    • Customer:
      Ooreedo Tunisia

      Description

      Dear @Bassem Sabbagh,

      As discussed earlier, and as per the inputs shared in the first email of this thread, for Huawei RAN we are currently using five static sheets, with the status detailed below:

      Huawei RAN – Static Sheets Status
      1. GSM_Frequency_Band
      o This will be considered as-is based on the Ooredoo dump.
      o All extra/non-applicable data has been removed.
      o I have updated the static sheet as well as the FRS and attached them to JIRA OT-139.
      2. UMTS_Frequency_Band
      o Priority: Rule-based parsing as per FRS.
      o If the value is not found via rule, the static sheet will be used as fallback.
      o The required updates have been completed and attached to JIRA OT-139.
      3. Supported_Bandwidth
      o Although this sheet was earlier considered for parsing possible bandwidths based on the value of frequency band,
      o We already have FRS rules to parse:
       Uplink channel bandwidth
       Downlink channel bandwidth
       Frequency band
      o Hence, this static sheet will be ignored, and parsing will strictly follow the FRS rules.
      4. Node_Matching
      o This sheet is updated & removed all extra data which is not applicable for Ooredoo based on available dump. (Attached on same JIRA OT-139)
      o Updated the FRS for same.
      5. HW_Matching
      o In progress.
      o Will be shared by tomorrow EOD.

      Please assign an AI-DEV resource to implement this change in Huawei RAN.

      Best regards,
      Indrasan

      1. GSM_Frequency_Band.xlsx
        10 kB
        Indrasan Yadav
      2. HW_MatchingFile.xlsx
        31 kB
        Indrasan Yadav
      3. Nodes_Matching.xls
        29 kB
        Indrasan Yadav
      4. OT_Huawei_RAN_2G_Logical & Interfaces.docx
        822 kB
        Indrasan Yadav
      5. OT_Huawei_RAN_3G_Logical & Interfaces.docx
        1.59 MB
        Indrasan Yadav
      6. OT_Huawei_RAN_4G_Logical & Interfaces_20-01-2026.docx
        382 kB
        Indrasan Yadav
      7. OT_Huawei_RAN All Nodes_Physical.docx
        1.67 MB
        Indrasan Yadav
      8. UTMS_Frequency_Band.xlsx
        10 kB
        Indrasan Yadav

        Activity

        Subversion JIRA

        Links Hierarchy

         Documentation

        Invalid license: EXPIRED

        Transition Time In Source Status Execution Times Last Executer Last Execution Date
        Opened Opened In Progress In Progress
        19d 21h 24m 1 Bassem Sabbagh 09/Feb/26 7:31 AM
        In Progress In Progress Opened Opened
        1d 22h 5m 1 Indrasan Yadav 11/Feb/26 5:36 AM
        Opened Opened Resolved Resolved
        14s 1 Indrasan Yadav 11/Feb/26 5:37 AM
        Closed Closed Reopened Reopened
        16h 9m 1 Indrasan Yadav 12/Feb/26 4:20 AM
        Reopened Reopened Resolved Resolved
        3m 6s 1 Indrasan Yadav 12/Feb/26 4:23 AM
        Resolved Resolved Closed Closed
        6h 34m 2 Indrasan Yadav 12/Feb/26 4:24 AM
        Indrasan Yadav made changes -
        Status Resolved [ 5 ] Closed [ 6 ]
        Indrasan Yadav made changes -
        Status Reopened [ 4 ] Resolved [ 5 ]
        Resolution Fixed [ 1 ]
        Indrasan Yadav made changes -
        Remaining Estimate 0 minutes [ 0 ] 5 hours [ 18000 ]
        Time Spent 2 weeks, 4 hours, 50 minutes [ 305400 ] 1 week, 4 days, 7 hours, 50 minutes [ 287400 ]
        Worklog Id 291258 [ 291258 ]
        Indrasan Yadav made changes -
        Worklog Id 291258 [ 291258 ]
        Indrasan Yadav made changes -
        Resolution Fixed [ 1 ]
        Status Closed [ 6 ] Reopened [ 4 ]
        Indrasan Yadav made changes -
        Status Resolved [ 5 ] Closed [ 6 ]
        Indrasan Yadav made changes -
        Time Spent 1 week, 4 days, 5 hours, 50 minutes [ 280200 ] 2 weeks, 4 hours, 50 minutes [ 305400 ]
        Worklog Id 291258 [ 291258 ]
        Indrasan Yadav made changes -
        Status Opened [ 1 ] Resolved [ 5 ]
        Resolution Fixed [ 1 ]
        Indrasan Yadav made changes -
        Status In Progress [ 3 ] Opened [ 1 ]
        Basant Kumar made changes -
        Time Spent 1 week, 4 days, 3 hours, 50 minutes [ 273000 ] 1 week, 4 days, 5 hours, 50 minutes [ 280200 ]
        Worklog Id 291217 [ 291217 ]
        Jharna Thakur made changes -
        Time Spent 1 week, 4 days, 2 hours, 20 minutes [ 267600 ] 1 week, 4 days, 3 hours, 50 minutes [ 273000 ]
        Worklog Id 291208 [ 291208 ]
        Jharna Thakur made changes -
        Time Spent 1 week, 3 days, 6 hours, 35 minutes [ 254100 ] 1 week, 4 days, 2 hours, 20 minutes [ 267600 ]
        Worklog Id 291207 [ 291207 ]
        Indrasan Yadav logged work - 11/Feb/26 12:00 AM - edited
        • Time Spent:
          2 hours
           

