... the XML has been shared and to be validated

      Show
      Bassem Sabbagh added a comment - for available dump sample ... the XML has been shared and to be validated
      Hide
      Jharna Thakur added a comment -

      xml shared, Indrasan Yadav kindly let me know the issues if found

      Show
      Jharna Thakur added a comment - xml shared, Indrasan Yadav kindly let me know the issues if found
      Jharna Thakur made changes -
      Comment [ XML shared, [~iyadav] Kindly let me know the issues in it ]
      Jharna Thakur logged work - 16/May/25 12:00 AM
      • Time Spent:
        4 hours
         

        testing

      Indrasan Yadav logged work - 16/May/25 12:00 AM
      • Time Spent:
        1 hour, 30 minutes
         

        XML validation which was shared by @Jharna over teams. and share validation remarks.

      Jharna Thakur logged work - 15/May/25 12:00 AM
      • Time Spent:
        1 day
         

        requirement review and code modification

      Indrasan Yadav made changes -
      Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
      Hide
      Indrasan Yadav added a comment -

      Based on comment provided in JIRA OT-3, I created this JIRA OT-17 and assigning to Jharna Thakur for connector creation/update in S-DB.
      (All require FRS is attaching here for reference)

      Show
      Indrasan Yadav added a comment - Based on comment provided in JIRA OT-3 , I created this JIRA OT-17 and assigning to Jharna Thakur for connector creation/update in S-DB. (All require FRS is attaching here for reference)
      Indrasan Yadav made changes -
      Attachment OT_Huawei_RAN_2G_Logical_Inventory & Interfaces.docx [ 109003 ]
      Attachment OT_Huawei_RAN_3G_Logical_Inventory & Interfaces.docx [ 109004 ]
      Attachment OT_Huawei_RAN_4G_Logical_Inventory & Interfaces.docx [ 109005 ]
      Attachment OT_Huawei_RAN_All Nodes_Physical_Inventory.docx [ 109006 ]
      Indrasan Yadav made changes -
      Field Original Value New Value
      Gantt Options Milestone (set to milestone: having a due date but zero effort)
      Planned Start 2025-05-30 24:00 (milestone: set planned start date to due date)
      Planned End 2025-05-30 24:00 (milestone: set planned end date to due date)

        People

        • Assignee:
          Indrasan Yadav
          Reporter:
          Indrasan Yadav
        • Votes:
          0 Vote for this issue
          Watchers:
          4 Start watching this issue

          Dates

          • Due:
            Created:
            Updated:
            Resolved:
            Planned Start:
            Planned End:
            Actual Start:
            Date of Baselining:

            Time Tracking

            Estimated:
            Original Estimate - Not Specified
            Not Specified
            Remaining:
            Remaining Estimate - 0 minutes
            0m
            Logged:
            Time Spent - 3 weeks, 1 day, 7 hours, 24 minutes
            3w 1d 7h 24m