Details

    • Customer:
      Ooreedo Tunisia

      Description

      Dear @Bassem Sabbagh,

      As discussed earlier, and as per the inputs shared in the first email of this thread, for Huawei RAN we are currently using five static sheets, with the status detailed below:

      Huawei RAN – Static Sheets Status
      1. GSM_Frequency_Band
      o This will be considered as-is based on the Ooredoo dump.
      o All extra/non-applicable data has been removed.
      o I have updated the static sheet as well as the FRS and attached them to JIRA OT-139.
      2. UMTS_Frequency_Band
      o Priority: Rule-based parsing as per FRS.
      o If the value is not found via rule, the static sheet will be used as fallback.
      o The required updates have been completed and attached to JIRA OT-139.
      3. Supported_Bandwidth
      o Although this sheet was earlier considered for parsing possible bandwidths based on the value of frequency band,
      o We already have FRS rules to parse:
       Uplink channel bandwidth
       Downlink channel bandwidth
       Frequency band
      o Hence, this static sheet will be ignored, and parsing will strictly follow the FRS rules.
      4. Node_Matching
      o This sheet is updated & removed all extra data which is not applicable for Ooredoo based on available dump. (Attached on same JIRA OT-139)
      o Updated the FRS for same.
      5. HW_Matching
      o In progress.
      o Will be shared by tomorrow EOD.

      Please assign an AI-DEV resource to implement this change in Huawei RAN.

      Best regards,
      Indrasan

      1. GSM_Frequency_Band.xlsx
        10 kB
        Indrasan Yadav
      2. HW_MatchingFile.xlsx
        31 kB
        Indrasan Yadav
      3. Nodes_Matching.xls
        29 kB
        Indrasan Yadav
      4. OT_Huawei_RAN_2G_Logical & Interfaces.docx
        822 kB
        Indrasan Yadav
      5. OT_Huawei_RAN_3G_Logical & Interfaces.docx
        1.59 MB
        Indrasan Yadav
      6. OT_Huawei_RAN_4G_Logical & Interfaces_20-01-2026.docx
        382 kB
        Indrasan Yadav
      7. OT_Huawei_RAN All Nodes_Physical.docx
        1.67 MB
        Indrasan Yadav
      8. UTMS_Frequency_Band.xlsx
        10 kB
        Indrasan Yadav

        Activity

        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Opened Opened In Progress In Progress
        19d 21h 24m 1 Bassem Sabbagh 09/Feb/26 7:31 AM
        In Progress In Progress Opened Opened
        1d 22h 5m 1 Indrasan Yadav 11/Feb/26 5:36 AM
        Opened Opened Resolved Resolved
        14s 1 Indrasan Yadav 11/Feb/26 5:37 AM
        Closed Closed Reopened Reopened
        16h 9m 1 Indrasan Yadav 12/Feb/26 4:20 AM
        Reopened Reopened Resolved Resolved
        3m 6s 1 Indrasan Yadav 12/Feb/26 4:23 AM
        Resolved Resolved Closed Closed
        6h 34m 2 Indrasan Yadav 12/Feb/26 4:24 AM

          People

          • Assignee:
            Indrasan Yadav
            Reporter:
            Indrasan Yadav
          • Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Actual End:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Time Spent - 1 week, 4 days, 7 hours, 50 minutes Remaining Estimate - 5 hours
              5h
              Logged:
              Time Spent - 1 week, 4 days, 7 hours, 50 minutes Remaining Estimate - 5 hours
              1w 4d 7h 50m