          Check data on NEP after imported an xml which was generated from server by integration.

        Indrasan Yadav made changes -
        Remaining Estimate 4 hours [ 14400 ] 0 minutes [ 0 ]
        Time Spent 1 week, 3 days, 1 hour, 35 minutes [ 236100 ] 1 week, 3 days, 6 hours, 35 minutes [ 254100 ]
        Worklog Id 291133 [ 291133 ]
        Hide
        Indrasan Yadav added a comment -

        XML validated & imported in NEP i.e. correct now, code has been committed for same as confirmed with Jharna & same data is also validated on staging-DB.

        Show
        Indrasan Yadav added a comment - XML validated & imported in NEP i.e. correct now, code has been committed for same as confirmed with Jharna & same data is also validated on staging-DB.
        Basant Kumar logged work - 10/Feb/26 12:00 AM
        • Time Spent:
          2 hours
           

          The latest nep_ai_batch_68 has been successfully deployed.

          After deployment, I copied the required sheet into the static folder. Following this, I generated the Huawei RAN XML and CSV successfully.

        Indrasan Yadav logged work - 10/Feb/26 12:00 AM
        • Time Spent:
          5 hours
           

          Validated the same data in staging-DB.

        Indrasan Yadav made changes -
        Remaining Estimate 0 minutes [ 0 ] 4 hours [ 14400 ]
        Time Spent 1 week, 3 days, 5 hours, 35 minutes [ 250500 ] 1 week, 3 days, 1 hour, 35 minutes [ 236100 ]
        Worklog Id 291053 [ 291053 ]
        Indrasan Yadav made changes -
        Time Spent 1 week, 2 days, 6 hours, 5 minutes [ 223500 ] 1 week, 3 days, 5 hours, 35 minutes [ 250500 ]
        Worklog Id 291053 [ 291053 ]
        Hide
        Bassem Sabbagh added a comment -

        XML is shared with Indrasan

        Show
        Bassem Sabbagh added a comment - XML is shared with Indrasan
        Bassem Sabbagh made changes -
        Assignee Bassem Sabbagh [ bsabbagh ] Indrasan Yadav [ iyadav ]
        Bassem Sabbagh made changes -
        Status Opened [ 1 ] In Progress [ 3 ]
        Assignee Jharna Thakur [ jthakur ] Bassem Sabbagh [ bsabbagh ]
        Indrasan Yadav made changes -
        Comment [ Hi Jharna as discussed please commit the code for same. ]
        Indrasan Yadav logged work - 09/Feb/26 12:00 AM - edited
        • Time Spent:
          3 hours, 30 minutes
           

          Validated the updated one XML which was shared by Jharna and now issue is fixed, copy the same on server & imported the same XML. Validated the data in NEP. and shared the require related static sheet to integration to copy it on server and generated the XML/CSV output for Huawei RAN & share the same then upload the csv output on staging-DB & share the importer id.

        Hide
        Indrasan Yadav added a comment -

        As discussed, there is still an issue in the XML where coordinates are missing.

