Details
-
Type:
Task
-
Status:
Closed
(View Workflow)
-
Priority:
Normal
-
Resolution: Done
-
Labels:
-
Customer:Ooreedo Tunisia
Activity
- All
- Comments
- Work Log
- History
- Activity
- Links Hierarchy
- Transitions
- Trace
-
- Time Spent:
- 3 hours
-
Sample xml shared by @Sandya which was generated on Azerconnect because it couldn't generated on Airtel so validate the same and tried to check is it parsing based on given rule in FRS or not?
-
- Time Spent:
- 1 hour
-
Discussed with @Sandya over teams to explain rule in FRS.
-
- Time Spent:
- 2 hours, 30 minutes
-
Sample XML validation and feedback reverted to @Sandya.
-
- Time Spent:
- 4 hours
-
Checked XML of sample nodes there were many disputes, remarks shared to @Sandya to check & fix the same.
-
- Time Spent:
- 1 day
-
XML validation (physical & logical) for sample nodes.
Still many issues are not fix, feedback shared to @Sandya to check and fix the same.
-
- Time Spent:
- 3 hours, 30 minutes
-
XML validation and discussion with Sandya to check & fix the issue as per rule given in FRS.
-
- Time Spent:
- 1 hour
-
XML validation for some cases regarding physical level, as Sandya shared me after fixing the same.
-
- Time Spent:
- 1 hour
-
Validate the XML for physical & site with default.
-
- Time Spent:
- 3 hours
-
XML validation for logical data as @Sandya shared xml.
-
- Time Spent:
- 2 hours, 30 minutes
-
Validated the xml for logical data.
Taken a call with @Sandhya to explain rule for addinfo
Discussed with @Sandhya for logical data parsing.
-
- Time Spent:
- 1 hour, 30 minutes
-
Discussed with @Sandhya & consolidate a list of all pending issues of Nokia RAN and share to her over an email as her laptop was crashed so for her reference it was shared again.
-
- Time Spent:
- 5 hours, 30 minutes
-
Discussed with @Sandhya & explain her about rule to parse Antenna for NodeB & parent eNodeB missing in CSV ltecells against cell id. and validated the sample XML as she shared. and take a call over teams to explain rule to parse logical data like IP/Mask.
-
- Time Spent:
- 2 hours
-
Taken a multiple call with @Sandhya to explain her rule about below:
1- Antenna parsing for NodeB (Still parsing incorrect)
2- IP parsing for SRAN
3- Frequency/Bandwidth parsing for 2G/3G/4G cell (Still parsing incorrect)and validated the sample xml as she shared me over teams.
-
- Time Spent:
- 2 hours
-
XML validation
-
- Time Spent:
- 4 hours
-
work on the anteena issue.
-
- Time Spent:
- 6 hours
-
Complete XML validation for Nokia RAN and share the feedback to @Sandya over an email.
-
- Time Spent:
- 3 hours
-
Discussed with @Sandya and explain the raised issues and validated the xml for some major issues like site id parsing of node BSC/RNC and role3g data is parsing now and role4g node name is parsing correctly.
-
- Time Spent:
- 2 hours
-
Validate the xml for partial issues fixed by @Sandya, and share feedback to her over teams. and discussed with her for remaining issues & explain her in details.
-
- Time Spent:
- 1 hour, 30 minutes
-
Multiple time attended a teams call with Sandya to check & discussed the raised issue and validate the same.
-
- Time Spent:
- 1 day, 1 hour
-
work on the issue
-
- Time Spent:
- 4 hours, 30 minutes
-
Sandya called to discuss and know about issues & data parsing. she fixed the BSC IP parsing and I validated the XML for same and other issues as well.
-
- Time Spent:
- 6 hours, 30 minutes
-
work on the issue
-
- Time Spent:
- 6 hours
-
Nokia RAN XML validation which is shared by @Sandya for raised issues. (Ltecell/nodeinterfaces-RNC/gateway for RNC) are still not fixed.
-
- Time Spent:
- 4 hours
-
Partial XML validation for 5G data parsing as shared by @Sandya, but she didn't uploaded related CSV on staging DB as per her it will take time. (1st she shared me staging db tables which has less count I confirmed with her she told me it is only for 5G, then she shared me again full XML including 5G)
-
- Time Spent:
- 4 hours, 30 minutes
-
Validated the full XML as shared by @Sandya including 5G nodes & it's related physical data.
-
- Time Spent:
- 2 hours
-
AI 4.0.0.25 patch deployed on 102 platform
-
- Time Spent:
- 1 hour
-
shared csv folder to AI team from 102.
-
- Time Spent:
- 4 hours
-
added code for 5g in csv to db
-
- Time Spent:
- 1 hour
-
I uploaded the csv_output in staging DB.
-
- Time Spent:
- 5 hours
-
XML validation through CSV as still CSV output is not properly or still not uploaded there.
and attended multiple teams call with Sandya to discuss & explain the issues and checked parallely.
-
- Time Spent:
- 4 hours
-
XML validation for logical data and feedback discussed & shared to Sandya and update the comment on jira.
-
- Time Spent:
- 1 hour
-
I have uploaded the csv_output provided by you in SD. The data is reflecting in Node_Cabinet, Batch_Node_Shelf, and Node_Interface as I have checked.
-
- Time Spent:
- 2 hours
-
Started XML/CSV Output validation for Nokia RAN.
-
- Time Spent:
- 1 hour
-
I have uploaded the csv_output provided by Sandya into SD
-
- Time Spent:
- 5 hours
-
Nokia RAN xml validation based on CSV-Output. in meantime imported the same XML on .102 and the error was appeared during saving data, an email send to Integration to check & share server logs for the same.
-
- Time Spent:
- 1 hour, 30 minutes
-
I was validating Nokia RAN XML from CSV-Output as there is require tables are still not created in staging-DB. but as Bassem suggested I need to validate it only on staging-DB so stop the validation work. (I will start data validation on S-DB once AI patch released & deployed for created tables.
-
- Time Spent:
- 3 hours
-
Attempted a teams call with Sandya, and initiated the check & validate the XML which was shared by her. I will check & confirm about status once import the same XML in NEP and data validated.