        Kindly please check, fix the issue, and commit the updated code accordingly.

        Show
        Indrasan Yadav added a comment - As discussed, there is still an issue in the XML where coordinates are missing. Kindly please check, fix the issue, and commit the updated code accordingly.
        Indrasan Yadav made changes -
        Time Spent 1 week, 2 days, 3 hours, 35 minutes [ 214500 ] 1 week, 2 days, 6 hours, 5 minutes [ 223500 ]
        Worklog Id 290926 [ 290926 ]
        Hide
        Jharna Thakur added a comment -

        xml shared

        Show
        Jharna Thakur added a comment - xml shared
        Hide
        Bassem Sabbagh added a comment -

        WIP and to be delivered on 6-2

        Show
        Bassem Sabbagh added a comment - WIP and to be delivered on 6-2
        Jharna Thakur logged work - 06/Feb/26 12:00 AM
        • Time Spent:
          1 hour, 30 minutes
           

          working on coordinate issue

        Jharna Thakur logged work - 06/Feb/26 12:00 AM
        • Time Spent:
          3 hours, 45 minutes
           

          working on the feedback

        Indrasan Yadav logged work - 06/Feb/26 12:00 AM
        • Time Spent:
          2 hours, 30 minutes
           

          Followed up with Jharna to share the requested xml and validated it once received & again there is an issue in xml as lat-long was missing so again discussed with her & asked to fix the same..

        Hide
        Indrasan Yadav added a comment -

        Hi Jharna,

        as discussed please correct the site issue & radio antenna then reshare the updated XML.

        Show
        Indrasan Yadav added a comment - Hi Jharna, as discussed please correct the site issue & radio antenna then reshare the updated XML.
        Indrasan Yadav made changes -
        Assignee Indrasan Yadav [ iyadav ] Jharna Thakur [ jthakur ]
        Jharna Thakur made changes -
        Time Spent 1 week, 2 days, 15 minutes [ 202500 ] 1 week, 2 days, 3 hours, 35 minutes [ 214500 ]
        Worklog Id 290722 [ 290722 ]
        Indrasan Yadav made changes -
        Time Spent 1 week, 1 day, 15 minutes [ 173700 ] 1 week, 2 days, 15 minutes [ 202500 ]
        Worklog Id 290717 [ 290717 ]
        Indrasan Yadav logged work - 04/Feb/26 12:00 AM
        • Time Spent:
          1 day
           

          Based on error report changes in catalogue & reimport the same XML and validated the same. and there is some minor points which is raised to Jharna to fix the same and asked to share the XML with CSV Output.

        Indrasan Yadav made changes -
        Time Spent 1 week, 1 hour, 15 minutes [ 148500 ] 1 week, 1 day, 15 minutes [ 173700 ]
        Worklog Id 290516 [ 290516 ]
        Jharna Thakur logged work - 03/Feb/26 12:00 AM
        • Time Spent:
          3 hours, 20 minutes
           

          working on feedback

        Indrasan Yadav logged work - 03/Feb/26 12:00 AM
        • Time Spent:
          7 hours
           

          Changes in catalogue based on new static sheet & then imported the xml and check error report.

        Indrasan Yadav made changes -
        Time Spent 4 days, 2 hours, 15 minutes [ 123300 ] 1 week, 1 hour, 15 minutes [ 148500 ]
        Worklog Id 290445 [ 290445 ]
        Jharna Thakur made changes -
        Assignee Jharna Thakur [ jthakur ] Indrasan Yadav [ iyadav ]
        Indrasan Yadav logged work - 02/Feb/26 12:00 AM
        • Time Spent:
          7 hours
           

          XML validation of Huawei RAN which was shared by Jharna and this XML was generated with using of updated static sheet and there will be need to change in catalogue before import the xml and I have shared an email to Bassem for same.

        Jharna Thakur made changes -
        Time Spent 4 days, 15 minutes [ 116100 ] 4 days, 2 hours, 15 minutes [ 123300 ]
        Worklog Id 290330 [ 290330 ]
        Hide
        Jharna Thakur added a comment -

        xml shared

        Show
        Jharna Thakur added a comment - xml shared
        Jharna Thakur made changes -
        Time Spent 3 days, 4 hours, 30 minutes [ 102600 ] 4 days, 15 minutes [ 116100 ]
        Worklog Id 290307 [ 290307 ]
        Hide
        Bassem Sabbagh added a comment -

        Assigned to Jharna to define the WL

        Show
        Bassem Sabbagh added a comment - Assigned to Jharna to define the WL
        Bassem Sabbagh made changes -
        Assignee Bassem Sabbagh [ bsabbagh ] Jharna Thakur [ jthakur ]
        Jharna Thakur logged work - 30/Jan/26 12:00 AM
        • Time Spent:
          3 hours, 45 minutes
           

          working on feedback

        Indrasan Yadav made changes -
        Remaining Estimate 7 hours [ 25200 ] 0 minutes [ 0 ]
        Time Spent 2 days, 5 hours, 30 minutes [ 77400 ] 3 days, 4 hours, 30 minutes [ 102600 ]
        Worklog Id 290203 [ 290203 ]
        Indrasan Yadav logged work - 29/Jan/26 12:00 AM
        • Time Spent:
          7 hours
           

          Validated the Huawei RAN csv-output which was shared by @Jharna over teams (CSV Output was generated wit using only shared static sheet) and discussed with her to explain about issue and send an email for same.

        Indrasan Yadav made changes -
        Remaining Estimate 7 hours, 30 minutes [ 27000 ] 7 hours [ 25200 ]
        Time Spent 2 days, 5 hours [ 75600 ] 2 days, 5 hours, 30 minutes [ 77400 ]
        Worklog Id 290004 [ 290004 ]
        Jharna Thakur logged work - 28/Jan/26 12:00 AM
        • Time Spent:
          2 hours
           

          small changes regarding it

        Indrasan Yadav logged work - 28/Jan/26 12:00 AM
        • Time Spent:
          30 minutes
           

          Discussed with Jharna & taken the follows up to share the xml with using the given static sheet only.

        Indrasan Yadav made changes -
        Remaining Estimate 0 minutes [ 0 ] 7 hours, 30 minutes [ 27000 ]
        Time Spent 3 days, 4 hours, 30 minutes [ 102600 ] 2 days, 5 hours [ 75600 ]
        Worklog Id 289533 [ 289533 ]
        Worklog Time Spent 7 hours, 30 minutes [ 27000 ]
        Indrasan Yadav made changes -
        Time Spent 2 days, 5 hours [ 75600 ] 3 days, 4 hours, 30 minutes [ 102600 ]
        Worklog Id 289533 [ 289533 ]
        Indrasan Yadav made changes -
        Time Spent 1 day, 5 hours [ 46800 ] 2 days, 5 hours [ 75600 ]
        Worklog Id 289363 [ 289363 ]
        Hide
        Indrasan Yadav added a comment -

        The static sheet “HW_Matching_Sheet” has now been updated and attached, along with the updated FRS for reference.

        Show
        Indrasan Yadav added a comment - The static sheet “HW_Matching_Sheet” has now been updated and attached, along with the updated FRS for reference.
        Indrasan Yadav made changes -
        Attachment OT_Huawei_RAN All Nodes_Physical.docx [ 126620 ]
        Attachment HW_MatchingFile.xlsx [ 126621 ]
        Indrasan Yadav made changes -
        Attachment OT_Huawei_RAN All Nodes_Physical.docx [ 126601 ]
        Indrasan Yadav made changes -
        Assignee Indrasan Yadav [ iyadav ] Bassem Sabbagh [ bsabbagh ]
        Indrasan Yadav made changes -
        Attachment UTMS_Frequency_Band.xlsx [ 126600 ]
        Attachment OT_Huawei_RAN All Nodes_Physical.docx [ 126601 ]
        Attachment OT_Huawei_RAN_4G_Logical & Interfaces_20-01-2026.docx [ 126602 ]
        Attachment OT_Huawei_RAN_3G_Logical & Interfaces.docx [ 126603 ]
        Attachment OT_Huawei_RAN_2G_Logical & Interfaces.docx [ 126604 ]
        Attachment Nodes_Matching.xls [ 126605 ]
        Attachment GSM_Frequency_Band.xlsx [ 126606 ]
        Indrasan Yadav made changes -
        Attachment UTMS_Frequency_Band.xlsx [ 126523 ]
        Indrasan Yadav made changes -
        Attachment OT_Huawei_RAN All Nodes_Physical.docx [ 126525 ]
        Indrasan Yadav made changes -
        Attachment OT_Huawei_RAN_4G_Logical & Interfaces_20-01-2026.docx [ 126522 ]
        Indrasan Yadav made changes -
        Attachment OT_Huawei_RAN_3G_Logical & Interfaces.docx [ 126520 ]
        Indrasan Yadav made changes -
        Attachment OT_Huawei_RAN_2G_Logical & Interfaces.docx [ 126519 ]
        Indrasan Yadav made changes -
        Attachment Nodes_Matching.xls [ 126524 ]
        Indrasan Yadav made changes -
        Attachment GSM_Frequency_Band.xlsx [ 126518 ]
        Indrasan Yadav logged work - 21/Jan/26 12:00 AM
        • Time Spent:
          1 day
           

          Worked on Huawei RAN static sheet for Node_Matching & HW_Matching and updated the FRS for same.

        Indrasan Yadav made changes -
        Remaining Estimate 1 hour, 30 minutes [ 5400 ] 0 minutes [ 0 ]
        Time Spent 5 hours [ 18000 ] 1 day, 5 hours [ 46800 ]
        Worklog Id 289247 [ 289247 ]
        Indrasan Yadav made changes -
        Remaining Estimate 0 minutes [ 0 ] 1 hour, 30 minutes [ 5400 ]
        Time Spent 6 hours, 30 minutes [ 23400 ] 5 hours [ 18000 ]
        Worklog Id 289245 [ 289245 ]
        Indrasan Yadav made changes -
        Baseline Start 2026-01-30 24:00 (set baseline based of initial work logging)
        Baseline End 2026-01-30 24:00 (set baseline based of initial work logging)
        Indrasan Yadav made changes -
        Remaining Estimate 0 minutes [ 0 ]
        Time Spent 6 hours, 30 minutes [ 23400 ]
        Worklog Id 289245 [ 289245 ]
        Indrasan Yadav made changes -
        Attachment OT_Huawei_RAN All Nodes_Physical.docx [ 126525 ]
        Indrasan Yadav made changes -
        Description Dear @Bassem Sabbagh,

        As discussed earlier, and as per the inputs shared in the first email of this thread, for Huawei RAN we are currently using five static sheets, with the status detailed below:

        Huawei RAN – Static Sheets Status
        1. GSM_Frequency_Band
        o This will be considered as-is based on the Ooredoo dump.
        o All extra/non-applicable data has been removed.
        o I have updated the static sheet as well as the FRS and attached them to JIRA OT-139.
        2. UMTS_Frequency_Band
        o Priority: Rule-based parsing as per FRS.
        o If the value is not found via rule, the static sheet will be used as fallback.
        o The required updates have been completed and attached to JIRA OT-139.
        3. Supported_Bandwidth
        o Although this sheet was earlier considered for parsing possible bandwidths based on the value of frequency band,
        o We already have FRS rules to parse:
         Uplink channel bandwidth
         Downlink channel bandwidth
         Frequency band
        o Hence, this static sheet will be ignored, and parsing will strictly follow the FRS rules.
        4. Node_Matching
        o In progress.
        o Will be shared by tomorrow EOD.
        5. HW_Matching
        o In progress.
        o Will be shared by tomorrow EOD.

        Please assign an AI-DEV resource to implement this change in Huawei RAN.


        Best regards,
        Indrasan
        Dear @Bassem Sabbagh,

        As discussed earlier, and as per the inputs shared in the first email of this thread, for Huawei RAN we are currently using five static sheets, with the status detailed below:

        Huawei RAN – Static Sheets Status
        1. GSM_Frequency_Band
        o This will be considered as-is based on the Ooredoo dump.
        o All extra/non-applicable data has been removed.
        o I have updated the static sheet as well as the FRS and attached them to JIRA OT-139.
        2. UMTS_Frequency_Band
        o Priority: Rule-based parsing as per FRS.
        o If the value is not found via rule, the static sheet will be used as fallback.
        o The required updates have been completed and attached to JIRA OT-139.
        3. Supported_Bandwidth
        o Although this sheet was earlier considered for parsing possible bandwidths based on the value of frequency band,
        o We already have FRS rules to parse:
         Uplink channel bandwidth
         Downlink channel bandwidth
         Frequency band
        o Hence, this static sheet will be ignored, and parsing will strictly follow the FRS rules.
        4. Node_Matching
        o This sheet is updated & removed all extra data which is not applicable for Ooredoo based on available dump. (Attached on same JIRA OT-139)
        o Updated the FRS for same.
        5. HW_Matching
        o In progress.
        o Will be shared by tomorrow EOD.

        Please assign an AI-DEV resource to implement this change in Huawei RAN.


        Best regards,
        Indrasan
        Indrasan Yadav made changes -
        Attachment Nodes_Matching.xls [ 126524 ]
        Indrasan Yadav made changes -
        Description Dear @Bassem Sabbagh,

        As discussed earlier, and as per the inputs shared in the first email of this thread, for Huawei RAN we are currently using five static sheets, with the status detailed below:

        Huawei RAN – Static Sheets Status
        1. GSM_Frequency_Band
        o This will be considered as-is based on the Ooredoo dump.
        o All extra/non-applicable data has been removed.
        o I have updated the static sheet as well as the FRS and attached them to JIRA OT-139.
        2. UMTS_Frequency_Band
        o Priority: Rule-based parsing as per FRS.
        o If the value is not found via rule, the static sheet will be used as fallback.
        o The required updates have been completed and attached to JIRA OT-139.
        3. Supported_Bandwidth
        o Although this sheet was earlier considered for parsing possible bandwidths based on the value of frequency band,
        o We already have FRS rules to parse:
         Uplink channel bandwidth
         Downlink channel bandwidth
         Frequency band
        o Hence, this static sheet will be ignored, and parsing will strictly follow the FRS rules.
        4. Node_Matching
        o In progress.
        o Will be shared by tomorrow EOD.
        5. HW_Matching
        o In progress.
        o Will be shared by tomorrow EOD.

        Please assign an AI-DEV resource to implement this change in Huawei RAN.


        Best regards,
        Indrasan
        Indrasan Yadav made changes -
        Attachment UTMS_Frequency_Band.xlsx [ 126523 ]
        Indrasan Yadav made changes -
        Attachment UTMS_Frequency_Band.xlsx [ 126521 ]
        Indrasan Yadav made changes -
        Attachment OT_Huawei_RAN_4G_Logical & Interfaces_20-01-2026.docx [ 126522 ]
        Indrasan Yadav made changes -
        Attachment UTMS_Frequency_Band.xlsx [ 126521 ]
        Indrasan Yadav made changes -
        Attachment OT_Huawei_RAN_3G_Logical & Interfaces.docx [ 126520 ]
        Indrasan Yadav made changes -
        Attachment OT_Huawei_RAN_2G_Logical & Interfaces.docx [ 126519 ]
        Indrasan Yadav made changes -
        Attachment GSM_Frequency_Band.xlsx [ 126518 ]
        Indrasan Yadav made changes -
        Field Original Value New Value
        Gantt Options Milestone (set to milestone: having a due date but zero effort)
        Planned Start 2026-01-30 24:00 (milestone: set planned start date to due date)
        Planned End 2026-01-30 24:00 (milestone: set planned end date to due date)
        Indrasan Yadav logged work - 20/Jan/26 12:00 AM - edited
        • Time Spent:
          5 hours
           

          Worked for Huawei RAN (Updated the static sheets & FRS as well)

        Indrasan Yadav logged work - 19/Jan/26 12:00 AM
        • Time Spent:
          1 day
           

          Worked for all using sheet in Huawei RAN & Updated the same as per current Ooredoo dump.

          People

          • Assignee:
            Indrasan Yadav
            Reporter:
            Indrasan Yadav
          • Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

            • Due:
              Created:
              Updated:
              Resolved:
              Planned Start:
              Planned End:
              Actual Start:
              Actual End:
              Date of Baselining:

              Time Tracking

              Estimated:
              Original Estimate - Not Specified
              Not Specified
              Remaining:
              Time Spent - 1 week, 4 days, 7 hours, 50 minutes Remaining Estimate - 5 hours
              5h
              Logged:
              Time Spent - 1 week, 4 days, 7 hours, 50 minutes Remaining Estimate - 5 hours
              1w 4d 7h 50m